Safety operation procedures for underground operation of drainage pipes and canals?

In recent years, China's production safety situation is still grim, and serious accidents have occurred from time to time, such as the "7 7" molten steel explosion accident of Zhongyuan Iron and Steel Company, the "711"electrocution death accident of Air Separation Group Co., Ltd., and the "7 21"poisoning suffocation accident of the western sewage treatment plant, which not only brought people's lives and property and the national economy. Therefore, it is very important for building a safer, happier and better harmonious society to study the safety management problems existing in production enterprises, establish and improve the safety operation rules, carry out construction in strict accordance with the operation rules and eliminate hidden dangers. Underground dredging, a seemingly ordinary job, is actually a high-risk job and should be carried out with a set of perfect safety work procedures. Therefore, based on many years' practical work experience, the author discusses the contents of the safety operation rules for underground drainage pipes and canals as follows:

A, underground workers should prepare safety signs in advance, check whether the mechanical equipment and tools used in the construction are safe, reliable, intact and applicable, and whether the equipped safety protection articles are complete.

Second, the construction materials, tools and other items piled up on the construction site shall not affect the traffic safety of pedestrians and vehicles.

Three, when working at night, should set up safety signs, set up a red light, in addition to the daytime and night operation procedures, generally not allowed to work in the well.

Four, when working under the well, there must be a construction director present to supervise the implementation of safety measures, and appoint two or more guardians.

5. Before underground operation, 4-5 manhole covers adjacent to upstream and downstream must be opened, and safety signs should be set to make the well naturally ventilated and discharge methane. Then use a multifunctional gas detector to detect the harmful gas, and confirm that the dangerous gas does not exceed the standard. Only with the consent of the person in charge of construction can the underground operation be carried out.

Six, in order to ensure the safety of construction personnel, enter the construction site must wear a protective cap, fasten the protective belt, and fasten the safety rope, wear a mask, before working in the well, it is forbidden to smoke in the well. At the same time, the site must be equipped with at least two gas masks and oxygen bags.

Seven, the construction personnel must firmly establish the idea of "safety first" when they enter the underground operation, and do not operate illegally or blindly. The person in charge of construction shall stop the illegal operation in time, give economic punishment to the illegal operators, and investigate the criminal responsibility of the major safety accidents.

Eight, underground work, prohibit children from playing nearby, and persuade pedestrians not to watch.

Nine, after the well, tools and accessories must be hung with a tool bag, it is forbidden to throw. There shall be no rocks, bricks, tools and other objects that may cause harm around the operation well/within the range of kloc-0/m.

Ten, long-term underground work, should take turns to go down the well, such as underground workers have dizziness, leg weakness, breath, nausea and other discomfort, must immediately go down to rest.

Eleven, underground work all electrical equipment must be explosion-proof, including lights, switches, etc.

Twelve, underground work, construction director and monitoring personnel must stick to their posts, concentrate, shall not engage in other operations, adhere to the underground propaganda for 2 minutes, pay attention to the observation, especially the state of underground workers, find problems in time, avoid safety accidents, it is forbidden to smoke underground, it is forbidden to throw objects and cigarette butts underground.

Thirteen, after the completion of the operation, the manhole cover should be restored in time, and the waste piled around should be cleaned up at the same time.

14. In case of operation danger, the whole rescuer needs to wear an oxygen bag to go down the well to save people, and take another oxygen bag and insert it into the nostril of the fainting person to absorb oxygen, and immediately evacuate the dangerous area, report to the construction director at the same time, and contact the emergency center in time to explain the accident site and specific conditions.

Fifteen, underground operators must be healthy and conscious. /kloc-people under the age of 0/8 and people with respiratory and cardiovascular diseases, allergies or skin allergies are not allowed to engage in this work after drinking alcohol.

Sixteen, in case of major natural disasters and storms and other bad weather, should try to reduce or cancel the underground work.

Units that have safety accidents have never lacked strict or even harsh safety regulations. It is often because the relevant responsible persons are indifferent to safety awareness and cannot be strictly implemented in accordance with relevant regulations. Therefore, from this perspective, it is of greater significance to effectively improve the safety awareness of relevant dredging workers and establish a strict safety accountability system and emergency rescue plan system.

If our underground dredging workers can operate in strict accordance with the safety regulations, and the inoue personnel and relevant responsible leaders take every operation seriously with a highly responsible attitude, the underground dredging work will definitely minimize the safety accidents.