Joke Collection Website - News headlines - How to write a contract
How to write a contract
Matters needing attention in writing the contract:
The first is the first part. Some parties use Party A and Party B to indicate the date, place and number of the contract.
Second, the text. The introduction clarifies the purpose, and this contract was signed by both parties after full consultation. The subject matter of a contract refers to the same object of the parties, which can be goods, services, engineering projects and intellectual achievements. Quantity and quality must be measured and measured according to legal standards. Loans and fees, the amount of delivery. Time limit, place and method of performance. Liability for breach of contract and settlement of disputes.
Third, the tail. Signature and seal of the person at that time, addresses, telephone numbers, fax numbers, postal codes and bank accounts of both parties.
For details, please refer to the contract samples provided by this site and make modifications according to the actual situation.
Model contract (1)
Client: _ _ _ _ _ hereinafter referred to as Party A.
Detailed address: (1) Detailed address: (2) Detailed address: (1) Detailed address: (2) Detailed address.
Telephone: (mobile phone) Telephone: (mobile phone) Telephone: (mobile phone) Telephone: (mobile phone)
Service provider: Shanghai Qi Hui Property Management Co., Ltd., hereinafter referred to as Party B.
Detailed address: (1) Detailed address: (2) Detailed address: (1) Detailed address: (2) Detailed address.
Telephone: (mobile phone) Telephone: (mobile phone) Telephone: (mobile phone) Telephone: (mobile phone)
According to the Contract Law of People's Republic of China (PRC), Party A and Party B negotiate on the provision of property security services by Party B to Party A. We hereby sign the following contract.
Article 1 Responsibilities of Party A and Party B
1. Party A shall formulate safety rules and regulations for entrance and exit of doormen, doormen, personnel, vehicles and materials, and notify all employees to abide by them.
2. Party A shall improve the safety facilities in Party B's responsibility area, equip with necessary safety equipment and set up good lighting.
3. Party A shall install alarm facilities in key parts of the safety responsibility area.
4. When Party B's security guards are injured and injured due to emergency rescue and disaster relief and cracking down on illegal crimes, Party A is obliged to provide assistance and give certain economic compensation.
5. Party B shall carry out strict team management, professional training, responsibility requirements and discipline for security guards.
6. The security guard designated by Party B is responsible for Party A's guard duty and night patrol (only one security guard is on duty, whose main duty is to watch the door). Visitors should check the published materials according to the export list, check their certificates and go through the entry and exit formalities, and assist employees to go through the entry and exit formalities according to Party A's regulations.
7. The security personnel appointed by Party B shall conduct safety inspection at night and do a good job of fire prevention and theft prevention. If suspicious persons or cases are found, they shall immediately notify the personnel on duty of Party A or call the police, and at the same time protect the site and make detailed records for future reference.
8. The security guards are under the dual leadership of Party A and Party B, abide by Party A's relevant rules and regulations, and accept Party A's business inspection, guidance and supervision. Where Party B violates the opinions of Party A, it shall be handled as appropriate.
9. If the security guards dispatched by Party B do not meet or are not competent for Party A's work requirements, Party B shall dispatch security guards again.
Article 2 Distribution of power
1. Party B has provided _ _ _ _ property security guards for Party A, including _ _ _ _ _
2. Security guards should wear uniforms on duty and Qi Hui property security badges.
3. If the team members are absent due to illness or personal leave, Party B will make arrangements. If the overtime hours exceed 40 hours per week or national statutory holidays, Party B will pay overtime according to the relevant provisions of the Labor Law. If Party A needs security guards to undertake services other than this contract, it shall be implemented with the consent of both parties.
Article 3 Economic accounting
1. As agreed by both parties, the security service fee is RMB Yuan only.
2. The overtime pay for national statutory holidays is RMB _ _ _ _ _ _ _ _
3. The food allowance is _ _ _ _ _ yuan per person per month, and * * _ _ _ yuan.
4. Any future salary increase ordered by the state (including employee salary adjustment and price adjustment) shall be appropriately adjusted during the next contract period through negotiation between Party A and Party B. Party A shall take care of security personnel in terms of life and welfare as much as possible.
Article 4 the validity of the contract
1. This contract shall come into effect as of the date of signature by both parties.
2. If it is necessary to extend the term or terminate the contract when it expires, both parties must notify each other one month before the termination of the contract.
3. During the execution of this contract, both parties shall not change or terminate this contract without authorization. If there are any outstanding matters, both parties shall settle them through consultation. Either party who terminates the contract without the consent of the other party shall be liable for breach of contract.
4. This contract is in quadruplicate. Party A and Party B each hold two copies, which are equally authentic.
Article 5 Term of Contract
This contract shall come into effect as of? From year month day to year month day.
Seal of the entrusting party (Party A) and seal of the service party (Party B)
Legal representative? company representative
Signature signature
(Entrusted representative)
Signing place:
Date of signature: year month day.
