River Chief System Work Plan Part 1

In order to implement the spirit of the "Opinions on Comprehensive Implementation of the River Chief System" at the provincial, municipal and district levels, To further improve the level of river protection and management in our town, this year's work plan is specially formulated according to the requirements of the "__ Town Comprehensive Promotion of the River Chief System Implementation Plan" (Donghe Xianfa [__] No. 19).

1. Guiding ideology

Guided by the spirit of the 19th National Congress of the Communist Party of China, closely focusing on the overall layout of "Five-in-One" and "Four Comprehensives", firmly establish the concept of green development , seize the opportunity to create a national ecological civilization pilot zone, adhere to the water management policy of "water conservation priority, spatial balance, systematic management, and two-hand effort", with the main tasks of protecting water resources, preventing and controlling water pollution, improving the water environment, and restoring the water ecology. Further deepen and innovate the comprehensive management of ecological waters in our town, implement the comprehensive implementation of the river chief system, build a river and lake management and protection mechanism with clear responsibilities, orderly coordination, strict supervision, and powerful protection, and make every effort to protect and improve the water ecology, and strive to build a provincial-level small Cities and towns provide water environment support.

2. Work Objectives

Conscientiously implement the decision-making arrangements for the comprehensive implementation of the "river chief system" at all levels, continue to improve and improve the town-level river chief organizational system, and strengthen the functions of the town-level river chief office , fully implement working systems such as river chief meetings, information sharing, work supervision, assessment, accountability and incentives.

Continue to carry out the planning and construction of river sections and monitoring points, and strengthen the monitoring and management of water quantity and quality; solidly promote water resources protection, water pollution prevention and control, water environment management, water ecological restoration and other work to ensure that random land reclamation The "four chaos" phenomena such as random construction, random drainage, random sand mining, and random interception have been effectively curbed, and the water quality of the river has been effectively improved; the "one river, one policy" __ year mission has been implemented to ensure that the water discharge in the entire Shenxiangou basin reaches the National Class V water quality; increase joint investigation and law enforcement efforts to ensure that there are no new illegal buildings within 50 meters of the shoreline; continue to promote the demolition of illegal structures along the river, and gradually restore the ecology of coastal waters.

3. Work tasks

(1) Continue to strengthen water resources protection

On the basis of __ years, continue to implement the water resources management system and strengthen water resources The rigid constraints of the three red lines of development and utilization control, water use efficiency control, and water functional zone restrictions on pollutant intake will be implemented. Dual control actions on the total amount and intensity of water resource consumption will be implemented, and water functional zone management and supervision will be strict.

(2) Comprehensively promote the management and protection of water shorelines

Strictly adhere to the blue line of river shorelines and riverside ecological protection, expand the results of demolition and control of illegal activities, and the transformation of breeding areas, and formulate A sustained, effective, and stable management plan will basically restore the entire river ecosystem of Shenxiangou, New Weidong River, Gubei Main Canal, and Tongji River, and strive to promote the gradual ecological restoration of Hongqigou and Laoweidong Rivers.

(3) Continue to strengthen water pollution prevention and control

Continue to strengthen comprehensive management and investigation of pollution sources entering rivers, strictly enforce environmental access for new projects, and strictly prevent and ban those that do not comply with industrial policies and seriously pollute water. “Ten Small” Enterprises for the Environment. On the basis of __ years, we will continue to promote the prevention and control of pollution from industrial and mining enterprises, urban life, livestock and poultry breeding, aquaculture, agricultural non-point sources, shipping ports, etc., strengthen and expand the clean transformation of key industries, and the results of centralized pollution control in industrial clusters to ensure The water environment quality reaches the standard throughout the year.

(4) Continue to strengthen water environment management

According to the "one river, one policy", refine and quantify the water quality protection goals of various water bodies. Promote the progress of cleaning up illegal buildings and sewage outlets in drinking water source protection zones, carry out standardized construction of drinking water sources, and promote the improvement of water environment in small watersheds and rural areas. Continue to implement the drainage and rectification of black and smelly water bodies, and expand the work area to the entire town's land to ensure that groundwater is not polluted.

