Joke Collection Website - News headlines - Summary report on safety production in flood season
Summary report on safety production in flood season
For more "Flood Season Work Report", please click (↓↓↓↓).
★ Summary of tourism safety work in flood season
★ Summary of simple flood control work: 5 articles
★ 5 articles summarizing flood control work
★ 5 Flood control report in annual work summary
★ Personal summary of 5 selected books on flood control work
Safety production report in flood season 1
In order to do a good job in the investigation and rectification of potential safety hazards in flood season, prevent all kinds of accidents and ensure the safety and smoothness of the North Approach Road in flood season, according to the requirements of the Notice of Shanxi Provincial Highway Bureau on Carrying out Safety Inspection Activities in Flood Season, our office set up an inspection team for the rectification of potential safety hazards in flood control roads, and made a comprehensive and detailed inspection of the managed and maintained sections, focusing on the implementation of flood control measures and the rectification of potential safety hazards in the North Approach Road, bridges and slope protection projects, making flood control preparations for key parts and formulating a feasible construction plan in flood season.
I. Guiding ideology and basic objectives
The guiding ideology of flood control is to implement the policy of "safety first, constant vigilance, prevention first and all-out rescue". Strengthen the awareness of flood control responsibility, base on flood control and flood fighting, plan and arrange as early as possible, focus on flood control, pay close attention to weak links, and earnestly do a good job in various flood control preparations.
The basic goal of flood control is: on the basis of ensuring the safety and quality of construction, to promote the orderly and smooth progress of various projects, to ensure the safety of flood control and to avoid engineering safety and construction safety accidents.
Second, the working mechanism
1, strengthen the consciousness of flood control responsibility, and clarify the responsibility and scope of flood control. During flood control, flood control, highway maintenance and engineering construction should be arranged, inspected and evaluated in the same way, and on the premise of ensuring flood control safety, the on-site construction should be promoted in an orderly manner.
2. For projects involving flood control and flood fighting, our department has focused on strengthening the preparation of flood control and flood fighting plans, and formulated a practical flood control and flood fighting duty system to ensure smooth communication during flood season and handle emergency affairs at any time. Flood control personnel on duty and contact telephone number shall be submitted to the Provincial Bureau in writing.
3, flood control personnel on duty to fill in the flood control duty log, and carefully record the actual situation, processing results, etc. In case of major problems, report to relevant parties in time.
Third, give full play to the guiding role of meteorological departments.
Pay special attention to the meteorological and hydrological information released by the Central Meteorological Observatory and the Pinglu County Meteorological Observatory where the project is located, respond to the information released by the meteorological department in time, and implement various preventive measures.
Fourth, implement emergency rescue drills.
Actively organize and summarize emergency rescue drills to meet the needs of flood control. At the same time, in view of the shortcomings in the exercise, good suggestions are put forward and corrected, and the flood prevention plan is revised and improved to lay a solid foundation for safe flood prevention.
Five, formulate and improve the flood control work plan and measures.
1, set up flood control organizations, perform their duties, and set up flood control duty and facilities.
Patrol system before and after the rain in the work area, set up flood control and rescue teams, and carry out relevant knowledge education and training.
2. Formulate and implement the construction progress, construction measures and construction material reserves of major flood control projects.
3. Strengthen the safety monitoring of unstable components.
4, according to the design requirements to complete the flood control project construction.
Six, the implementation of logistics support measures
1, do a good job in emergency storage of flood control engineering materials. The reserve of various flood control materials was inspected, and rectification was required within a time limit to ensure project safety and flood control.
2. We should seriously organize publicity and education activities on heatstroke prevention and first aid knowledge, do a good job in drinking water, food hygiene, heatstroke prevention, epidemic prevention and poisoning prevention for on-site workers, and designate special personnel to be responsible for the implementation of follow-up measures to ensure the personal safety of workers.
Seven, increase the intensity of flood control safety inspection, the implementation of various flood control measures, to carry out special inspections of high temperature safety production in summer.
During the flood season, our bureau has always combined daily highway maintenance, construction safety management and flood control, organized a joint inspection team for safety and flood control, inspected the construction safety and flood control work of maintenance centers and construction teams, completed the construction of flood control projects according to time requirements, and held special meetings to review and coordinate flood control measures at important parts.
