Infrastructure and logistics

1. Infrastructure work

(1) Basic construction work

Construction of the student apartment building No. 17 has started. Student Apartment Building No. 17 is a continuation project in the "Twelfth Five-Year Plan" with a construction area of ??38,456 square meters and is used as a student dormitory. In 2012, with the strong promotion of the school and the efforts of many parties, the planning adjustment and the demolition of the Ministry of Land and Resources Party School Training Center on the East 3rd and 4th floor were solved. The project officially started construction in November 2012.

2. Submit a feasibility study report on the engineering laboratory building. The Engineering Laboratory Building (formerly the Jewelry Building) is a new project in the school’s “Twelfth Five-Year Plan”. The Infrastructure Department has completed the preparation of the project’s feasibility study report and submitted it to the Ministry of Education for approval.

(2) Decoration and repair work

1. Decoration and renovation project of the exchange center. In order to celebrate the 60th anniversary of the school's founding and improve the conference environment, we applied for special funds for renovation and purchase in 2012 to renovate the exchange center. After several months of intense construction, various functions of the communication center have been improved, and the decoration style is consistent with that of the supporting buildings. The project was officially handed over in August 2012, ensuring the meeting arrangements during the school anniversary.

2. Renovation and renovation of the original school history museum, school union, and halal restaurant. The original school history museum, school union, and halal restaurant are a series of old buildings located on the north side of the school's Summer Cultural Square. They are in disrepair, have aging wiring, and are in urgent need of repair. Since 2011, the school has applied for special funds for repair and purchase and began to renovate and repair these buildings. In 2012, the renovation work of the school history museum was completed, and the original school history museum was converted into the health room of the school hospital and the office space of the school union; the renovation of the faculty canteen by the school union was completed and handed over for use; the renovation of the halal canteen was completed and handed over for use.

3. Complete the work of restoring green space. In 2011, the student activity center was demolished and a swimming pool green space was built on the original land. In 2012, the green space construction was completed and passed the acceptance inspection by the Beijing Greening Engineering Association.

(3) Infrastructure transformation

1. In January 2012, the relocation of the No. 5 power substation and distribution room was completed, and the power capacity of the No. 17 student apartment was reserved.

2. Make overall plans for the school’s electricity load to ensure the safety of electricity during school celebrations. The electricity supply for the construction of the newly built No. 17 Building was adjusted and renovated, and the electricity supply for the 14th floor of the school, the halal restaurant, the faculty restaurant, the school hospital and the trade union office building, and the first and second east floors were adjusted and renovated.

2. Logistics work

1. Campus environment improvement work. According to the relevant requirements of the School Anniversary Office, the Logistics Office formulated the logistics support team implementation plan for the 60th anniversary of the China University of Geosciences (Beijing) on ??the logistics service support work for the school's 60th anniversary, and carried out campus environment improvement work. In conjunction with the 60th anniversary celebrations of the school, the campus has been comprehensively greened and beautified, focusing on the greening around the International Conference Center, Gymnasium, Library and Shaw Building. Completed the re-carving of stone statues of Li Siguang, He Changgong, Gao Yuangui, Liu Xing and "geologists". Completed the carving and production of Mount Tai stone carvings with the inscription "Cradle" written by Premier Wen Jiabao. Completed the "foundation stone" project of building the school. In order to celebrate the 60th anniversary of the school and create a festive, joyful and vigorous atmosphere on the campus, a flower bed decoration project for the school anniversary was implemented in accordance with the principles of "grand and enthusiastic, prominent subject, moderate scale, innovation and frugality". Completed the maintenance and renovation project of the silicon PU plastic basketball court of the school playground and the basketball court of the Zhoukoudian internship station. Completed the repair project on the lower steps on the east side of the school playground stand; completed the floor paint paving repair project on the school playground stand (rostrum). Completed the construction of permeable bricks in the western family area and the installation of security doors and plastic steel windows in residential buildings. Completed the restoration and cleaning project of Chairman Mao's statue. The maintenance project of the main entrance (middle gate) of the main building has been completed; the painting project of the office building, ground control building and playground guard net has been completed. Complete the pruning project of the canopy of street trees on the campus’s main thoroughfare. The transplantation project of pitch pine in Section 37 on the north side of the playground fence was completed. The tree transplantation project for the construction project on the 17th floor of the student apartment was completed. Completed the cable laying project for the large screen in front of the library on the anniversary day. The temporary adjustment project of the school anniversary party venue (playground) was completed.

Complete the waterproofing project on the roof of the comprehensive office building and the 8th floor of the family building; complete the maintenance and painting project on the third and fourth teaching floors; complete the maintenance and painting project on the corridor of the test building; complete the renovation project of 22 bathrooms in the test building; complete The renovation and renovation project of the laboratory of the School of Land Science and Technology; the renovation and renovation project of the laboratory of the School of Water Resources and Environment was completed; the maintenance and renovation project of the laboratory of the School of Materials Science and Engineering was completed; the renovation of the activity rooms on the 19th and 1A floors into freshmen dormitories was completed; Completed the maintenance and renovation project of the bathroom on the first floor of the teaching building; completed the maintenance and renovation project of the bathroom in the testing building; completed the maintenance project of the international student dormitory.