(5) Continue to strengthen water ecological restoration

Continue to promote river ecological restoration and protection, and give full play to the water forest field system, water source conservation forest and wetland system, water and soil erosion prevention supervision and comprehensive management system , safe ecological water system, etc. to ensure that water ecological restoration is greatly improved.

(6) Strengthen law enforcement and supervision

Implement the river and lake protection and management system, implement the linkage mechanism between administrative law enforcement and criminal justice, and seriously investigate and deal with crimes related to rivers and water. Increase the frequency of public security, water conservancy, environmental protection, agriculture, administrative law enforcement, planning and construction and other departments to jointly carry out special law enforcement actions on water resources, water ecology and water environment on a regular or irregular basis, and severely crack down on arbitrary occupation, disorderly construction, disorderly drainage and disorderly construction in accordance with the law. Interdiction and other illegal activities endangering water safety.

(7) Continue to carry out the "Star River" selection activities

On the basis of river water resources, water environment, water ecology and water safety as the main selection contents, refine the "star river" selection activities. "Star River" selection criteria, increase the content of water protection and management, accelerate the comprehensive management and improvement of the provincial-controlled river Shenxiangou __ Town section, and promote the orderly and effective implementation of river protection, prevention, treatment, restoration and other work.

4. Safeguard measures

(1) Strengthen organizational leadership. The comprehensive implementation of the river chief system is a statutory task and an important measure for our town to promote the construction of ecological civilization. A centralized and unified coordination mechanism has been established for rivers at the town and village levels in accordance with the requirements of "one river, one river chief, one team, one dedicated account, and one goal to the end". All villages and departments must adhere to the basic principle of "the party and government share the same responsibilities and local responsibility", effectively strengthen organizational leadership, and improve the river chief organizational system. Each river chief is not only the first person responsible for the comprehensive improvement of the river basin in his jurisdiction, but also the first responsible person for the town-level rivers. He must clarify his rights and responsibilities, assign people to their posts, and promote the implementation of all the tasks of the river chief system.

(2) Close collaboration. The liaison departments of each river must be responsible to the river chief, coordinate and supervise the working groups to carry out daily work such as comprehensive coordination, law enforcement supervision, supervision and inspection, assessment and evaluation, publicity and reporting, and linking up the past and the next.

Collaboration should be strengthened at the town and village levels, and all functional departments at the town level should perform their respective duties and responsibilities, establish a monitoring mechanism for ***enhancement, and work together to ensure *** * Management supervision mechanism, coordinated law enforcement mechanism, and diversified and stable investment mechanism to perform relevant responsibilities for watershed protection and management in accordance with the law. All relevant responsible units should report the completion status of each project undertaken, existing problems and matters that need to be coordinated and resolved in a timely manner to the Zhenhe Chief Office for summary.

(3) Strengthen work supervision. Establish and implement a long-term supervision mechanism, a work implementation system and a sound evaluation and evaluation system. Those who fail to perform or incorrectly perform their duties and cause environmental pollution and ecological damage must be held accountable in accordance with the law.

(4) Strengthen publicity and guidance. Relying on WeChat public accounts and other new media means, we will deeply publicize the significance of implementing the "river chief system" and advocate civilized living habits. At the same time, a river chief public notice board was erected at a conspicuous position on the river bank, indicating the river chief's responsibilities, river overview, management objectives, supervision telephone number, etc., and accepting social supervision.