At the same time, the project department has been focusing on the characteristics that construction workers are prone to fatigue, heatstroke and accidents in summer, combining with special rectification work, and seriously carrying out safety production inspections to nip in the bud. Actively carry out self-examination and self-correction, focusing on preventing heatstroke, electric shock, lightning strike, falling from a height, food poisoning and fire.
Report on Work Safety in Flood Season (2)
Recently, affected by heavy rainfall, some villages have hidden dangers of geological disasters to varying degrees, and the flood control safety situation is very severe. In order to further strengthen the safety production management in flood season in my hometown, prevent all kinds of safety accidents and ensure the safety of people's lives and property in flood season, my hometown put forward five measures to do a good job in safety production in flood season.
First, strengthen leadership and conscientiously implement the responsibility system for production safety. My township held a special meeting to study and formulate a specific plan for the safety situation in flood season within its jurisdiction, set up a leading group, and set up a leading group for production safety in flood season with the township head as the leader, the deputy township head in charge of safety as the deputy leader, and the main responsible persons of relevant units as members, which achieved early preparation, early arrangement and early deployment, defined the objectives and tasks, and ensured the effective implementation of various work measures.
The second is to investigate and eliminate risks, highlight key points and prevent all kinds of accidents. Since June, we have conducted a comprehensive investigation of hidden dangers of geological disasters in all administrative villages, all primary and secondary schools and all road sections in the township, registered hidden dangers one by one, and focused on monitoring hidden dangers. First, according to the frequent occurrence of geological disasters in mountainous counties of our region, the township and land departments were organized to carry out a major inspection, and a three-level "look at people" responsibility system was implemented for the hidden points of geological disasters in towns and villages of our region, and the hidden points of geological disasters were closely monitored to ensure that people could be evacuated in time in case of danger, and the danger was reported in time. At the same time, sign letters of responsibility with towns and villages, clarify responsibilities, and set up warning lines in dangerous areas. The second is to implement the three-level responsibility system of "people staring at households" for dangerous houses in my township, and at the same time evacuate the people still living in dangerous houses urgently and transfer them to safe areas to avoid risks. Set up a warning line near the dangerous house, and it is strictly forbidden for the masses to get close. Third, warning signs and warning lines are set up in hidden danger sections such as slope collapse, subgrade collapse, road collapse and mountain collapse in towns and villages to remind pedestrians and vehicles to pay attention to safety. Fourth, schools located on slopes are required to arrange teachers to be on duty 24 hours a day to keep information flowing. In case of danger, teachers and students can evacuate in time.
Third, improve the plan and implement measures. According to the characteristics of flood season in our administrative region, our township revised the emergency plan for dealing with geological disasters and road traffic. A leading group for township rescue work was set up to implement the responsibilities of all relevant units. Carry out pre-plan learning activities in the whole town, check the key parts of flood control according to the actual situation of each unit, and determine the next stage flood control task according to the problems found. At the same time, "disaster prevention cards" and "hedge cards" are issued to rural villagers in geological disaster areas, making them well known. Conscientiously implement the preparation of flood control materials and the formation of rescue teams, clarify the main person in charge, carry out rescue drills in a timely manner, and enhance the ability to deal with emergencies.
Four, strengthen publicity and education, improve the national safety awareness. Make full use of the opportunity of "Safe Production Month" to strengthen people's understanding of all kinds of disasters easily caused in flood season, and widely publicize the knowledge of safe production in summer flood season by setting up publicity columns, posting publicity slogans, and issuing "disaster prevention cards" and "risk avoidance cards" to the masses, so as to effectively improve people's awareness of flood control and disaster prevention and their self-help ability.
Five, strengthen the duty scheduling work. Conscientiously implement the 24-hour duty system and regular notification system, establish and improve the disaster quick report system, and ensure the smooth reporting channels of emergency information. Contact the meteorological department on time, closely grasp the rain situation, and carefully analyze the weather changes. When there is a big flood, the main leaders are on duty in person, mastering the dynamics, commanding from the front, making decisions and commanding in place. Major floods and dangerous situations shall be reported in time.
