Joke Collection Website - News headlines - Team building activity planning plan

Team building activity planning plan

In order to ensure that the event proceeds smoothly and successfully, it is often necessary to formulate an activity plan in advance according to the specific situation. The activity plan is actually a written plan based on factors related to the activity. What are the format and requirements for the activity plan? The following is the 2021 team building activity planning plan that I collected and compiled (selected 7 articles). It is for reference only. Let’s take a look. Team building activity planning plan 1

1. Purpose of the activity

In order to make employees more familiar with the company’s existing business and resources; understand the daily work of other departments of the company; strengthen the relationship between departments , communication, exchange and cooperation between colleagues; strengthen the company's cohesion; improve work efficiency and employee enthusiasm; at the same time, arrange the company's work tasks for the second half of the year, work hand in hand, and work hard to achieve the ultimate goal.

2. Activity theme

"Open your mind and be free and unrestrained"

3. Activity time

In the afternoon of x, month x, 20xx x point.

IV. Event location

Nearby hotel conference room

V. Activity participation theme

All xx employees

6. Hosting the event

xxx will be the main one, with leaders from various departments taking turns

7. Format of the event

Training + interactive games

8. Activity plan (*** divided into two parts, *** about 4 hours)

Prelude: (time about 30 minutes)

The boss announced the details of this activity Meaning, introduce the company's situation, introduce the situation of each department and the person in charge, and announce the work goals and work plan for the second half of the year. The following time is given to the heads of each department.

The heads of each department take turns to take the stage to introduce members of their department, in this way, for example: "This is the energetic beauty xxx from the customer department", and then xxx takes the stage to greet everyone, using the most humorous and representative words Self-introduction in language, including work responsibilities, hobbies, etc., is intended to impress everyone on you. After all the department members are introduced, the person in charge will describe the department's work responsibilities and daily work situation, and combine it with the members. At the same time, find the words or sentences that best represent the department's work situation or future expectations as the code name of the department. (This codename can be used as a slogan in the interactive game).

Part One: Training (the time for each department is controlled at 15 minutes, the Q&A stage is controlled at 2 minutes, and there is a 10-minute break in the middle, totaling 2 hours and 30 minutes)

Materials required:

Projector, projection screen, camera, camera, sound system, suitable background music.

Trainer:

Heads or representatives of each department, employees of the department can be used as effective supplements

Process:

Each department The person in charge provides training for the company's employees based on the department's work content, work scope and main products.

Part 2: Interactive Games

Purpose: To strengthen teamwork, promote collaboration between departments, and enhance understanding among colleagues. Team building activity planning plan 2

1. Guiding ideology and purpose

To enhance the team awareness, collaboration awareness, and overall awareness of the company's employees, improve employees' physical fitness, enhance physical fitness, and create a healthy and upward The purpose is to further strengthen the company's cohesion and comprehensively promote the company's corporate culture construction and spiritual civilization construction. Enrich employees' spare time life, promote communication among employees, let employees relax, and enhance collective cohesion and team spirit.

2. Competition content, time and place

(1) Content:

Mountain climbing competition: The competition is divided into 3 groups, one for men and one for men. For groups and groups, in each male and female group, the first person to reach the finish line will be the first and second place in each group. In the group group, the person who reaches the top of the mountain will be the first place.

(2) Event time and location:

1. Time: xx, xx, 20xx

2. Location: Qianshan, Xianning, Hubei

3. Participants

All company personnel

Participants must gather at the entrance of Qianshan Park before the day of the month to start climbing

4. Organization Leadership

This event is led by principal xx. Establish a competition evaluation and management guarantee team.

(1) Competition Selection and Management Guarantee Group

Team leader: xx

Members: xx

Main tasks:

1. Responsible for the administrative management and security of participants;

2. Responsible for logistical supply support and vehicle coordination;

3. Evaluate the competition situation

(2) Grouping of teams participating in the event:

Organize groups according to the arrangements of the applicants. The specific grouping is as follows:

Group according to the actual number of people present, with no more than 6 members in each group, even number.

5. Award setting

There are three awards for the event, namely first place, second place, and solidarity award (according to the ranking of the event, etc.).

6. Activity process

1. The company leaders gave a speech on this event, mobilized before the game, and announced the official start of the competition;

2. The judging panel based on At the arrival time of each group, the top 2 of each group and the top 1 of the group will be selected

3. The host will announce the rankings, and the company leaders will present awards to the winning contestants

4. The company leaders will make Concluding remarks and the event ended.

7. Preparation work:

1. Coordinate various departments and arrange personnel on duty;

2. Purchase prizes: first prize, total value RMB; The second prize is worth RMB yuan in total; the group prize is for 1 to 3 people, each worth RMB yuan. Estimated expenditure $.

