Joke Collection Website - News headlines - How to accept a new house? What are the acceptance criteria?
How to accept a new house? What are the acceptance criteria?
1, I don't know when the wall inspection (water seepage, cracks) will start, and the main problems of the wall inspection. Check the walls, preferably on the second day of rain. If there is something wrong with the wall, a heavy rain can be detected. How to check and accept the new house, the inspection of the wall is the most important. How to accept the new house, the owner should also check the height of the house. Generally speaking, it is acceptable to be within 2.65 meters. If the house is less than 2.60 meters, you must consider whether to buy the house. Reducing the height is a very effective way to reduce the cost of developers.
2. Check whether the quality of doors and windows is good, the surface must be bright and clean, and there are no major scratches on a large area. The materials of window frames, beams and window panes shall not be deformed. The sealing strips around the door and window strips and door frames are intact and firm. After the doors and windows are closed naturally, the frame and fan can be closed naturally, and the space size should be uniform. After all, the inspection of doors and windows is very important for the acceptance of new houses. The hollow inner layer doors and windows of hollow glass are seamless, seamless, free of dust and water vapor. The seal between rubber sealing strip and glass and the glass incision are smooth, without grooves or cracks. The sealant is firmly bonded, and the surface must be smooth and straight without cracks.
3, first check the wall box, switch socket panel, check whether they are installed correctly, and whether the surrounding walls are aligned with the walls. Panels with the same height must be at the same height and level. Panel surface should be smooth and tidy, without cracks, clean and without deformation, and the cover plate should be tight. Power outlets in the surface of buildings, kitchens and bathrooms must be waterproof and safe.
It's best to look at the installation of water supply and drainage pipes. Whether the surface of the pipeline is clean and tidy, check whether the pipeline is installed orderly, check whether there is water on the white drain pipe hanging from the ceiling, and check whether the length of the drain hose interface is enough for floor sanitary equipment. See whether the floor drain is at the bottom of the kitchen floor, whether the floor drain cover plate is complete, whether there are sundries and damage in the water seal part.
The above are the four standards for the acceptance of new houses, which the owners can refer to when accepting new houses. After all, buying a house is a big problem for young people in this era. If you finally buy a suite, spend more time on the acceptance to prevent the conflict between the house and the developer. The owner needs to pay more attention to how to check and accept the new house.
Tubatu Online provides you with "each decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8 to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~
- Related articles
- Will Duff's one-code photo be seen?
- Civilization is only one step away from a 450-word comic composition. Start with a topic, start with an echo.
- What kind of potted fruit is good? At present, strawberries and cherry tomatoes have been planted, and they have all been harvested. Grapes and pitaya have also won, but they have not yet borne fruit.
- What is the reputation of the military god fat?
- Is China Railway Water Yinchuan handled well?
- Compilation of model essays on the planning scheme of community Spring Festival activities (7 articles)
- What are the poems about spring tea?
- How can we manage a factory well?
- What kinds of advertising words are there?
- Primary school students are diligent and wasteful.