Article 1 Sample Annual Work Summary for a Construction Unit
As an on-site staff member of the Engineering Department's on-site project department, my work goals and tasks are: to provide Party A and the project department with all my heart and soul. Provide high-quality services, supervise safe and civilized production, project quality, and project progress, prevent risks, and contact the company in a timely manner to strive to minimize corporate risks.
At the beginning of the year, I was sent to work in the project department. This project is a strip park about __ kilometers long from __ in the west to __ in the east. Since the project is located on __ Road, close to __ Park to the west, and there are many tourists and pedestrians on the road, the focus of the project is safe and civilized production. After I went to the project department, I started working in the following aspects in accordance with the company's policies and requirements and the goals and tasks assigned by the engineering department, combined with the specific conditions of the project department:
1. Safe and civilized production
1. In terms of project image: When I went to the project department, I brought the work clothes customized by the company, and urged the project department managers to promptly customize and hang publicity slogans according to the company's requirements.
2. According to the requirements of the company's safety department, the project department was urged to produce warning slogans and publicity slogans.
3. Strengthen the safety of on-site tree planting: Because there are many pedestrians and tourists at the construction site, pedestrians often gather around when planting big trees. Therefore, construction workers must be assisted to maintain site safety every time and pedestrians are advised to stay away from the site. , It is strictly forbidden to stand under the crane's boom arm, and the pit to be planted should be fenced to prevent pedestrians from falling.
4. Strengthen on-site electricity safety management: convey the requirements of the company's safety department to the project department, and instruct construction personnel to hold certificates when working, and wires must use leather cables, and the use of flower wires is strictly prohibited.
5. Convey the company’s documents requiring on-site safety inspections and strict management during holidays, drought relief, and flood control, and instruct on-site managers to implement them as required.
2. Project quality
Since most of the on-site construction workers are planting seedlings for the first time, they often communicate and learn from each other during the construction, and try their best to complete the planting work with high quality and quantity.
1. Quality acceptance of seedlings: After the seedlings arrive at the site, we will provide reasonable suggestions to the construction workers on the diameter at breast height, crown width, branch points, soil ball size, etc. of the seedlings according to the owner's requirements for seedling specifications.
2. Seedling planting: When planting seedlings, provide rational suggestions on the cutting of seedlings, bundling and lifting of trees, filling of planting soil, and irrigation of root water.
3. Prevention and control of plant diseases and insect pests: When plant diseases and insect pests occur, provide suggestions to the construction workers after consulting professionals.
3. Project progress
1. Report weekly work content, next week’s plan, weekly project progress and overall project progress to the company’s engineering department in a timely manner every week.
2. Go to the site every day to understand the construction content of the day and the amount of work completed that day.
IV. Communication services
1. Return to the company to assist the project department in signing and sealing the required information.
2. Participated in some regular supervisory meetings, and understood the requirements of Party A and the supervisor for the project, the problems that need to be solved during the construction raised by the project department, and the agreement reached between the two parties to solve the problems. *knowledge.
3. Convey and implement the management documents and requirements of the company’s engineering department to the project department.
4. Help the project department obtain industrial and commercial and tax certification documents from the company’s finance department: assist the administration department and the person in charge of the project department in appraising the labor contract.
5. Use your own camera to take photos of the scene and provide picture materials for the company’s promotional materials.
5. Enterprise risk prevention
1. In terms of labor wages: I often ask migrant workers on site to find out that their wages are paid in time, and there is basically no arrears. I learned from the construction team that they have recently been paid part of their wages, and there is a small amount in arrears, which I still need to follow up on.
2. Material payment: Since the material style project is a key payment, I made a detailed understanding of the main material suppliers and learned that none of them signed supply contracts with project stamps.
The following is the payment situation of the project department to several major material suppliers:
(1) Seedling supplier, the supply of seedlings is more than __ million yuan, and the amount owed is more than __ million yuan Yuan.