Work Plan for the River Chief System Part 2

In order to conscientiously implement the "Opinions on Comprehensive Implementation of the River Chief System" issued by the General Office of the Central Committee of the Communist Party of China and the General Office of the State Council (Office Zi) [__] No. 42), the Ministry of Water Resources and the Ministry of Environmental Protection implement the spirit of the "Implementation Plan for the Opinions on Comprehensive Implementation of the River Chief System" (Water Construction Guanhan [__] No. 449), establish and improve the river health security system and management mechanism, Further improve the town's river protection and management level and ensure the implementation of various goals and tasks set in the "Implementation Opinions on the Comprehensive Implementation of the River Chief System in Minle County". According to the "Work Plan for the Comprehensive Implementation of the River Chief System in Gansu Province" and "Comprehensive Implementation of the River Chief System in Zhangye City" "Work Plan for the River Chief System", combined with the actual situation of our town, a work plan for the river chief system in Sanbao Town in 2021 has been specially formulated.

1. Guiding ideology

Guided by Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era and the spirit of the 19th National Congress of the Communist Party of China, in accordance with "unified deployment, step-by-step implementation, coordinated governance, long-term We adhere to the principle of "effective management", adhere to legal governance, scientific governance, joint governance, and national governance, comprehensively implement the river chief system, and build a river management and protection mechanism with clear responsibilities, hierarchical management, strict supervision, and powerful protection, in order to maintain the health, life, and health of the river. Provide institutional guarantee to achieve sustainable utilization of river functions.

2. Overview of the river

(1) Basin scope

The Hongshui River originates from the northern slope of Longkong Ridge in the Qilian Mountains, with its source starting from Kashan Mountain in the east and Qingyang in the west After the river flows out of the valley, it runs through the Minle Sloping Plain, to the Ganchaidun of Shigang Duntan, where it joins the main river beds of Daduma and Xiaoduma, and leads to the Zhangye Daman Canal to the west. The general name is Jiulong River , to the north of Taipingbao, where it joins the Shandan River, and was called weak water in ancient times. There are mainly 23 tributaries on both sides of the strait, including Cigeda, Limeyao, Zagaxia, Dongdaoliu, Xidaoliu, Dachanghu, and Zhengnangou, which converge into the reservoir at the mouth of Longtagou in Shuangshu Temple. The total length of the river is 112.9km, of which: the main river above Shuangshusi Reservoir is 37.0km long, and the main river below it is 62.9km long. The average river channel ratio is 3, and the total basin area is 578km2.

(2) Climate and Hydrology

The source of the river is steep and has the characteristics of large mountains, deep ditches, long beams and steep slopes. There are many northern slopes of mountains between 3800-4800m above sea level. Discover pendant and cirque glaciers. There are also glacier-type regenerated ice tongues on the canyon cliffs. The glacier area in this area is 3.12km2, and the ice melt water volume is 02.3 million m3. The upper reaches of the river have more precipitation, lower temperatures, less evaporation, gentle terrain, good vegetation, mostly shrubs. The middle reaches of the river have steep mountains and narrow valleys. The vegetation on shady slopes is better than that on sunny slopes. There are large pine forests distributed, and the precipitation is second only to the upper reaches. Due to Multiple tributaries converge and flow through the canyon section. The water flow is very fast and the river mud and sand are mostly bedrock. The mountains in the lower reaches are gentle, the vegetation is poor, the precipitation is significantly reduced, and the evaporation is large. The river runs on the pebble layer. The valley is deeper near the mountain exit. The valley is wide and shallow, and the river channel is unstable. There are intermittent flash floods on both sides of the bank. The main source of suspended sediment in rivers. Below the mouth of the river in the basin, there are flood river irrigation areas along both sides of the river, which governs four townships (towns) of Yonggu, Honghong, Sanbao and Liuba, as well as 43 government agricultural and forestry farms. The river flows into Shigang Duntan in the lower reaches. The lower reaches of the river mainly include: Shuangshusi 1# and 2# Power Station, Gaoyantou Hydropower Station, Minle County, Mazhuang Power Station and 46 villages, 6 government farms, Zhangye City, National Highway 227, Jinzhang 330kw high-voltage transmission line, etc. .