3. Mineral water: xx yuan; Red Bull: xx yuan; Sugar: xx yuan; xx snacks. Team building activity planning plan 3

1. Purpose of the activity

The development of the real estate project has reached a critical stage. In order to further enhance employee emotions and deepen employee understanding, this dinner party is specially held. It aims to promote employee communication, improve employees' team awareness, thereby promoting the overall construction and development of the team, and providing human resources and intellectual support for brand building and smooth development of project projects.

2. Activity location and time

1. Activity location: xx Hotel

2. Activity time: 7:00 pm on x, month x, 20xx

3. Activities

Team dinner, interspersed with games and performances (improvisational performances).

IV. Activity Process

1. Welcome Ceremony

Question: How to welcome the chairman of the board?

Pre-invitation of guests (leaders of various ministries, offices, and companies), and leadership seating arrangements.

2. Host’s opening statement

Question: Selection of host.

Host the preparation of the manuscript. (Content: Reflect the theme and significance of the event; welcome all guests and give a brief introduction; special thanks to the chairman for participating; indicate that this is a family banquet, so that everyone can eat and have fun.)

Real Estate Department Do the responsible persons and employees need to be introduced in turn?

3. Please give a speech to Mr. Zhang.

Question: Writing and revising the speech.

4. Invite the chairman to deliver a speech. (***Same toast)

5. Announce the start of the dinner.

Team building activity planning plan 4

In order to reflect the company's corporate spirit, enhance employees' sense of unity and cooperation, and promote communication among employees, it is planned to organize employees to hold outing activities in May, as follows:

< p> 1. Significance of the activity:

Improve everyone’s enthusiasm, promote communication among employees, let employees relax, and enhance collective cohesion and team spirit.

2. Event time:

Departure at 7 am on Saturday, May 26, 20xx

3. Event slogan:

Relax Mood, unity and cooperation!

4. Activity location:

Mountain climbing

5. Participants:

Editorial board members, editorial board members, all correspondents , company administrative staff

6. Activity expenses:

Estimated 4,000-5,000 yuan

1. Staff meal plan: 30 people × 50 yuan = 1,500 yuan< /p>

2. Vehicle cost: Estimated 600 yuan (those who provide event vehicles will receive a subsidy of 100 per vehicle)

3. Mineral water: 60 yuan

4. Emergency medicines: 30 yuan

5. Temporary reserve: 500 yuan

6. Prize fee: 1,500 yuan

7. Activity content:

In order Let everyone get to know each other as quickly as possible. Some team games will be played during the event, and group photos will be taken after the event.

8. Precautions:

1. All personnel should pay attention to safety and are not allowed to act alone. Smoking is not allowed, it is a fire prevention period now,

2. The climbing time is 2 hours, and you will return to the villa for other activities after 2 hours.

3. Put all garbage buckets into food bags and do not allow random littering.

4. Behave generously and appropriately, pay attention to maintaining the company's image, and refrain from making loud noises, littering, damaging public property, and damaging the environment in scenic spots.

5. If any emergencies occur during the period, they must be reported to the person in charge in a timely manner, and the person in charge will handle the contingency in a timely manner.

6. During the game, please confirm the number of people in each group and pay attention to safety.

7. You must strictly abide by the time regulations, arrive at the meeting point on time, and count the number of people in a timely manner. Everything is subject to the arrangements of the person in charge.

8. Please take good care of your luggage. Especially cell phones, wallets and other valuables. And you should always remind yourself not to forget items. Team building activity planning plan 5

1. Purpose of the activity

To gather popularity and stimulate consumption through Mid-Autumn Festival promotional activities and advertising, with the purpose of increasing sales revenue and profits. On the other hand, it leaves a good impression among consumers, strengthens the confidence of consumers and corporate employees in xx restaurant, enhances brand awareness and reputation, and affects consumer brand loyalty.

2. Activity theme

"On the Mid-Autumn Festival night when the moon is full, the world is at the end of the world at this time", xx Restaurant will help you connect with your family.

3. Event time

The specific time is to be determined.

IV. Activity content

1. On-site riddle guessing activity

(1) Set up a lantern riddle area and hang colorful lanterns with riddles at the event site ( red light) cage. All lantern riddles are regardless of difficulty. Anyone who guesses correctly will receive x yuan of consumer coupons.

