Joke Collection Website - News headlines - Enterprise security risk announcement
Enterprise security risk announcement
Article 1:
By the end of March of 15, the district safety supervision bureau had found illegal acts or hidden dangers of accidents in 16 production and business units 155, and the inspectors conducted on-site persuasion and publicity on the safety accidents that might be caused by these hidden dangers. When the rectification instruction is issued within a time limit, is it delivered to the person in charge of the enterprise in writing? Friendly tips for safe development? And then what? Sunshine safety supervision tracking card? , accept the supervision of the client. In order to give full play to the role of social forces in the supervision and rectification of security risks, according to the provisions of the Regulations of People's Republic of China (PRC) Municipality on Information Disclosure, the illegal acts or hidden dangers of accidents found in the inspection will be notified.
1. Jiangsu Boli Biological Products Co., Ltd. has potential safety hazards, such as the bottom cover of the gas mask is not sealed and there is no regular weighing record. (development zone)
2. Jiangsu Jiangfen Electric Analysis Instrument Co., Ltd. has 9 potential safety hazards, such as blocked fire-fighting equipment passage, overdue fire-fighting equipment and failure of fire extinguishers. (development zone)
3. Taizhou Zhongyu Fire Equipment Co., Ltd. has security risks such as 12 safety passage blockage in weaving workshop. (development zone)
4. Taizhou Daikin Sealing Material Factory has hidden safety hazards, such as failure to put on record the emergency rescue plan for production safety accidents 12. (Dalun Town)
5. There are four potential safety hazards in Dafeng Well Area of Subei Oil Production Plant of Zhejiang Oilfield Company of China Petroleum Co., Ltd., such as incomplete on-site safety warning signs. (Mibai Town)
6. Jiangsu Shuguang Huayang Drilling Tool Co., Ltd. has 1 1 potential safety hazards. If the paint is not cleaned in time after equipment maintenance, it is left at will. (Mibai Town)
7. Jiangsu Sunrise Chemical Co., Ltd. has seven potential safety hazards, such as the damage of human electrostatic discharge piles at the entrance of hazardous chemicals warehouse (Mibai Town).
8. Jiangsu Tianhao New Building Materials Co., Ltd. has eight potential safety hazards, such as standardization and discontinuous operation of safety production. (Yuxi Town)
9. Taizhou Jinbaolai Textile Co., Ltd. has potential safety hazards, such as damaged equipment box doors 10. (Louzhuang Town)
10. Jiangsu huachen medical device co., ltd. has six potential safety hazards, such as debris accumulation in throat-shrinking workshop. (Louzhuang Town)
1 1. Jiangsu Liside New Materials Co., Ltd. has five safety hazards, such as the safety management system for special operations has not been revised (Shen Gaozhen)
12. Taizhou Shuguang Oil&Fat Co., Ltd. has 2 1 security risks, such as failing to educate and train employees on the job. (Yuduo Town)
13. Taizhou best molybdenum products co., ltd. 10 security risks (yuduo town) and other non-hidden danger investigation and treatment accounts.
14. Taizhou Yuhuan acetylene gas manufacturing co., ltd. has four safety hazards (Yuduo town), such as the safety management system for special operations has not been revised.
15. Taizhou Wanxin Tungsten and Molybdenum Products Co., Ltd. has potential safety hazards, such as 14 (Yuduo Town) has not formulated a special operation safety management system.
16. Jiangsu Changjiang Tian Yue New Materials Co., Ltd. has 1 1 potential safety hazard (Yuduo Town) and other special operation tickets that have not been revised and updated.
Please ask the relevant units to complete the rectification of hidden dangers on time in strict accordance with the requirements of the rectification instructions; Relevant towns (streets) are requested to strengthen supervision and urge rectification. In order to ensure the safety of people's lives and property and prevent production accidents, our bureau will impose administrative penalties on units that have not been rectified within the time limit until they are ordered to stop production and suspend business for rectification.