3. Work objectives

In accordance with the relevant requirements of the "River Chief System" work, solidly promote the management of the river in Sanbao Town. By the end of 2021, the Sanbao section of the Flood River will have eliminated garbage and rivers. The environmental outlook has been significantly improved. Strengthen the management of each material yard, clarify management responsibilities, and solve the problem of overlapping management functions. Implement the law enforcement and inspection system for river sand mining to prevent illegal mining and illegal mining of sand and gravel. Ultra-deep and ultra-wide mining, and mining without a license. The sand mining plan needs to be further revised, and supervision of various material sites needs to be strengthened to ensure standardized and orderly sand mining in flood rivers.

4. Work tasks

Carry out comprehensive rectification of illegal activities such as direct discharge of sewage, illegal construction (structures) along the coast, and livestock and poultry breeding; the focus of monitoring is to strictly The environmental access system strengthens the law enforcement supervision and management of river sand mining; the focus of management is to strengthen the management and protection of river environmental sanitation, control the generation of new pollution from the source, and improve the long-term mechanism of the "river chief system". Through publicity, various activities and the promotion of the "River Chief System" work, we can create a public opinion atmosphere, arouse the public's attention, form a strong trend of social supervision and public participation, and guide units, groups and individuals to fulfill their social responsibilities.

5. Work measures

Strengthen joint law enforcement efforts, clarify the regulatory responsibilities of water affairs, land and other departments, effectively strengthen inspections of the mainstream rivers of flood rivers, and severely crack down on various illegal activities.

(1) Livestock and poultry breeding pollution control project. We will solidly promote the reduction of pollution emissions from livestock and poultry breeding, implement controls on livestock and poultry breeding areas and total pollutant emissions, promote the transformation and upgrading of the animal husbandry industry, and complete the pollution control work at the breeding farms along the coast of Sanbao Town.

(2) Strengthen coastal environmental sanitation management. It is necessary to carry out the "no garbage in the whole area" campaign in depth, improve the supervision and assessment plan, and further improve the long-term rural cleaning mechanism.

(3) Strengthen media publicity and give full play to the guidance of public opinion.

Each village gives full play to the guiding role of news and public opinion, and carries out extensive and sustained multi-level and multi-form publicity and education activities on ecological civilization construction through radio, television, WeChat and other media, strengthens the summary and promotion of advanced models, and forms the basis for promoting the construction of ecological civilization. ***Enjoy the good atmosphere of ecological civilization construction.

(4) Establish a supervision platform and give full play to the role of public supervision. Jointly establish a social supervision platform through communication, the Internet and other shortcuts, further improve the problem supervision mechanism, give full play to the supervision role of public opinion, and handle problems in a timely and effective manner.

(5) Give full play to the role of grassroots organizations and establish and improve daily management mechanisms. Implement the work responsibilities of grassroots organizations such as the two committees of Sanbao Town and Village, and supervise the implementation of the "River Chief System" system.

6. Safeguard measures

(1) Strengthen organizational leadership. Establish and improve the two-level river chief system of the "river chief system". The main party and government leaders are the chief river chiefs at the town level. Each relevant village has a clear village-level river chief. River chiefs at all levels perform their duties, and the three parties work together to complete the three tasks. Fort town inspection work.

(2) Strengthen the working mechanism. Strengthen the work coordination mechanism, give full play to the organizational and coordination role of the "River Chief System" work leading group, organize work meetings every quarter, exchange advanced experience in a timely manner, coordinate and solve problems and difficulties encountered, report the rectification situation every month, and implement rectification work Supervision and assessment.

(3) Strengthen supervision and assessment. Based on the unit's self-examination, the specific inspection content of the month will be implemented one by one according to the time nodes and work tasks in the task book. Administrative villages with slow progress and poor implementation will be notified and held accountable.

(4) Strengthen publicity and promotion. Create a good atmosphere for work advancement, give full play to the guiding and supervisory role of news and public opinion, guide the town's cadres and masses to fulfill their social responsibilities, consciously control pollution, and promote clean production and life.