(2) During the event, x lantern riddles can be displayed every day, and x lantern riddles can be displayed during the Mid-Autumn Festival.

(3) Lantern riddle cards are small wood-carved cards, about the same size as amulets, with simple appearance and high collection value. One side is the xx restaurant logo, and the other side is the lantern riddle. If the guest guesses correctly, they can take it off and send it to the prize collection area. The lantern riddle plate is wrapped in a red sachet and given to the guest. (The outside of the sachet is also printed with the xx logo)

2. Giant mooncakes

(1) Make a mooncake with a diameter of x meters and place it in the hall for publicity. In August On the 15th, a big gift will be given to each guest on site.

(2) Prepare cameras and printers. If guests want to take photos with giant mooncakes or themed areas, we can provide services. Guests who spend more than x yuan can take photos for free, other guests will be charged x yuan each time.

(3) Contact the giant mooncake maker in advance. If the restaurant cannot make it, you can contact other places to use it as a promotional selling point.

(4) The giant mooncake should have an auspicious name. The specific name can be collected from the society and hyped by newspapers. Those who confirm the adoption can get a table for the August 15th reunion banquet provided by xx restaurant, worth x yuan.

(5) After xpm on August 15th, guests who spend money in the restaurant can participate in the giant mooncake tasting event. The restaurant executives, employees and guests held a cake-cutting ceremony together and delivered it to the customers. The cake-cutting guests can also wait for the honor of personally delivering the cakes they cut to their family and friends to express their deep affection.

3. Send peace

(1) Set up a Mid-Autumn themed area in the dining hall, decorated with themes such as the moon, rabbit, Chang'e, Wu Gang, osmanthus, etc., and make materials For foam and other items, they are fenced with a courtesy fence and cannot be approached.

(2) Hang peace symbols on the laurel trees used for decoration in the hall, symbolizing peace, reunion and preciousness. The peace symbols are made of red silk and small wooden plaques, each of which is novel and unique. Guests who spend money in the restaurant can choose a peace charm they like and give it to their family and friends to wish them peace and happiness.

(3) One peace charm will be given to each table. If necessary, each can be sold for x yuan.

4. Family Portrait Reunion Banquet

(1) The head chef will launch the August 15th Family Portrait Reunion Banquet set menu, ranging from x yuan to x yuan (can be based on the actual situation of the restaurant depends).

(2) All guests who book a reunion banquet package of less than x yuan during the event will receive a free fruit plate, take photos with the scenery in the restaurant for free, and guess lantern riddles for free.

(3) During the event, guests who book a reunion banquet package of more than x yuan in catering will receive a free luxury fruit plate, a x moon cake gift box, free photos with the scenery in the restaurant, and free lantern riddle guessing.

(4) During the event, guests who book a reunion banquet package of more than RMB You can write a blessing Kongming Lantern with your own hand.

5. Couple’s Banquet

(1) The head chef will launch the August 15th Couple’s Banquet set menu, ranging from x yuan to x yuan (can be determined according to the actual situation of the restaurant ).

(2) Guests who book a couple's banquet package will receive a free fruit plate, take photos with the scenery for free in the restaurant, and guess lantern riddles for free. Team building activity planning plan 6

1. Activity theme:

"Gathering the heart and understanding, happy outdoor travel"

2. Activity purpose:

In order to enrich employees’ cultural and entertainment life, enhance communication among employees, relieve work pressure, achieve a balance between work and rest, and enhance team cohesion, the company’s labor union and comprehensive management department organized and planned this outdoor activity plan.

3. Activity subject:

All employees

4. Activity location:

A certain scenic spot

5 , Event itinerary:

Without affecting normal business, this event will be carried out in two batches.

1. Collection time: 8:30 am on the first batch of year, month and day, and 8:30 am on the second batch of year, month and day.

2. Meeting point: At the entrance of the lobby of Longyun Hotel, take the bus rented by the hotel to the event location.

3. Activities: Sightseeing, barbecue and outdoor development games (see Appendix 4 for details) 1) Arrive at the destination at 9:00 am: take group photos 2) Outdoor activities from 9:30-11:30 am Expansion games 3) Barbecue from 11:30 am to 14:30 pm 4) Free activities from 14:30 to 15:30 pm 5) Gather at 16:00 and return on time.