Article 2:
City Housing and Construction Bureau, High-tech Zone Construction Management Office, Gezhouba Base Management Bureau, and all relevant units:
In order to implement the main responsibility of production safety, effectively prevent and contain serious accidents, and ensure the stability of production safety situation, according to the Notice of the Provincial Housing and Construction Department on Further Strengthening the Management of Production Safety of Construction Projects and Strengthening the Investigation of the Main Responsibility (E-J [2015] No.7) and the Notice on Seriously Carrying out the Special Action for the Construction Scheme of Dangerous Sub-projects (E-J Office [2015]) The Notice on Improving the Civilized Construction Standards of Housing Construction and Municipal Infrastructure and Strengthening the Prevention and Control of Dust in Construction Sites (Yishijiujian [2015] No.84) and other documents require that the Municipal Commission of Housing and Urban-Rural Development organize the safety inspection of construction projects in the whole city in the second half of 2065 438+05. The inspection situation is hereby notified as follows:
I. Basic information
Used in this inspection? Four no two straight? * * * Check 153, with a total construction area of 7.87 million square meters, and issue 43 safety hazard rectification notices 10, and safety hazard shutdown rectification notices10. Review the projects with major security risks to ensure the safety of project construction.
Two. Progress in safety work
(a) the safety supervision work of the competent construction department is in place. The housing and construction departments of counties and urban areas can conscientiously implement the regulations of governments at all levels on the safety management of construction projects, strengthen the special rectification of safety in the construction field and the investigation and management of hidden dangers, and achieve full coverage of safety supervision. The safety of construction projects in the jurisdiction is generally stable, and civilized construction, especially dust prevention measures, are in place.
(2) All parties to the project should improve the security system and implement the main responsibility. Most construction, construction and supervision enterprises can implement the main responsibility, improve the safety management system, actively carry out self-examination and self-correction, and steadily improve the level of safe and civilized construction in accordance with the requirements of national, provincial and municipal laws, regulations, norms and standards on safety production. For example, the construction of Yichang Kunfa Construction Co., Ltd., the 3# building, C 1-C5# building and basement project of Chen Dong Xinyu B District supervised by Chongqing Engineering Management Co., Ltd., the municipal engineering of Yichang Xiling No.2 Expressway supervised by China Construction Third Engineering Group Co., Ltd., and the construction of Hongyuan Highway Engineering Consulting and Supervision Co., Ltd., all parties involved in the project have established and improved the safety guarantee system, implemented the main responsibility and strengthened the on-site safety and civilized construction, which has played a very good role.
(3) All parties involved in the project construction should improve civilized construction standards and implement green construction. The green and civilized construction focusing on the prevention and control of construction dust has achieved fruitful results and has been strictly implemented in the construction site? High standard enclosure, no silt at the exit, no dust at the construction site, full coverage of bare soil and complete dust suppression facilities? Overall requirements, to lay a solid foundation for promoting urban green development. For example, the No.3 building, C1-5 building and basement project in Chen Dong Xinyu B area constructed by Yichang Kunfa Construction Co., Ltd. have many innovations in dust prevention and control, such as installing a spray system on the crane boom, using omni-directional spray to suppress dust in the construction site, and using special cutting equipment with dust removal device for masonry cutting. The relocation project of Yichang Municipal Party School (Yichang Administration College), which was constructed by Hubei Guangsheng Construction Group Co., Ltd. and supervised by Wuhan Weishi Engineering Supervision Co., Ltd., has a good demonstration role in civilized construction and green construction.
Third, the main problems
(1) There are still loopholes in industry supervision. Individual counties and cities have not taken effective control measures for projects that have not gone through the construction permit procedures. For example, the outpatient building project of Yichang Fifth Hospital in Xiaoting area.