River Chief System Work Plan Part 3

Our town’s river chief system work has achieved preliminary results in __ There has been a significant breakthrough in environmental governance, which has enhanced the awareness of water protection among cadres and the masses. In XX, our town will continue to unswervingly adhere to the ecological strategy of "Golden Mountains and Silver Mountains Are Green Waters and Green Mountains", strictly follow the work requirements of the river chief system, and further promote Taiping For the water environment management work in Qiao Town, a __-year work plan has been formulated.

1. Guiding ideology

Guided by the Scientific Outlook on Development, firmly establish the concept of "lucid waters and lush mountains are invaluable assets", with the goal of building a "beautiful Taipingqiao Town", Adhere to scientific water control, water control in accordance with the law, and water control by the whole people, thoroughly implement the "river chief system", and follow the principles of "unified deployment, separate responsibilities, local implementation, and long-term management" to conscientiously implement the environmental protection responsibilities of relevant departments and establish a long-term Management mechanism to create a clean water environment.

2. Work Objectives

In accordance with the relevant requirements of the "River Chief System", we will solidly promote the water environment management in the Taipingqiao Town section. By the end of __, the black and odorous watershed in the Taipingqiao Town section will be eliminated. Rivers and garbage rivers, the environment of rivers has been significantly improved, the total discharge of major water pollutants has been significantly reduced, the quality of surface water environment has remained excellent, the appearance of river water has become clearer and cleaner, the quality of water environment has been further improved, and the outbound water quality is better than Category II Water body standards, people's satisfaction has improved significantly.

3. Work tasks

Adopt the policy of "co-governance of waterfronts, simultaneous construction and management, combined supervision and public participation", and focus on the three major aspects of "engineering water control, management water control, and social water control" We will begin to comprehensively strengthen water system environmental protection and pollution control. Comprehensively rectify illegal activities such as direct discharge of sewage from coastal operations, livestock and poultry breeding, and illegal construction (structures); the focus of monitoring is to strictly enforce the environmental access system and strengthen law enforcement supervision and management of water-related environmental pollution; the focus of management is, Strengthen water body environmental sanitation management and protection, control the generation of new pollution from the source, and improve the long-term mechanism of "five water pollution control". The focus of participation is to increase the publicity of water environment improvement through publicity and various activities, create a public opinion atmosphere, arouse public attention, form a strong trend of social supervision and public participation, and guide units, groups and individuals to fulfill their social responsibilities.

4. Work Measures

In order to achieve the goal of water control, engineering water control is implemented in accordance with the idea of ??"unified planning, near first and then far, highlighting key points, classification and step by step". Recently, the sewage treatment of livestock and poultry farms and the treatment of domestic sewage in rural areas along the river have further improved the water quality of the river. In the long term, through engineering measures such as diverting rainwater and sewage in coastal areas and collecting all sewage, the water control effect of "clear water, smooth water, green shores, and beautiful scenery" will be achieved.

1. Livestock and poultry breeding pollution control project.

Solidly promote the reduction of pollution from livestock and poultry breeding, implement the control of livestock and poultry breeding areas and the total amount of pollutant emissions, promote the transformation and upgrading of the animal husbandry industry, and complete the pollution control work at the coastal farms in Taipingqiao Town.

2. Rural domestic sewage treatment project.

Choose appropriate domestic sewage treatment models according to local conditions to improve the treatment efficiency and coverage of rural domestic sewage.

3. Strengthen the management of street domestic sewage facilities to ensure the normal operation of facilities. Supervise the construction of street sewage treatment facilities to ensure project quality. At the same time, it is necessary to establish and improve the operation and maintenance management of treatment facilities after completion to ensure the operation efficiency of street domestic sewage treatment facilities.

4. Strengthen the daily management of the pit water system and promptly detect damage and violations. We will carry out special rectification actions to “remove illegal construction and illegal occupation of rivers” and strengthen river management and law enforcement. Strengthen daily management and maintenance of rivers and coasts based on functions, improve long-term management mechanisms, improve daily inspection mechanisms, investigate and deal with illegal occupation of rivers, and promptly discover and deal with damage to facilities and illegal construction.