(2) The paving supplier supplied bricks for more than __ million yuan and owed more than __ million yuan.
(3) Commercial concrete supplier, settled with no outstanding balance.
(4) The cement supplier has a small amount of debt.
(5) After understanding the remaining material suppliers, record the contact information for timely tracking.
3. Since the project warranty is involved, I made statistics on the death of seedlings.
6. Existing deficiencies, improvements and improvements
I was assigned to work in the project department. During this nearly one year of work and study, I successfully completed the tasks of the company and the engineering center tasks assigned. But at work, I found that my professional skills are not good enough and my business level needs to be improved. To this end, I will work harder, study harder, strive to improve cultural quality and various work skills, and make due contributions to the company. contribute.
Part 2 Sample Annual Work Summary for Individuals in Construction Units
The work in 20__ has ended. At this time of bidding farewell to the old and welcoming the new, I would like to summarize the work of the past year and see progress and success. There are gains and achievements, but there are also shortcomings. The work of the year is summarized as follows:
1. Overall work status
(1) The work in the first half of the year - tense and busy
Since the company has just It was established recently, the staffing was insufficient, and there were multiple projects started at the same time at the end of 20__. In the first half of the year, I was also responsible for the comprehensive building project of Anhui Tuoshan Heavy Industry Machinery Co., Ltd., the factory project of Anhui Ma Shi Casting Equipment Manufacturing Co., Ltd., and the Anhui Ma Shi Casting Equipment Manufacturing Co., Ltd. The on-site management and data collection and organization of the No. 8 workshop project of Minowa Medicinal Chemical Co., Ltd. are tense and busy due to the relatively concentrated start time of the three projects and the main construction is being carried out at the same time. We have to do on-site management during the day and work overtime at night. Organize information. Despite this, there are still cases where several construction sites have things to deal with at the same time and they are complained because they cannot be present at the same time.
(2) Work in the second half of the year - relatively easy
In the second half of the year, Minova, Ma Shi Casting, Tuoshan Heavy Industry and Sucun Kindergarten successively carried out completion acceptance, and the other two The interns can also help me share part of the work, so the work in the second half of the year becomes relatively easy.
2. Fulfillment of job responsibilities
1. Fully responsible for the organization, coordination and command of construction site construction
After the establishment of each project department, I will Assist the project manager to conduct on-site inspections as soon as possible, draw construction site floor plans, reasonably plan the locations of construction roads, material yards, construction machinery and temporary facilities, and cooperate with the company's safety department to guide the setting up of temporary electricity on site. Several projects are basically Meet construction specifications and safety acceptance standards at once.
During the project implementation, after receiving instructions from the company and leadership departments at all levels, I communicated and implemented them in a timely manner, and provided timely feedback on the implementation status. During the work, he coordinated the relationship with the construction unit and supervision unit as well as the project department and the team many times to avoid disagreements and conflicts.
Over the past year, the work of each project department has been carried out smoothly, and construction production has been carried out in a healthy and orderly manner.
2. Technical guidance work
(1) Carefully study the drawings before the start of the project, summarize various problems discovered by the general manager and each team, and solve them one by one in a timely manner during the joint review of the drawings.
(2) Conduct technical briefings to the team leaders in a timely manner before the start of each process, insist on standing aside during the construction of key parts, and solve problems in a timely manner when problems are discovered.
(3) If problems are found in the drawing design or construction difficulties are found during the construction process, actively seek solutions and communicate with on-site supervisors and designers to ensure smooth progress of the construction.
3. Quality control
(1) Strictly control the quality of incoming materials, including checking quality assurance information, checking the appearance of materials, and sending samples for testing in a timely manner to prevent substandard materials from being used in the project used in.
(2) The construction specifications and quality requirements are reported to the team leader in a timely manner, and their implementation is checked, and the frequency and intensity of inspections are increased to avoid rework and quality hazards.