(2) The project safety management of some construction enterprises is out of line. Some construction units entrust projects through contracts without seriously organizing safety inspections. Safety management data can't reflect the on-site situation, and the on-site situation can't reflect the actual management level of the enterprise, so there are major security risks. For example, Hu Axiang Modern Business Logistics Center Phase III (1)26 # and 27# projects undertaken by Wuhan Eighth Construction Engineering Group Co., Ltd., and the 8# building project of Dangyang City Central Block A undertaken by Hubei Guangjian Construction Co., Ltd.
(3) Safety management measures for dangerous projects are not in place. First, some enterprises do not pay enough attention to dangerous sub-projects exceeding a certain scale. The requirements of the Notice on Further Strengthening the Safety Management of Dangerous Sub-projects issued by the Provincial Department of Housing and Urban-Rural Development (E.H.D. [2065438+04] No.43) were not seriously implemented, and targeted safety hazard inspection and rectification measures were not formulated according to the actual situation of dangerous sub-projects, so there were major safety hazards at the site. For example, the high slope project of the deep foundation pit of Building 9, Phase II of Yichang Hu Axiang Modern Business Logistics Center, which was constructed by the First Construction Engineering Co., Ltd. of China Construction Fourth Bureau and supervised by Yichang Pinghu Engineering Construction Supervision Co., Ltd., was ordered to stop work and rectify due to major safety hazards on site. Second, some enterprises are lax in the construction management of dangerous sub-projects, and some engineering contractors pay insufficient attention to dangerous sub-projects such as tall scaffolding, formwork support and construction electricity. , and the special plan is incomplete or not strictly implemented, and the acceptance data is not true, resulting in major security risks on the site. For example, the special planning of Yidu Public Security Bureau's new business and technical housing project, which was undertaken by Hubei Yuan 'an Hailong Construction Co., Ltd. and supervised by Hubei Dajing Construction Project Management Co., Ltd., was incomplete.
(d) Some enterprises do not pay enough attention to civilized construction, and dust prevention measures cannot meet the relevant regulations of Yi Shi Housing Construction Committee. The enclosure of some projects is deformed or damaged, the responsibility system for dust prevention and control has not been implemented in the construction site, effective overall dust reduction measures have not been taken, or the equipment has not been used as required to achieve dust prevention effect. For example, the civilized construction measures of BRT dispatching center and parking lot phase I project undertaken by Hong Xin Construction Group Co., Ltd., Jiangshan Duojiao phase V project undertaken by Huashen Construction Group Co., Ltd. 1#, 3# building and basement project are not in place.
(E) Some supervisors have a weak sense of safety. Did not fully fulfill the safety production supervision responsibilities stipulated in the Regulations on the Administration of Safety Production in Construction Projects and the Opinions of the Ministry of Construction on Implementing the Safety Production Supervision Responsibility in Construction Projects (Jianshi [2006] No.248). The supervision unit failed to fulfill its responsibilities and urged the construction unit to investigate hidden dangers and implement rectification. For example, Hubei Dajing Construction Project Management Co., Ltd. supervised the new project of business and technical housing of Yidu Public Security Bureau, and the supervision responsibility was not in place.
(6) Some project safety officers are unable to take up their posts. For example, Liu Hao, the safety officer of Hu Axiang Modern Business Center Phase II 1-5# project undertaken by China Construction Fourth Bureau and Third Company, Li Tao, the safety officer of Hongyang Lafite Town project undertaken by Wuhan Qijian Group Co., Ltd., Jeff, the safety officer of Zhongxing Square project undertaken by Huatai Construction Group Co., Ltd., Yan Jianbin, the safety officer of Jiangshan Duojiao Phase V project undertaken by Huashen Construction Group Co., Ltd., and Li Hua, the project safety officer of Wujiagang Branch and the station police station constructed by Yichang Huading Construction Engineering Co., Ltd.
Four. Handle opinions
(1) Notification of praise
1, giving a circular of praise to Yichang Kunfa Construction Co., Ltd. and its project leader Wang, Hubei Guangsheng Construction Group Co., Ltd. and its project leader Tu Chuanfeng, China Construction Third Engineering Group Co., Ltd. and its project leader who have achieved fruitful safety management and dust prevention.