5. Strengthen coastal environmental sanitation management and create a clean water system environment. We will do a good job in the creation and construction of "clean villages", improve the supervision and assessment plan, and strengthen the supervision and assessment of coastal environmental sanitation. It is necessary to carry out the creation of "clean villages" in depth and further improve the long-term rural cleaning mechanism.

6. Strengthen media publicity and give full play to the guidance of public opinion. Towns and villages give full play to the guiding role of news and public opinion, and carry out extensive and sustained multi-level and multi-form publicity and education activities on ecological civilization construction through mainstream news media such as radio, television, newspapers, periodicals, and text messages, strengthen the summary and promotion of advanced models, and formulate and promote *** Construction *** enjoys a good atmosphere for the construction of ecological civilization.

7. Carry out various group activities and guide the participation of all sectors of society. All departments, villages and town units and groups should focus on the rectification work objectives and carry out various forms of main activities to guide the people of the town to fulfill their social responsibilities, consciously control pollution, and promote clean production and life. Give full play to the role of non-governmental environmental protection organizations and environmental protection volunteers. Further improve the people's awareness of responsibility and participation in water environment governance, and create a good atmosphere for the whole society to care about, support, participate in and supervise water environment governance.

8. Establish a supervision platform and give full play to the role of public supervision. Jointly establish a social supervision platform through communication, the Internet and other shortcuts, further improve the problem supervision mechanism, give full play to the supervision role of public opinion, and handle problems in a timely and effective manner.

9. Give full play to the role of grassroots organizations and establish and improve daily management mechanisms. Implement the water control responsibilities of the Taipingqiao Town water system involving street and village committees and other grassroots levels, clarify the river lengths of each section of the water system, and supervise the implementation of specific water control plans and daily management systems to give full play to the role of grassroots organizations in water control.

5. Safeguard measures

1. Strengthen organizational leadership. Establish and improve the Taipingqiao Town Section of Liancheng Street

The "river chief system" two-level river chief system. The main party and government leaders and leaders in charge are the town-level chief river chief and the town-level river chief. Each relevant village has a clear The village-level river chiefs, river chiefs at all levels perform their duties, and the *** work together to do a good job in the supervision of Taipingqiao Town.

2. Strengthen the working mechanism. Strengthen the work coordination mechanism, give full play to the organizational and coordination role of the "River Chief System" work leading group, organize work meetings every quarter, exchange advanced experience in a timely manner, coordinate and solve problems and difficulties encountered, report the rectification situation every month, and implement rectification work Supervision and assessment.

3. Strengthen supervision and assessment.

Based on the unit's self-inspection, the specific inspection content of the month will be implemented one by one according to the time nodes and work tasks in the task book. Administrative villages with slow progress and poor implementation will be notified and held accountable. At the same time, the completion of water control will be included in the annual comprehensive assessment of each village.

4. Strengthen financial security. Arrange funds for

"River Chief System" project construction and management to provide financial guarantee for completing project construction and management with quality and quantity.

5. Strengthen publicity and promotion. Create a good atmosphere for work advancement, give full play to the guiding and supervisory role of news and public opinion, guide the town's cadres and masses to fulfill their social responsibilities, consciously control pollution, and promote clean production and life.

Work Plan for the River Chief System Part 4

According to the spirit of the relevant documents of the provincial, municipal and district river chief system, and the requirements of the "__ District "River Chief System" Implementation Plan", the town The party committee and government attach great importance to and conscientiously implement various promotion works of the river chief system. We will now make the following report on the self-examination of the promotion of the river chief system in our town in the past six months:

1. Basic situation of the river course

The Baita River in Huilong Town belongs to the Luoxi River system in the __ River Basin. It originates from the Julong Reservoir in Laochangya Town, Huilong Town, flows through Changle Town in Diaojinggou Village, and flows into the Luoxi River. Within 7.8 kilometers of Huilong Town, there are two branch ditches (Group 2 from Niochang Village to Group 3 from Wangjiadian Village enter the Baita River; Group 4 from Shimenlou Village to Group 2 from Diaojingou Village enter the Baita River). 12.6 square kilometers, the current standard is once every 10 years, and the discharge volume is 300 cubic meters per second.