Report on Work Safety in the Third Quarter
Following the "Emergency Notice on Further Strengthening Work Safety in Flood Season" issued by the Work Safety Committee of _ _ _ _ _ _ _ _ County People's Government, the township party committee and government attached great importance to it, combined with the actual situation, and carefully compared the inspection contents. Now, the investigation and monitoring of geological hazards, work safety in flood season (key enterprises, construction, road traffic, fire protection, schools and other fields) and the work on duty are notified as follows:
I. Work carried out
(1) Strengthen leadership and strictly implement the responsibility system. In order to implement the requirements of "Party and government share responsibility, double responsibility for each post, and make concerted efforts to manage * * *", and improve the safety production responsibility system of "managing industry must manage safety, managing enterprises must manage safety, and managing production and operation must manage safety", township party committees and governments attach great importance to safety production in flood season, and timely adjust and enrich the safety production leading group with the secretary as the team leader, the township mayor and the chairman of the National People's Congress as the deputy team leader, and the members of the team and the heads of relevant departments as members. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(two) to seriously carry out the investigation of hidden dangers before the flood season, and timely implement the rectification. According to the requirements of the county government, before the arrival of the main flood season, the township security office, the traffic control office and the village committee conducted a comprehensive investigation on seven hidden dangers of geological disasters and mountain torrents, including Xinghe River, banks of Qiaoxi River, residential areas, traffic lines, schools, key enterprises, hydropower stations, gravel yards, roads and bridges, and water conservancy and electric power facilities, analyzed and evaluated the current situation and development trend of each point, and put forward specific preventive opinions and feasible disaster prevention and mitigation measures. At present, there are still hidden dangers that need to be rectified by the relevant departments of the county: 1 and Qiaoxi three groups of street trees are dead, endangering pedestrians, vehicles and houses. 2. Embankment dam is set on the river course of broken sand field, which affects the normal flood discharge. 3. The safety distance between six or seven groups of high-voltage lines and trees is not enough. 4. The north entrance of _ _ _ _ tunnel lacks drainage facilities. When it rains heavily, rainwater overflows the dormitory room of Ganziping Power Station under the threat of road surface. Tunnel and the original 108 intersection lack deceleration measures, and two cars in the _ _ _ _ _ _ direction are prone to collision.
(three) the full implementation of the plan, do a good job in disaster prevention and avoidance propaganda. Scientific plan is an important prerequisite for safe production in flood season. In order to implement the spirit and requirements of the State Council, provincial, municipal and county safety production work conferences, and ensure the thoroughness, meticulousness and scientificity of township safety production emergency plans and geological disaster emergency plans, various localities have successively revised and improved township safety production emergency plans, sudden geological disaster emergency plans and hedging plans, adjusted the members of prevention and control units, and supplemented emergency measures.
At the same time, the publicity of various programs has been intensified. Conduct disaster prevention and avoidance drills at the disaster site, and post "disaster prevention and avoidance cards" on the doors and walls of threatened farmers in time, so that every farmer can understand the alarm mode and evacuation route and be able to evacuate in an orderly manner in case of danger.
(four) strictly implement the flood control emergency material reserve, so as to be prepared. Firmly establish the idea of fighting against major floods and seizing major risks, implement the flood control policy of "safety first, standing by, prevention first, and all-out rescue", and in accordance with the principle of combining standing by the township government with merchants' storage, the whole township raised more than 20,000 yuan this year to supplement emergency materials for flood control. Signed a consignment agreement with three merchants to prepare emergency materials for flood control.
(five) actively do a good job in the construction of emergency rescue teams and fully prepare for emergency rescue. In the construction of emergency rescue team, our township adheres to the requirements of superiors and the needs of work. The rural armed forces department has set up a rescue team with the backbone militia as the main body, and an emergency detachment has been set up in the village to ensure that when a disaster occurs, it can be called at once and the battle will be won, so as to minimize the disaster losses.
(six) strictly implement the duty system in flood season to ensure the smooth flow of emergency system information and timely and accurate information submission. The township strictly implements the system of duty, inspection, quick report and emergency treatment in flood season, and does a good job in inspection, monitoring and early warning and forecasting of geological disasters to ensure smooth government orders and fast information, and timely and effective measures for disaster prevention, disaster avoidance, disaster relief and treatment. Adhere to the 24-hour duty system to ensure that in case of danger and disaster, emergency treatment can be organized immediately, the danger and disaster can be confirmed and the emergency plan can be started.
(seven) to carry out the "safety month" activities, strengthen the supervision of production safety. Organize the staff of township security office and traffic control office, strengthen the inspection of road safety production and traffic, and do a good job of "full production month". In the inspection activities, enterprises with potential safety hazards are ordered to take immediate measures to rectify and implement. Through this inspection activity, the awareness of safety production of enterprises in the jurisdiction has been effectively improved.
