Joke Collection Website - News headlines - How to achieve environmental protection construction?

How to achieve environmental protection construction?

Environmental protection construction adopts the following schemes to arrange the construction site: 1. Dust control (1) The general plane scope and the surrounding sites of the construction site shall be cleaned by special personnel after sprinkling water for 2-3 times a day, and the flowers and plants in the green areas in the site shall be regularly rinsed by sprinkling water to keep them clean. (2) The sand and stone materials shall be stacked with walls, and the surface shall be covered with awnings, so as to prevent the wind and dust from permeating and affect the environmental sanitation. (3) Designated personnel shall be set on site to clean the mud and dirt stained by vehicles, and grass mats shall be laid on the roads at the entrances and exits. At the same time, a car wash pool and a high-pressure car wash pump shall be set up to ensure the cleanliness of the city and the surrounding environment. (4) In the earthwork stage, in order to prevent dust, a high-pressure pump and an earth-moving truck are set on site. When the dirt is turned over and discharged, the dust is immediately sprayed with a water gun. Earthwork above the ground is covered with a safety net. 2. Noise control (1) Low-noise machinery is used in the field. Generally, construction is not carried out after 1 pm and during lunch break. (2) Materials shall be loaded and unloaded manually, especially steel pipes and templates, and it is forbidden to throw them or dump them once by car. (3) Educate operators to reduce man-made noise pollution. It is forbidden for cars to whistle in high tones. 3, sewage control (1) construction water, organized discharge after precipitation treatment. (2) Living expenses water will be treated by septic tank and discharged to the owner's sewage treatment station. (3) Vigorously publicize and educate to save water, reduce pollution, and do not dump or arrange in disorder. 4. Safe and civilized construction layout (1) On the left side of the entrance of the site gate, there is a company profile and a publicity column with five pictures and one brand. (2) Write the name of the project and the construction unit on the side of the entrance of the office exterior wall. (3) The entrance of the gate is provided with a security room and a sentry box. There is a dedicated driving construction road in the field. There are smoking rooms, tea kiosks, building garbage dumps, green belts, etc. (4) Signs in production area, living area and office area are obviously complete, and safety signs, mechanical operation procedures, operators and rules and regulations beside machinery, mixing station, steel bar processing room and construction site are complete. 5. A 5.5m-wide steel gate is set at the entrance, and enterprise signs and construction slogans are set on both sides of the gate. A light box is set on the gate, on which the name of the enterprise and the name of the project are written, and a business philosophy card is set on the left side of the outer wall on both sides of the intersection, and a head-up effect diagram of the proposed building is set on the right side. 6. The guard duty room shall be set at the entrance of the gate, and the guard system card shall be hung, and the personnel on duty shall be responsible for registering the entry and exit of personnel and materials. 7. The main road at the junction of the road in the site and the construction area is poured with C2 concrete with a thickness of 15cm;; Non-main construction sites shall be compacted with stone sand, and the surface layer shall be leveled and calendered with 1: 2 cement mortar. Green belts shall be set on both sides of the entrance, at the entrance of the office and on the open space around the dormitory, with a green area of 1,2m2. Automatic sprinkler heads and artificial auxiliary water spraying shall be used for dust prevention in the open space and the proposed building. 8. The dormitory is separated from the construction site, and it is built in a trailer with a height of 2.5m, and the ground is plastered with cement mortar. Double-decker iron frame beds are uniformly set in the dormitory, daily necessities are placed neatly, and a dormitory management system is established, equipped with special health cleaners to ensure the cleanliness of the dormitory. 9. The toilet and bathroom are made of color steel plate structure, the roof is made of color steel folding plate, the ground is paved with non-slip floor tiles, the toilet squat position is made of granite partition and high water level energy-saving water tank, and the bathroom is illuminated by waterproof lamp holders to ensure the safety of workers. 1. The kitchen floor shall be paved with non-slip floor tiles, and the walls, stoves, washing pools and vegetable stalls shall be tiled. The ceiling shall be made of plastic ceiling, and the sanitary system shall be put on the wall. Dust-proof, fly-proof, smoke exhaust, exhaust and disinfection facilities are complete, and liquefied petroleum gas is used for fire to avoid environmental pollution. And have a "health permit", cooking personnel with health certificates, set up tea supply at the kitchen, canteen unified configuration table. 11, 9, toilet, bathroom and canteen sewage through the site level 3 septic tank, the outlet is connected to the municipal sewage pipe. 12, in the dormitory area set up staff study recreation room and smoking place, to ensure that the construction personnel's leisure time activities are rich. 13, according to the construction site plan layout material stacking place, warehouse, machinery and equipment; Materials and warehouses shall be provided with signs, indicating the name, variety and specifications, and mechanical equipment shall be provided with operating instruction cards. Among them, a dense mesh safety net is hung around the mortar and concrete mixer to reduce dust. 14, establish a health management system, set up full-time cleaning personnel, so that the living quarters, office areas and construction areas are clean and tidy without water, domestic garbage is put into sanitary containers, construction garbage is cleaned up in time and removed on the same day, and workers' dormitories, offices, toilets and canteens are regularly disinfected, mosquitoes, flies and rodents are killed. 15. Arrange fire extinguishers according to the actual situation. The main parts are no smoking signs and publicity and education materials. Establish a fire prevention system, a fire prevention leading group and a voluntary fire brigade, complete the examination and approval procedures for open flame operation, and have a special person to check the on-site open flame operation. 16, site construction personnel in accordance with the provisions, unified wear safety protective equipment and card mount guard.