Joke Collection Website - News headlines - What does the safe and civilized construction fee for construction and installation projects include? It can be found in that file. -Beijing area

What does the safe and civilized construction fee for construction and installation projects include? It can be found in that file. -Beijing area

Whether it is a major in architectural decoration, electrical installation, intelligent installation, municipal administration, etc., the content of the safe and civilized construction measures fee is the same. Safe and civilized construction fees include: environmental protection fees, civilized construction fees, safety construction fees, and temporary facilities fees. (For details, please check the relevant quotas)

1. Environmental protection fees refer to various expenses required at the construction site to meet the requirements of the environmental protection department. It includes: costs for on-site construction machinery and equipment to reduce noise and prevent nuisance to residents; costs for closed storage or covering measures of cement and other easily flying fine particle building materials; costs for dust prevention and watering in projects; flushing and prevention of spillage of vehicles transporting earth, stone and construction slag costs for leakage, etc.; costs for on-site pollution source control, domestic waste cleaning and transportation, site drainage and sewage measures; costs for other environmental protection measures.

2. Civilized construction fees refer to the fees for civilized construction measures such as safety protection and civilized construction used in project construction. It includes: the cost of "five cards and one picture"; the cost of on-site wall beautification (including internal and external painting, whitewashing, slogans, etc.) and ceiling decoration; the cost of on-site toilet bowl whitewashing, veneer bricks, cement mortar floor or floor tiles, The cost of temporary toilet facilities in the building; the cost of decoration and beautification measures for other temporary facilities on the construction site; the cost of on-site sanitary facilities; the cost of drinking water equipment, showers, disinfection and other facilities that meet sanitary requirements; the cost of clean fuel for domestic use; the cost of preventing gas poisoning , the cost of anti-mosquito bites and other measures; the cost of hardening the operating site at the construction site; the cost of on-site greening and comprehensive public security management; the cost of on-site medical and health care equipment, supplies and first aid personnel training costs; the cost of heatstroke prevention and cooling, electric fans for on-site workers , air conditioning and other equipment and electricity costs; other civilized construction measures costs.

3. Safety construction fees refer to various expenses required for safe construction at the construction site. It includes: the preparation of safety information, special plans for special operations, the purchase of safety construction signs and the cost of safety publicity; the "three treasures" (safety helmets, safety belts, safety nets), "four exits" (staircases, elevator shafts, passages) entrances, reserved openings), "five edges" (balcony edges, floor edges, roof edges, pit edges, both sides of the unloading platform), horizontal protection frames, vertical protection frames, outer frame closures and other protection costs; costs for safe electricity use in construction, including three-level power distribution in distribution boxes, two-level protection device requirements, external power protection measures; safety protection measures for cranes, tower cranes and other lifting equipment (including derricks, gantry) and external elevators (including warning signs) and the cost of edge protection of the unloading platform, inter-layer safety doors, protective sheds and other facilities; the cost of inspection and testing of hoisting machinery at the construction site; the cost of safety protection facilities for the protective sheds and fences of construction machinery and tools; construction safety The cost of protective passages; the cost of purchasing safety protection supplies and equipment for workers; the cost of configuring fire-fighting facilities and fire-fighting equipment; the cost of electrical protection and safety lighting facilities; and the cost of other safety protection measures.

4. Temporary facility fees refer to the fees for temporary buildings, structures and other temporary facilities for living and production that construction companies must erect for construction projects. It includes: the installation, maintenance, dismantling or amortization costs of using colored, shaped steel plates, bricks, concrete blocks and other enclosures at the construction site; the erection, maintenance, dismantling or amortization costs of temporary buildings and structures at the construction site, such as Temporary dormitories, offices, canteens, kitchens, toilets, clinics, temporary cultural and welfare buildings, temporary warehouses, processing plants, mixing stations, temporary simple water towers, pools, etc.; erection, maintenance, dismantling or amortization costs of temporary facilities at the construction site , such as temporary water supply pipelines, temporary power supply pipelines, small temporary facilities, etc.; temporary simple road laying within the specified scope of the construction site, temporary drainage ditches, drainage facilities installation, maintenance, dismantling and drainage costs; other temporary facilities erection, maintenance, dismantling or Amortization expense.