(3) Strictly implement the "three inspections" system. If quality hazards are found in any link, relevant personnel are required to make rectifications immediately. Only after the rectifications are qualified can the next process of construction be carried out.
4. Progress control
(1) Develop an overall progress plan before starting construction, and develop monthly progress plans and progress targeted at specific processes (such as concrete pouring time) during the construction process Plan, check the execution of the schedule, and make reasonable adjustments when necessary.
(2) Coordinate the cooperation between various teams, reasonably arrange cross-construction, and speed up the construction progress as much as possible while ensuring quality and safety.
(3) Always pay attention to the weather conditions in order to adjust the operation plan and reduce the impact of the weather.
5. Cost control
(1) When calculating the amount of materials required, strive to be accurate, communicate with experienced construction personnel, reasonably determine the amount of material loss, and try to Avoid increasing purchase and storage costs due to inaccurate calculations.
(2) Make rational use of reusable materials to avoid unnecessary waste.
(3) Strengthen guidance and management to reduce losses caused by rework.
(4) Reasonably speed up the construction progress and effectively reduce costs.
6. Safety management
(1) Regularly provide safety education to team leaders and workers to improve workers’ safety awareness.
(2) Hang safety slogans and warning signs at the construction site to create a good safety production atmosphere.
(3) Strengthen the frequency and intensity of safety inspections and eliminate safety hazards in a timely manner.
(4) Those who fail to rectify safety hazards and disobey safety production management will be punished and removed from the construction site if necessary.
7. Collection and arrangement of data
(1) Collect various technical data and safety data in a timely manner to ensure that the data is synchronized with the progress.
(2) After the acceptance of each sub-project, the signature and seal procedures must be completed in a timely manner to avoid a backlog of data.
(3) The data collected and organized must be kept properly to avoid loss.
(4) After passing the completion acceptance, the completion filing and data transfer work shall be carried out in a timely manner.
8. Learning and training
In the past year, I have continued to improve myself through learning and training. In March 20__, he passed the training and passed the assessment, and obtained the full-time safety production assessment B certificate. In September 20__, I took the National First-Class Construction Engineer Examination and passed 3 subjects.
3. Shortcomings in the work and the direction of efforts
(1) Not familiar with the implementation of the new specifications
The project quality acceptance has been since May 20__ New specifications have begun to be implemented, such as the retention scheme for mortar test blocks, the promotion and use of high-strength steel bars, and the enhancement of seismic design. The company has purchased a complete set of specifications. In future work, we must strengthen learning to avoid ignorance of the new specifications. Work errors caused by standards.
(2) Feedback on issues is relatively lagging
The work in 20__ was carried out smoothly overall, but there were also some problems. For example, Tuoshan Heavy Industry experienced disputes caused by workers demanding wages. Because they failed to detect and provide feedback to company leaders in advance, they were unable to avoid the disputes. also.
In the comprehensive building project of Sauter Auto Parts Co., Ltd., because of listening to Mr. Wang’s words (Mr. Wang insisted that the company leaders agreed not to make five signs and one drawing at the construction site), the production time of the five signs and one drawing was delayed because of timely communication with the leaders. .
(3) Directions for efforts in 20__
1. Strengthen learning, accumulate experience and improvement methods for improvement, carry out full-process and all-round project management work, and strive to make ourselves Become a high-level, compound mid-to-senior management talent.
2. Strengthen the learning of office software and improve work efficiency.
3. Strengthen the study of theory and its application in combination with practice, and strive to achieve good results in the additional second-level construction engineer and first-level construction engineer physical examinations in 20__.
4. Strengthen communication with colleagues and leaders to carry out work better.
IV. Summary
Looking back on the past year, it was both a stressful and fulfilling year. Looking forward to the new year, in the new year, I will sum up my experience, learn lessons, make greater efforts, devote myself to work with a more energetic and promising mental state and a down-to-earth work style, and make greater contributions to the company. big contribution.