Second, the next step plan
My township will further seriously study and understand the relevant requirements of the county safety committee on strengthening safety production in flood season and the spirit of the important speech of city and county leaders, fully understand the importance of safety production, earnestly hold the bottom line of safety production, carefully arrange and implement the safety production work of all units in the town, and promote the continuous and stable situation of safety production in our town. We will implement it from the following points.
1, continue to investigate hidden dangers in production safety, find hidden dangers in time, and rectify hidden dangers within a time limit.
2. Intensify the rectification of hidden dangers, find 1 hidden dangers 1 hidden dangers, put the responsibility on people, supervise the rectification of hidden dangers on people, implement and improve the hidden danger registration account, cancel the numbers one by one, and never let go of one, in strict accordance with the requirements of "Five Implementations" (measures, responsibilities, funds, time limit and plan).
3. Strengthen supervision and accountability. In view of the problems found in the safety inspection, we will strictly follow the principle of "four unifications" and deal with the relevant responsible persons strictly and quickly according to law, and will never tolerate them.
Report on Work Safety in the Fourth Quarter
In order to seriously implement the requirements of the Emergency Notice on Further Strengthening Safety Management and Carrying out Safety Inspection of Hazardous Materials, our project department immediately deployed flood control safety work after receiving the notice. Adhere to strict, detailed, practical, high standards and strict requirements from beginning to end, and always put flood control safety production above all else to ensure safe flood control. Combined with the engineering characteristics of the project undertaken by our project department, the safety inspection report in flood season is summarized as follows:
First, strengthen leadership and clarify key points.
After receiving the Emergency Notice on Further Strengthening Safety Management and Carrying out Safety Inspection of Dangerous Goods, the leaders of our project department attached great importance to it and immediately organized all the managers of the project department to convey the spirit of learning notice. On the basis of deeply understanding the spirit of the notice, they studied, deployed and carried out the following work:
1, a leading group for flood control safety inspection activities was established. The project manager is the team leader, the person in charge of safety and technology is the deputy team leader, and the full-time safety officer, technician and builder are the members.
2. The emergency plan for flood control and flood fighting prepared by the security department was carefully reviewed, and the three-level examination and approval system was strictly implemented to ensure the feasibility of the plan.
3, the project leader personally led the flood control work on duty, serious flood control duty discipline, a 24-hour duty system, especially at night, must ensure smooth communication, personnel on the job, prevention in place.
4. Actively communicate with Dazu County Flood Control Office, pay close attention to the weather forecast and the dynamic information of rain and water regime of rivers and reservoirs passing through the construction, and timely notify relevant leaders and construction units to ensure smooth information, accurate early warning, scientific command and effective emergency response.
5. Strictly carry out touching.
Electricity, lightning protection and other safety measures. The key points of rectification of hidden dangers in production safety at the construction site in flood season were studied and formulated, and conveyed to the first and second work areas, requiring all work areas to study and implement them seriously. The key points of rectification are as follows:
(1), carry out on-site electrician safety knowledge training in flood season, and strengthen the safety awareness and self-protection ability of all employees in rainy season.
(2), for all kinds of electrical equipment and hand-held power tools, must achieve two levels of leakage protection, all kinds of electrical equipment must be tested once a month insulation resistance, resistance can not meet the specified requirements immediately stop running, it is strictly prohibited to use, leakage protector test once a month, does not meet the requirements of the immediate replacement, and make test records.
(3) Cable joints shall be provided with rain-proof and moisture-proof measures to prevent short circuit and electric shock accidents caused by rain immersion. Low-voltage transformer must have rain-proof, moisture-proof and smash-proof measures.
(4) For equipment, temporary oil storage points, distribution rooms, distribution boxes, switch boxes, etc. Waterproof, flood control and lightning protection measures should be taken for the water-stabilized mixing station, and the shell should be grounded.
(5) Strengthen the drills of emergency plans for flood control and emergency rescue.
(6) Thoroughly clean the drainage ditches in the production and living areas to ensure smooth rainwater drainage.
Second, hidden danger investigation and special inspection
On June 5, the project department conducted a flood control safety inspection on the construction site. All work areas should strictly follow the spirit of the notice, carefully investigate and rectify hidden dangers of flood control safety production, and improve flood control safety production facilities. All work areas have implemented flood control safety knowledge education, maintenance and replacement of safety protection facilities, safety responsibilities and investigation of potential safety hazards, and all work areas have met the requirements of the Notice.