Model Contract (2)
Employer (individual): (hereinafter referred to as Party A)
Employer (individual): (hereinafter referred to as Party B)
According to the relevant clauses and provisions of the Contract Law of People's Republic of China (PRC) and the Construction Law, both parties have reached the following agreement on the specific conditions of road contracting projects, which shall be followed by * * * *:
I. Overview of the Project:
1, project name:
2. Project site
3. Project content and scope: Complete the civil works above the foundation of Party A (including internal and external painting, excluding the installation of water and electricity pipelines), including the construction below the positive and negative zero line (including the zero line). Specific drawings shall prevail.
4. Contracting method: contract the cleaning workers, and Party A shall provide the binding wires (lead wires) required for the shelves.
5. Construction date:
6. Quality grade: excellent
7. Total project cost (cleaning fee): calculated according to the following prices: ① Cast-in-place part1kloc-0/0 yuan/㎡ (excluding toilet); ② Others are in 75 yuan/㎡; ③ The specific construction area shall be subject to the actual measurement (except the construction area below the positive and negative zero line (including zero line)).
Two. Party A's work
1. Party A shall provide the building materials such as cement, steel bars, sand, stone, tie wire (lead wire) required for the civil engineering frame, and ensure the supply of building materials of Party B. ..
2. If Party A needs to change the drawings, it shall notify Party B in advance.
Three. Work of Party B:
1, according to the construction site and construction drawings, do a good job in construction.
2, shall not arbitrarily change the construction drawings.
3. Party B shall save materials on the premise of ensuring the engineering quality, and the concrete mortar shall be constructed according to the specified mixture ratio.
4, the construction site completes the safety fence and civilized construction.
5. Before the finished product of the project is completed and delivered for use, Party B shall protect it by itself, and Party A shall be responsible for the completion acceptance and delivery to Party A. ..
6. Party B must guarantee the construction quality. The main structure and completion quality must meet excellent standards. All consequences caused by quality problems shall be compensated by Party B. ..
Fourth, the construction period, acceptance
1. construction period: the construction period from the start of the main project to its completion is 50 days (excluding painting of internal and external walls).
2. The project quality must be comprehensively checked by the builder sent by Party A. ..
3. After the completion of each floor, the construction of the next floor can only be carried out after the acceptance of the builder designated by Party A. ..
Verb (abbreviation for verb) Payment and prepayment of project funds:
1. The first floor structure is paid in advance 1000 yuan, the second and third floors are paid in advance 1000 yuan, the ceiling tile is paid in advance 1000 yuan, and the painting is paid in advance 1000 yuan. The rest projects will be paid in one lump sum within five months after the acceptance of the guest house.
2. All advance payment and settlement payment can only be paid after the construction party designated by Party A has passed the inspection.
3 final accounts of funds should be adjusted according to the actual completion figure.
Other intransitive verbs:
1. During the construction period, Party B shall strictly abide by the safety operation regulations. If any safety accident occurs during the construction period, Party B shall bear all responsibilities and expenses.
2. This contract shall come into effect as of the date of signing.
3. This contract is made in duplicate, with each party holding one copy.
Party A (seal)? Party B (seal):
Representative of Party A (signature): Representative of Party B (signature):
Date of signature: year month day.
Model Contract (3)
_ _ _ _ _ (hereinafter referred to as Party A) is the decoration information room (_ _ _) (hereinafter referred to as Party A).
I. Project:
1, four rooms (three rooms and one living room, hereinafter referred to as four rooms), wooden floor.
2. The two bathrooms are waterproof, tiled and tiled.
3. Install the toilet and bedpost basin in the main bathroom;
4, public toilets installed column basin;
5. Make the kitchen waterproof and install cabinets;
6. Bedroom and bathroom door
7. For matters not specified in detail, Party A shall put forward plans and discuss them.
Second, the way of contracting: Party A must guarantee the materials needed during the renovation according to Party B's requirements (Party B shall notify Party A in advance), and Party B shall be responsible for the construction.
Three. Quality standard: the construction quality shall meet the safety requirements and the decoration standards required by the state, and the decoration quality shall not be lower than the decoration standards of the same building type recognized by both parties.
Four. Construction period: from _ _ _ _ _
5. Project cost: According to the attached price, Party B will purchase materials and install them. If there is any change, the settlement of the change order approved by both parties shall prevail.
Payment method of intransitive verbs: After signing this contract, Party A will pay RMB _ _ _ _ _ _ _.
Seven. Other matters: The specific requirements of the renovation project shall be put forward by Party A, and Party B shall implement ... Matters not covered in this agreement shall be settled by both parties through consultation. This agreement shall come into effect as of the date of signature by both parties.
Eight. This agreement is made in duplicate, each party holds one copy, which has the same effect.
Party A: Party B:
_ _ _ _ _ _ _ _ _ _ _ _ _
- Related articles
- The State Council Finance Committee made it clear that it actively responded to the "Bitcoin Mining" computing bee and actively safeguarded the interests of users.
- What are the good ways for children to read?
- Is the epidemic serious if people are not allowed to go downstairs for three days?
- Tik Tok Duanzi Daquan
- Draft two promotional slogans for the Chinese philosophy of peace
- Daily advertising words or product descriptions...Chinese and English translation
- What's the name of the one used with the broom?
- Working motto of service personnel
- How does the elderly care service industry define the importance of party building brand?
- What is the origin of the name of Xiangshan Villa in Bai Gongguan, Chongqing?