2. Wuhan Weishi Engineering Supervision Co., Ltd. and its project director Luo Shimian, Chongqing Engineering Management Co., Ltd. and its project director Liang, who put the safety supervision responsibility in place, will be informed of praise.
(2) informed criticism
1, poor safety management on the construction site, Huashen Construction Group Co., Ltd. and its project leader Zhu, Hubei Guangjian Construction Co., Ltd. and its project leader, Yidu Xingyi Construction Engineering Co., Ltd. and its project leader Du Shuhua, Wuhan No.8 Construction Engineering Group Co., Ltd. and its project leader Du Shuhua, China Construction Fourth Engineering Co., Ltd. and its project leader, Third Construction Engineering Co., Ltd., China Construction Fourth Engineering Co., Ltd. and its project leader Yang Guo, Hubei Yuan 'an Hailong Construction Co., Ltd. and its project leader Chen Jingfu, Hubei Hong Xin Construction Group Co., Ltd.
2. Give informed criticism to Yichang Pinghu Engineering Construction Supervision Co., Ltd. and its directors Cheng Xiaoli and Chen Junping, Yichang three engineering construction supervision companies and their directors Wang Changquan, Hubei Hualei Engineering Construction Supervision Co., Ltd. and its director Xie Ruigang, Hubei Dajing Construction Project Management Co., Ltd. and its project director Zhu, and record them in the integrity file.
3. Give informed criticism the safety management personnel Liu Hao, Li Tao, Jeff, Yan Jianbin and Li Hua who failed to perform their duties as required, and record them in the integrity file.
Verb (abbreviation for verb) Next work plan
In 20 16, the municipal housing construction Committee will do the following main work in combination with the relevant requirements of the two-year action plan for project quality management of the Ministry of Housing and Urban-Rural Development:
1. Implement responsibilities and strengthen supervision. Implement the main responsibility of the contractor, strengthen the supervision of the enterprise on the project, strengthen the concept that the general contractor is fully responsible for construction safety, and implement the quality and safety management responsibility of the project leader.
2, the full implementation of safety production standardization. Fully implement the newly revised "Yichang City Construction Project Safety Production Management Standardization Implementation Manual", and carry out the evaluation of construction project safety production standardization in our city in accordance with the requirements of the Provincial Housing and Construction Department's "Implementation Opinions on Further Developing Construction Safety Production Standardization" to strengthen the construction safety standardization.
3. Strengthen the supervision of dangerous projects. Strictly strengthen the safety management of dangerous sub-projects and learn from them? Shenzhen 12.20 landslide accident? Lessons, strengthen safety inspection before and after the Spring Festival, strengthen the supervision of dangerous projects, and effectively curb major and above production safety accidents; Comprehensively carry out the investigation and management of hidden dangers in production safety, and unremittingly promote the sustained, stable and improved situation of construction safety production in our city.
4. Strengthen the prevention and control of dust and promote the green development of the city. This year, under the premise of clear responsibilities, the Housing Construction Committee established an accountability mechanism, incorporated dust control work into the target assessment task, and promoted the green construction and urban green development of our city.
Attachment: 20 15 Summary of Safety Inspection Items in the Second Half of the Year
- Previous article:What does traffic guidance mean?
- Next article:When will Zhujiajiao West Lake New Village be relocated?
- Related articles
- The previous sentence of going in the opposite direction
- Campus advocates green and low-carbon promotion banners to protect the environment. Recommended
- Is the top one-stop enterprise service reliable?
- Thanksgiving slogans
- Driving slogans on the wandering earth
- Learn from Lei Feng to be a moral person, 500 words, it cannot be found on Baidu, it is best to write it yourself
- Mobile party newspaper 1237 1
- Look at the night scene and send beautiful sentences to friends.
- The greetings from senior high school students are very brief.
- Do you know what is particularly excellent? Changjin Lake.