2. Purchase of furniture for student dormitories. According to the school's 2012 student dormitory desks and chairs procurement plan, a public tender was conducted to purchase 500 sets of bunk beds, 70 sets of eight-compartment iron cabinets, 50 iron bookshelves, 80 iron two-drawer tables, and iron square stools. 1500 pieces.

3. Real estate work. Completed the budget for housing subsidies for school faculty and staff; completed the payment of housing subsidies for faculty and staff of 7.2937 million yuan; completed the payment of transportation, property, and heating fees for faculty and staff living off campus, with a total amount of more than 3.8 million yuan. On behalf of the school, complete the supervision and management of the property service work of Guotian Property Company; make the property management work more humane and the property service more harmonious and stable.

4. Complete the reception teaching internship at Beidaihe and Zhoukoudian internship stations. Zhoukoudian Internship Station*** received 42,200 students and 1,900 teachers; Beidaihe Internship Station received 39,123 students and 3,202 teachers (including 17,486 students and 1,548 teachers from China University of Science and Technology (Beijing)); There are 188 person-days for foreign teachers and 1,414 person-days for students.

5. Power and energy saving work. Conscientiously implement the spirit of the national "Energy Conservation Law", the "Twelfth Five-Year Plan for Energy Conservation and Emission Reduction" and the "Implementation Plan for Energy and Water Conservation of China University of Geosciences (Beijing)"; passed the national and Beijing municipal departments' energy conservation requirements for schools Supervision and inspection of the work and special inspection, rectification of the problems detected; written 3 "China University of Geosciences (Beijing) Energy Utilization Status Report" and reported them to government agencies respectively; written "China University of Geosciences (Beijing) Water Supply Emergency Plan" ", replaced the health license; wrote the "China University of Geosciences (Beijing) Air Conditioning Management Regulations"; wrote the "Research Report on the School Power Supply Protection System" to evaluate the current status of the school's power supply, analyze the causes of high-voltage tripping, propose countermeasures, and actively organize Urgent repairs were carried out to basically ensure normal power supply; 41,000 energy-saving lamps were obtained with a total price of 10%; a funding application of 2.7 million yuan was applied to the Ministry of Housing and Urban-Rural Development for the construction of an energy consumption monitoring platform; and the underground pipeline map was continued to be improved based on the 2011 version. , in 2012, divided strong electricity into low voltage and high voltage; continued to complete the second and third phases of the "China University of Geosciences (Beijing) Weak Current Underground Network Project"; cleaned up the overhead open wires on the campus, and unplugged cement wires along the main road and on the west side of the stadium stands. More than 30 poles were installed; ensuring the smooth operation of elevators, reclaimed water, frequency conversion control systems, etc.; strengthening the management of secondary measuring instruments; repairing multiple overhead open wire short circuit accidents; completing the accounting and collection of water and electricity bills for operating units on campus work; completed the collection, statistics, compilation, and archiving of monthly, quarterly, and annual statistical reports and related data from Beijing Municipality and the Ministry of Education; cooperated with secondary units within the school to complete energy-related work; completed the relays in the power distribution room The team debugged the project and issued a "Test Report" to rectify the five major problems arising from the debugging; inspect and debug the lightning protection system of campus buildings; replace the main valve and valves in each door building in the first, second, and ninth buildings of senior high school; The tenth floor sewer renovation project; the water supply tank in the west district was replaced; the steam pipeline was repaired and the gas leaking problem was solved; the water source heat pump cleaning of the scientific research building was completed; and the water leakage problem on the 19th floor of the school was solved for many years.

6. The Logistics Department signs a service guarantee agreement with the Logistics Group. The Logistics Department and the Logistics Group have signed 14 service guarantee agreements with a total funding of 21.95 million yuan. In 2012, the logistics system completed the logistics support tasks assigned by the school with enthusiasm, quality, efficiency, civility and safety, and the management level and service quality were improved.

7. Improve the revision system regulations.

In accordance with the requirements for the use of school funds, the Finance Department of the Logistics Group has done a lot of work on the group's budget, revenue management, fund approval, financial supervision and other systems, improved the group's financial management process, and ensured the rational use of the group's funds. The Group Procurement Center has added new content such as "Purchasing Market Investigation Standards", "Purchasing Analysis System", and "Inventory Management System" to the existing procurement system, which has greatly improved the quality of purchased products while reducing procurement costs.