6. Activity budget:

1. Car fare:

2. Scenic spot tickets:

3. Oven fee:

4. Barbeque food (see attachment 1 for details):

5. Interactive game souvenirs (see attachment 2 for details):

6. Spare medicines (for details) See Appendix 3):

7. Total budget funds for this time:

xx

8. Event staff arrangement:

Planning Personnel: Purchaser:

Props, photography: Storage of items:

Outdoor activity and game organization: Activity safety person in charge:

9. Precautions:

p>

1. This activity is an outdoor sport, and participants are advised to wear light, loose clothes and sports shoes.

2. You must strictly abide by the time regulations, arrive at the meeting point on time, and count the number of people in a timely manner. Everything is subject to the arrangements of the person in charge.

3. Do a good job in communication and coordination. If any emergencies occur during the period, report them to the event organizer in a timely manner and prepare contingency plans.

4. Take good care of your belongings, especially mobile phones, wallets and other valuables.

5. Pay attention to safety when grilling to avoid burns.

6. Dispose of garbage properly, protect every plant and tree in the scenic spot, and be a civilized person. Team building activity planning plan 7

1. Time and location

Time: x month x, 20xx - x month x, 2020

Location: xx Hall

2. Event Hosting

Organization: xx

Person in charge: xx

Host: xx

Justice, Medical Insurance x

Administration: xx

Title: xx

3. Preparation before the competition

Day x —Preparing questions on x day

Training staff and buying prizes on x day

Decorating the classroom and completing all matters on x day

IV. Competition venue layout

1. Right in front: Hang out the "May 4th Strong Quality, Practice Internal Strength" free knowledge competition with prizes.

2. The front blackboard is the lucky draw place, with the words "Strengthen quality, practice internal skills, learn knowledge, and create management".

3. The question-taking office is located at the back of the training center, and the award-receiving office is located on the podium.

5. Activity Instructions

1. This activity is a free competition with prizes, which is informative and interesting. There is no participating team or designated participating members. All employees in our workshop can actively participate.

2. The topics of this activity are divided into four categories, as follows:

Numbers 1-50 are factory regulations and disciplines and basic common sense of our factory

Numbers 51-150 are professional knowledge, among which questions 51-75 are suitable for electrical appliance classes, questions 76-100 are suitable for fleets, questions 101-125 are suitable for maintenance classes, and questions 126-150 are suitable for production positions.

Numbers 151-200 are interesting riddles

Numbers 201-250 are brain teasers

3. This activity has two types of questions, A and B. Among them, type B questions are more difficult, and A and B are marked after the question number, such as "21 (B)". There are 250 questions in the activity, including 150 type A questions and 100 type B questions.

4. All question numbers are hung on the wall according to categories, and the audience can only choose one question number at a time.

5. The prizes in this event are divided into two types: prize type and lucky draw. The prize type is that for every correct answer to a question, you can get a small exquisite prize; the lucky draw means that the audience gives up after answering the question correctly. To win prizes, you must answer the prescribed number of questions correctly and finally participate in a lucky draw. The minimum value of the lottery prize is 10 yuan and is 100 yuan.

6. Anyone who holds 20 type A or 10 type B or 15 mixed type A or B, and the name of the employee is signed by the staff at the prize redemption office. At this time, this audience can participate in the lucky draw.

7. If the audience’s question paper is damaged, regardless of whether the answer is correct or not, the prize will not be redeemed and will be deemed invalid.

6. Activity Procedures

1. After the activity starts, the audience specifies the question number they want to choose. The staff takes out the question label corresponding to the question number and gives it to the audience. At the same time, the staff Removing the question number indicates that the question has been selected.

2. The audience gets the question label, thinks about it and then tells their answer at the prize redemption point (the answer can also be written on another piece of paper, but it is prohibited to write it on the question label, otherwise the prize will not be redeemed).

For example: if the answer to this question is correct and the audience chooses an instant prize, the staff will redeem it on the spot and return the question signature.

If the answer to this question is incorrect, the staff will take back the question label, hand it to the question collection office, and list the question number again. The question is still valid;

The answer to this question is correct. , the audience is ready to participate in the lucky draw, the staff will write the name of the audience on the ticket and hand it to them for accumulation.

3. If an audience member accumulates enough lottery tickets, he or she can go on stage to draw a lottery, and the prizes will be redeemed on the spot. There are 12 digits in the lottery, and this is the end of the draw.

7. Prize settings

1. The prize for each type A question is about 1 yuan, ***about 150 copies are required, and the prize for type B question is about 2 yuan,* **It takes about 100 points, and the above** costs 350 yuan.

2. There are 12 digits in the lottery, that is, "5 digits for 10 yuan, 4 digits for 20 yuan, 2 digits for 50 yuan, and 1 digit for 100 yuan", with a maximum of 330 yuan.