Responsibilities of each post in the project department of the construction unit
1) Archive the "five certificates" of migrant workers in subcontractors.
2) Organize and participate in the education of safety regulations and civilized construction system of subcontractors entering the site, form meeting minutes and distribute them to subcontractors.
3) Do a good job of filing the records of labor personnel entering and leaving during construction.
4) According to the superior safety training and education plan, supervise and implement the participation of relevant personnel.
5) Be responsible for regularly publishing blackboard newspapers, posting safety slogans and other publicity work.
6) Supervise subcontractors to manage the electricity and gas safety of construction personnel in a timely and effective manner.
Post responsibility system of project economist
1) is responsible for the economic management of the project;
2) Participate in the technical disclosure meeting of the preliminary review of the project construction drawing;
3) Be responsible for the budget implementation and final accounts preparation of the project;
4) Responsible for the calculation of economic indicators and cost accounting of the project;
5) Apply statistical technology to control the budget and final accounts and cost of the project;
6) Complete other tasks assigned by the project manager.
Project manager's post responsibility system for safe production
1) The project manager is fully responsible for the safe production of the project;
2) Establish and improve the project safety management network, determine the safety management objectives, and organize the preparation of safety assurance plans;
3) according to the engineering characteristics, strengthen the control and management of subcontractors;
4) Conscientiously implement various safety production rules and regulations, define the safety production responsibilities of each management position of the project subject, and be responsible for checking the implementation of the safety production responsibility system of the project subject;
5) Organize the review and coordination of the safety system of the project department in time;
6) Implement the resource allocation of safety assurance plan;
7) According to the construction organization design, implement various safety technical measures, and send people to make safety technical disclosure for partial projects.
8) The special person shall be responsible for checking the certificates of special operators, and the new subcontractors entering the construction site shall be given targeted safety education to stop illegal operations.
9) When an industrial accident occurs, immediately organize rescue, protect the site, report it truthfully and quickly, participate in accident investigation and handling, and implement various rectification work in accordance with the principle of "four don't let go".
10) consciously accept the supervision and management of the superior safety production department.
Deputy Project Manager's Post Responsibility System for Safe Production
1) Coordinate major issues in the operation of the safety assurance system and organize safety production work meetings;
2) Organize managers to learn safety operation rules and safety rules and regulations on a regular basis;
3) Seriously implement the safety production plan and labor protection, and organize relevant personnel to carry out safety operation disclosure.
4) Organize regular safety inspections, and implement "three decisions" for hidden dangers found (rectification by personnel, rectification by measures and rectification by time);
5) Conduct regular safety education for all employees and organize safety month activities;
6) Hold a safety regular meeting system attended by subcontractors, coordinate the responsibilities and responsibilities of all parties in production safety, and report the current situation of production safety;
7) Report major accidents in time, carefully analyze the causes, put forward and implement improvement measures, and implement the principle of "four don't let go".
Post responsibility system for safety production of construction machinery controller
1) Traceability record and archive the machinery used in the construction site.
2) Supervise the mechanical operators of subcontractors to do a good job in daily mechanical maintenance and chassis protection, and actively contact for emergency repair when mechanical failure occurs.
3) Supervise the subcontractors to conduct safety disclosure and safety education for the mechanical operators and commanders of the derrick before entering the site.
4) Organize subcontractors to inspect the mechanical equipment on the construction site regularly, and rectify and review the hidden dangers and problems found.
Post responsibility system of production team leader of project department
1) according to the construction plan, organize the labor force to enter the site, and do a good job in the disclosure of team construction technology and safety technical measures.
2) Supervise and inspect the construction of team members according to the drawings, specifications and construction scheme.
3) Organize the team to carry out self-inspection, mutual inspection and handover inspection, and organize workers to make rectification in time when unqualified items are found, so as to ensure the quality of the team working face is up to standard.
4) Responsible for conveying the management contents of the project department and reporting the situation of the team, and conducting mediation in time.