8. Various service tasks. The Logistics Group adheres to the "people-oriented" concept, aims to improve the satisfaction of teachers and students in the school, enhances service awareness, and performs various service tasks meticulously. The catering center successfully passed the joint inspection of the "Five Ministries and Commissions on Strengthening the Work of Canteens in Colleges and Universities" by the Municipal Education Commission, and submitted an application for standardized canteen acceptance to the Municipal Education Commission. The Greening and Sanitation Service Center has passed the preliminary acceptance of the standardized campus. The Transportation Service Department of the Logistics Group was rated as the "Advanced Unit for Traffic Safety in Haidian District University System". During the summer vacation, the logistics support work for the Zhoukoudian internship station was successfully completed. The mailroom received and distributed 26,095 items of various types of registered letters, express mail, remittances and parcels throughout the year, an increase of 3% over last year, without any errors. The Property Service Department collected approximately 2.75 million yuan in rent, water, and electricity bills, successfully completing various indicators set by the school; the Elevator Service Department was responsible for the normal operation of the school's 41 elevators.

10. Improve service capabilities. Improve your ability to handle emergencies and cooperate in completing large-scale school activities. Respond quickly to emergencies, sum up experience in a timely manner, form feedback, and further improve the management system. In the face of the "7.21" heavy rainstorm, all employees of the group worked together under the unified deployment of the school to ensure that people were left on duty at each position and responded immediately to minimize losses.

3. Neighborhood Committee Work

(1) School Work

1. Ensure the effect of comprehensive community management, increase management efforts, and prevent rebound. With the strong support of the relevant departments of the school and the Xueyuan Road Subdistrict Office, the neighborhood committee ensured the effectiveness of governance through strict prevention and taking turns on duty during holidays.

2. Strengthen the management of illegal construction and try every means to prevent the occurrence of new violations. In 2012, 18 illegal constructions under construction were stopped and demolished.

3. Stop more than 20 incidents of illegal decoration and demolition of load-bearing walls. If any individual refuses to be dissuaded, report it immediately to the logistics and real estate department, and jointly dissuade and stop it.

4. Most of the corridor doors and corridor windows in the old building were updated, and all the open-air loess floors in the community were hardened. This not only beautified the environment, but also added more than 50 parking spaces. Bit.

5. Assist the Infrastructure Department to deal with the problem of disturbance and disturbance caused by the project in Building 17 of the student apartment. We held many residents' symposiums and communication meetings, and through the introduction and explanation of the project, we won the support of the vast majority of residents for the project construction.

6. In order to create a campus celebration atmosphere and reduce the impact of the community environment on the campus celebration. With the support of the school and Xueyuan Road Street, the neighborhood committee carried out large-scale community environment and health management work. Cleaned up the garbage dead spots behind the 9th floor of the community and along the dripping edge of the old building for many years; assisted the Security Office in inspecting fire safety hazards in residential areas many times, and cooperated with the police station and urban management department to clean up 13 fire hazards in residential areas in the community; cleaned up fire hydrants including Occupied, the corridors were blocked, the fire escapes were occupied, and a large amount of flammable debris was accumulated in front of the house and other fire hazards; cooperated with the security office to prohibit dogs from entering the teaching area; carried out 3 centralized cleaning activities of small advertisements, and the main sections of the street The small advertisements were cleaned up before the school anniversary; the Haidian District Experimental No. 3 Primary School was contacted to whitewash its exterior walls to avoid having a negative impact on the school anniversary; large-scale environmental improvements were carried out in the family area before the school anniversary, and more than 30 places outside the building were cleaned up Accumulations and obstructions; centralized cleaning of more than 450 used bicycles in the community; emergency repairs, minor road repairs, more than 10 ground collapses and damage, emergency heavy rain rescue and emergency snow clearing work; on the day of the school anniversary, all social workers and 30 volunteers were arranged to Community patrols are on duty and key people are monitored throughout the day to prevent them from affecting the school celebration activities.

(2) Community Construction

The Xueyuan Road Sub-district Office supported more than 100,000 yuan to renovate the bicycle shed on the 26th floor of the Dependents, and supported 50,000 yuan to the 9th floor and the 10th east floor of the Dependents. The side was hardened, and 50,000 yuan was supported to repair the road at the intersection on the 18th floor. Create convenience dishes. According to rough statistics in 2012, more than 375,000 kilograms of various vegetables were sold. The prices are lower than those in nearby communities, providing convenience and benefits to faculty and staff. Establish a convenient dried fruit store and sell about 120,000 kilograms of fruits throughout the year. Agricultural and sideline products such as Chinese cabbage, sweet potatoes, honey, and rice are introduced seasonally to provide convenience and benefits to residents. The introduction of the garbage-for-vegetables and fruits project will play a certain role in the school's environmental protection and energy-saving work.

(3) Street work

The community cooperates with the Xueyuan Road Street Office to carry out a number of tasks for residents, involving party building, civil affairs, social security, population, family planning, women's federation, and disabled people's federation , comprehensive management, judicial polls, recruitment, culture and sports, health, fire protection, security, floating population, housing security, community services, petitions and other aspects.