Joke Collection Website - News headlines - Can Taijiao High-speed Railway reach Qinxian County?

Can Taijiao High-speed Railway reach Qinxian County?

Judging from the latest news, the Taijiao high-speed railway does not pass through Qin County.

At present, the Third Railway Survey and Design Institute Group Co., Ltd. has two plans for designing the route direction and site setting.

(1) recommended scheme. The line starts from Beige Station of Taiyuan Hub in the north and passes through Dongguan (line station), Qixian North, Gucheng, Wuxiang West, Xiangyuan East, Changzhi East, Changzhi County, Gaoping East, Jincheng East, Aibo and Jiaozuo.

(2) substitutes. Considering the complexity of coal resources and mined-out areas in Changzhi Jincheng, the Third Hospital has planned the second scheme, namely the alternative scheme: the line starts from Beige Station of Taiyuan Hub in the north, passes through Taigu West, Gucheng, Wuxiang West, xiang yuan West, Changzhi East, Huguan, Lingchuan, Jincheng East and Bo 'ai, and ends at Jiaozuo Station.

No matter which scheme is adopted, it is not considered to pass through Qin County and set up a station in Qin County. At present, it is very possible to recommend the scheme, so it is not unexpected to use it.