The main manifestations of river pollution are: first, sewage from breeding farms and residents’ waste are dumped into the river at will, causing serious river pollution; second, the disorderly development and utilization of land near the river, and illegal buildings encroaching on the river; third, The rivers are left unmanaged, and aquatic plants, duckweeds, debris, etc. accumulate in the rivers for a long time, making the rivers dirty and messy.

2. Work progress

(1) Strengthen organizational leadership and clarify work responsibilities. In accordance with the requirements of "establishing a management organization, clarifying work goals, implementing management responsibilities, and strict management assessment", our town established a leading group for the river chief system headed by the party committee secretary, and established river (sections) at the town and village levels. The chief responsibility system has been established, and the implementation plan, work plan and related work system of the river chief system in Huilong Town have been formulated. Implement the shared responsibility of the party and government, build an organizational system, clarify work responsibilities, and strengthen linkage among villages.

(2) Conduct careful investigation and establish four lists. Conduct a comprehensive investigation of the water resources, water environment, and water ecological conditions of rivers and ponds in Huilong Town, comprehensively evaluate the health status of rivers and reservoirs, and establish four lists of goals, problems, tasks, and responsibilities, and formulate plans based on the established list of issues Corresponding work tasks, and implement the corresponding responsible units and responsible persons. Work goal: Through three years of hard work, by 2020, the total amount of non-discharged water pollution related to Huilong Town's rivers will be reduced, the compliance rate of surface water environmental functional zones will reach 100, cross-village river junction sections, and the town's centralized drinking water The water quality compliance rate of the water source reaches 100%; the focus is to strengthen multiple improvements and maintenance of the ecological environment within the river range of Huilong Town, build water-friendly ecological shorelines according to local conditions, comprehensively improve the rural water environment, and promote the construction of beautiful towns and villages.

(3) Mobilize and deploy in a timely manner to promote work implementation. Conscientiously implement the central, provincial, municipal, and district decisions and arrangements on the river chief system, and regularly hold meetings to promote the river chief system in Huilong Town. Several special meetings on the work of the river chief system were held to carefully sort out the problems existing in the river bank under the jurisdiction of Huilong Town, analyze the causes, and scientifically formulate work tasks and goals. Extensive publicity was carried out throughout the town. More than 40 slogans were hung on the main road sections of the town and in each village (community). Public notice boards were placed in each river section for publicity. Village Xiang and town group WeChat were used to publicize work related to the river chief system. universal.

(4) Strengthen river protection and promote pollution control. In accordance with the unified deployment of the District River Chief Office, river inspections were carried out conscientiously. Members of the town party committee took the lead in organizing the river chiefs of each village (community) to conduct comprehensive inspections of the river reservoirs under their jurisdiction. So far, there have been 30 river inspections. Deal with problems in a timely manner.

We will vigorously promote the rectification of agricultural non-point source pollution, strictly implement the system of restricted and restricted areas for livestock and poultry breeding, comprehensively close and dismantle 7 polluting farms along the river, implement environmental protection standards for other farms, and require rectification and implementation on schedule.

3. Problems

First, there is a lack of funds for pollution control and the construction of sewage treatment facilities is behind schedule.

Second, there is a lack of professional pollution control facilities and personnel, and the identification of pollution sources, water quality supervision, and treatment measures are not in place.

Third, the public’s awareness of environmental protection still needs to be improved.

4. Next work arrangements

1. Based on the actual situation of the river chief system in Huilong Town, re-mobilize, redeploy, and identify and fill vacancies;

2. Conduct a re-investigation on the situation of each river bank in Huilong Town, then establish four lists, and scientifically formulate an implementation plan;

3. Develop a work plan for the river chief system in Huilong Town, and list Timetable and identify responsible persons;

4. For river patrol activities, timely formulate rectification plans for identified problems and implement rectification measures.