Part 3: Sample Annual Work Summary for a Construction Unit
During this year, I accepted the arrangement of the company’s leadership and served as the supervisor of Long Engineering and two community leaders from January to November. In December, he also served as the civil engineering supervisor of the Forest Garden Project. During the above-mentioned project supervision process, I obeyed the company's arrangements and the leadership of the director's representative. In addition to conducting quality process control according to conventional supervision specifications, I also did a lot of work during the actual operation. I would like to summarize the work I have done this year. As follows:
1. Strengthen your own theoretical study, recharge yourself in time, and reposition yourself from time to time.
I am extremely self-motivated. I never forget to study while working, and arm my mind with theory. I took the time to study after work this year, and participated in the supervision organized by my office in October. I successfully passed the engineer qualification examination with excellent results and obtained the Chongqing Supervision Engineer Certificate, which increased my confidence and determination to continue to do various supervision tasks in the future.
2. Be familiar with the basic situation of the project and make preparations for supervision before the start of construction and during construction.
After the supervision engineer supervises the project, I first carefully familiarize myself with the drawings, find out the key points of quality control, and determine the control objectives. The Longhu University Town project has a total construction area of ??140,000 square meters and is scheduled to be completed this month; the Shangbang International Community project has a total construction area of ??more than 70,000 square meters and started on January 5 this year. The planned construction period is two years, and the main project is currently under construction; Kun. The Thyssen Garden project has a total construction area of ??60,000 square meters. Construction started on January 1 this month. The planned construction period is 20 months. Basic engineering is currently underway.
3. Coordinate the relationship between all parties involved in the construction to ensure that the construction quality is controlled and the project is advanced in an orderly manner.
1. Keep a close eye on key personnel such as the construction party’s technical director and quality management personnel. Supervisors participate in their management, strictly control the quality of the project, control each process in advance, reduce and reduce quality accidents, and try to achieve as little or no rework as possible.
2. Be aware of the important parts of each process, which should be strictly controlled, and supervision must be in place for inspection and acceptance.
3. Be diligent, speak diligently, speak less jargon, respect the technical staff of the construction party, and establish a supervisory image.
4. Deal with conflicts and problems that arise during project construction in a timely manner. This year, we coordinated and resolved more than 20 disputes to maintain the stability of the construction site, ensure the smooth progress of the project, and ensure the normalization of the relationship between managers and workers.
4. Ensure construction progress and investment control, and help the construction party reasonably advance the process in accordance with regulations.
1. Participate in the construction progress plan prepared by the construction party, be realistic about the construction period of each process, be aware of the labor and equipment investment of the construction team, try to meet the construction requirements, and supervise the construction party progress completion status.
2. Be aware of the completion status of each single project, and report to the owner in a timely manner with the director for confirmation every time a project is completed. In order to review the project volume at the end of the month.
3. Based on the actual situation on site, make reasonable suggestions to the owner to reduce investment.
In short, in my supervision of construction projects this year, the quality, progress, and investment of completed and ongoing construction projects have met the requirements of the owners and the supervision department. In my future work, I will work harder to learn supervision regulations and professional technical standards, try my best to do my job well, and continue to contribute to the development of the city's construction industry!
- Previous article:How to plant Polygonatum sibiricum
- Next article:Practice room slogan
- Related articles
- 1898 What slogan did the establishment of the General Administration of Agriculture, Industry and Commerce embody in the Westernization Movement?
- Exhibitions in the Nanzheng Memorial Hall of the Sichuan-Shaanxi Revolutionary Base
- Are Tokyo and Kyoto the same place?
- Best friend birthday wishes domineering
- Who can help me think of a slogan about the spirit of Beijing?
- How about Ningxia Zhongwei
- Slogan about climbing the peak
- How to make handmade stall signs
- At the concert, some people will hold up iPads to support them. How are they set up?
- What equipment, rules and regulations should be in the Young Pioneers team room?