Third, summary.
Through the flood control safety inspection activities, the project department has achieved good results, improved the safety awareness of all employees, made the safety production and safety management of our project department take a new step, further enhanced the sense of responsibility of safety management personnel at all levels, and laid a solid foundation for better safety management in the future.
Report on Work Safety in the Fifth Quarter
In order to conscientiously implement the relevant national, provincial, municipal and county documents and the spirit of the meeting, strengthen the work of safety in production in the current period, prevent and reduce all kinds of accidents, and ensure the stability of the situation of safety in production, the third "Basic Year of Safety in Production" concentrated action was carried out, and a comprehensive, detailed and in-depth safety inspection was organized in combination with the actual situation of the unit. Organize special safety inspection of key parts.
(1) Strengthen flood control safety inspection.
In view of the rainy situation in summer, according to the early warning and forecast of flood disaster weather and the timely grasp of relevant information, we should earnestly do a good job in flood control work of our unit, improve the emergency plan, make full preparations, fully implement our responsibilities, and constantly strengthen measures to do a good job in flood control and safety production.
(two) to strengthen lightning protection, heatstroke prevention and cooling safety inspection.
In view of the unfavorable climatic conditions such as high temperature, intense heat and rainy weather, and the seasonal characteristics of frequent accidents such as electric shock, poisoning, heatstroke, lightning strike, fire and explosion, we will earnestly strengthen lightning protection, heatstroke prevention and cooling. The implementation of lightning protection, heatstroke prevention and cooling measures was comprehensively inspected.
(three) to strengthen the safety inspection of crowded places.
According to the characteristics of the unit, the comprehensive inspection of evacuation passages, fire-fighting facilities, emergency broadcast lighting, fire sources and power supplies in crowded places has been strengthened, and personnel entry and exit registration has been made. In order to ensure normal order, do a good job in patrolling the hospital, and conscientiously implement emergency plans and personnel management and guidance measures.
(four) to strengthen the safety inspection of special equipment.
Strengthen the use registration and daily maintenance of special equipment; Operators hold valid certificates to work at their posts; Safety accessories and safety protection devices have been inspected (calibrated) according to regulations; Improve the emergency plan and carry out emergency drills.
Take effective measures to implement the objectives and requirements of the third centralized action of "Basic Year of Safety in Production" to each post, and strengthen supervision, inspection and guidance. The third concentrated action of "Basic Year of Safe Production" highlights key time periods, key parts, important facilities, key equipment and key posts, and at the same time pays attention to daily inspections, taking into account other workplaces and posts, and comprehensively and thoroughly carries out governance actions, striving to reduce the total number of accidents and curb the occurrence of serious accidents.
Related articles of Summary Report on Safety Production in Flood Season:
★ Summary report on safety production in flood season
★ Year-end summary report on flood control in 2025.
★ There are 5 model essays on the year-end summary report of flood control work.
★ Summary of simple flood control work in 2020: 5 articles
★ 5 Flood control report in annual work summary
★ Five Summaries of Safety Production of Water Conservancy Units in 2020
★ Summary of tourism safety work in flood season
★ Summary of flood control work in 2020: 5 articles.
★ 5 summary essays on safety production.
★ Five selections of summary model essays on work safety in production.
var _ HMT = _ HMT | |[]; (function(){ var hm = document . createelement(" script "); hm.src = "/hm.js? 2697 f5ae 036705 b 1309 c 90 adafb 920 af "; var s = document . getelementsbytagname(" script ")[0]; s.parentNode.insertBefore(hm,s); })();
- Related articles
- The main contents of advanced fire fighting training for ships are
- How to draw English blog of Winter Olympics
- What benefits does comprehensive physical education bring to parents and children?
- One of the following slogans is () (3 points) A. A slogan is posted at the door of a library: the economy is developing and the population is declining.
- How to learn English well
- 66th birthday speech
- Idioms, poems, etc about alumni.
- 8 words motivational slogan for junior high school classroom
- The three-day tour route of Maoshan Scenic Area recommends a one-day tour guide of Maoshan Scenic Area.
- How about Jiangsu Anfeng Jian 'an Engineering Co., Ltd.?