River Chief System Work Plan Part 5

District Urban-Rural and Water Affairs Bureau:

In the past six months, according to the relevant work plans of the Municipal and District River Chief System Management Office In the spirit of the document, under the strong guidance of superior business departments and the careful deployment of the street party working committee and offices, the street river chief system management office pioneered and innovated, took the lead, and paid close attention to implementation, and successfully completed the river chief system. Various management tasks have been achieved and certain results have been achieved. The completion of the half-year work is now summarized as follows:

1. Understand the spirit and essence, and establish a leadership mechanism for the management of the river chief system

The municipal and district-level river chief system offices issued instructions on the implementation of the river chief system After receiving the documents on the river chief system management work, the street party working committee and office attached great importance to it. They took advantage of the opportunity of convening the party working committee meeting to organize and study the relevant documents of the Chengdu Jinniu District river chief system management work office. Spirit. On the basis of conscientiously studying the spirit of the document and understanding the essence of the spirit, a leading group for the management of the river chief system was established, with the street party and government leaders as team leaders and the leaders of each branch, department heads and community leaders as members. The Cultural Promotion Section established the River Chief System Management Office, drafted and formulated the "Implementation Opinions of Jinquan Street on the Implementation of the River Chief System Management Work" based on the actual work of the subdistrict, clarified the list of responsibilities of the street and community river chief system management office, and formulated List of street chief river chiefs, river chiefs and community river chiefs, and responsible rivers. On this basis, a mobilization and deployment meeting for the management of the street river chief system was held in a timely manner, which clarified the division of labor, implemented tasks, consolidated responsibilities, and put forward specific requirements, ensuring the smooth development of this work.

2. Improve the system and regulations to ensure the normal operation of the river chief system management

According to the spirit of the document notification of the district river chief system office and combined with the actual situation of the street, the street river chief system management office The "Implementation Plan of Jinquan Street on the Implementation of the River Chief System Management Work" was formulated; at the same time, the "Jinquan Street River Chief System Management __ Year Work Points", "Jinquan Street Notice on the River Chief System Management Work Conference System", "Notice of Jinquan Street on the Assessment and Incentive Measures for the Management of the River Chief System", "Notice of Jinquan Street on the Supervision and Inspection System for the Management of the River Chief System (__)", "Notice of Jinquan Street on the Information Notification System of the Management of the River Chief System" , "Notice on the Inspection and Supervision System for the Management of the River Chief System in Jinquan Street" and other six documents were distributed to departments and communities for implementation, ensuring that various systems and measures for the management of the river chief system are implemented.

3. Implement specific measures and complete various rectification tasks assigned by superiors

First, in order to enhance the sense of responsibility and participation of all sectors of society in the protection of water environment in the jurisdiction, and create care for the whole society , To protect the good atmosphere of rivers and canals in Jinquan District, the opinions on the implementation of the river chief system management work and the list of total river chiefs, street river chiefs and community river chiefs in Jinquan Street District have been published online to accept the supervision of the people in the jurisdiction, and at the same time also We produced and hung 24 slogans to promote the implementation of the river chief system, increasing publicity efforts and making them well-known to every household. Second, according to the notification requirements of the district river chief system management office, the sub-district river chief system management office promptly produced and installed 23 public notice boards for the river chief system in the jurisdiction. Third, according to the "Jinquan Street List of Comprehensive Water Environment Management Issues" issued by the District River Chief System Office, the Street River Chief System Management Office has paid close attention to implementation and actively rectified. Currently, 56 rectification points have been completed, accounting for 10% of the target tasks. 45. At the same time, a plan for the treatment of black and odorous water in a ditch in the street and a plan for the treatment of mixed rainwater and sewage discharge on Huangjin Road were drawn up.