5) Seriously abide by the safety laws and regulations and relevant safety production systems, and be responsible for the safety and health of this group of personnel in production.
6) Do a good job in safety activity day, hold a pre-shift and post-shift safety meeting, and conduct on-site team-level safety education for newly transferred workers.
7) Organize the employees of this class to learn the construction technology and safety laws and regulations, and check the implementation. Under any circumstances, it is not allowed to violate the rules, and it is not allowed to use machinery, electricity, shelves and other equipment without authorization.
8) Regularly check the safety production situation on the construction site, strengthen the safety self-inspection, solve problems in time when found, and take timely measures and report those that cannot be solved.
9) Make detailed records of industrial accidents and report them in time, and organize the whole group to analyze them carefully and put forward preventive measures. In case of heavy casualties, the site should be protected and reported to the project department supervisor immediately.
10) has the right to refuse illegal instructions to ensure the production safety of the team.
Post Responsibility System of Quality Engineer in Project Department
1) Seriously follow the construction quality standards and specifications, and do a good job in the quality management of the project site;
2) Check the construction quality of subcontractors and make quality records;
3) If it is found that the construction is not carried out according to the construction quality standards and norms, and there are hidden dangers of quality accidents, a general contracting notice shall be issued, and rectification shall be made within a time limit and reinspection shall be conducted. Have the right to decide to stop the construction and report it in time if there are serious hidden dangers of quality accidents and rectification cannot be made within a time limit;
4) Attend meetings on construction quality and various quality and safety inspections, and be responsible for business contact with local quality supervision departments;
5) Quality accidents should be reported according to the prescribed procedures, participate in the analysis of quality accidents, and participate in the handling and inspection of quality accidents and the implementation of remedial measures according to the principle of "four don't let go";
6) Complete other tasks assigned by the project manager.
Post responsibility system for safety production of materials personnel in the project department
1) Strictly control the quality of safety facilities and materials, and be responsible for checking the safety protection articles of qualified suppliers of subcontractors.
2) Be responsible for stacking the incoming materials according to the requirements of site capacity standardization, so as to eliminate potential accidents. Check and urge subcontractors to be clear in construction to ensure safe production and civilized construction on site.
3) The production safety guarantee document requires that the quality of safety facilities and accessories such as derrick, scaffold and safety net used on site be guaranteed, and that they be inspected and tested regularly, so as to urge subcontractors to update and replace unqualified and damaged products in time.
4) Strengthen the safety knowledge education for subcontractors and strictly implement the storage regulations for dangerous goods, flammable and explosive paints, acetylene and oxygen.
Project department security officer post responsibility system
1) Seriously implement the safety production laws and regulations, and do a good job in the publicity, education and management of safety production on the project site;
2) Conduct daily safety inspection on subcontractors and make daily safety production records. Stop illegal operations, issue a general contracting notice to potential accidents, rectify within a time limit and reinspect. In case of serious violation of safety operation regulations, have the right to decide to stop operation and report in time;
3) Attend relevant safety work meetings and various safety inspections, and be responsible for business contact with local safety supervision departments;
4) Conduct on-site management of subcontractors according to Shanghai's standardized management standards for construction site safety;
5) In case of casualty accident, immediately organize rescue, protect the site, and report according to the prescribed procedures;
6) Participate in accident investigation, and participate in accident handling and aftermath according to the principle of "four don't let go";
7) Complete other tasks assigned by the project manager.
Post responsibility system for project safety personnel in production safety.
1) Implement labor protection laws and regulations and do a good job in publicity, education and management of production safety.
2) Implement various safety technical measures in the safety assurance plan, and organize and participate in the acceptance of safety facilities, construction electricity and construction machinery.
3) Archive and spot check the necessary data of various safety supplies and mechanical equipment used on site.
4) Conduct safety and fire control inspection on subcontractors, and guide or assist production leaders to solve unsafe problems in production.
5) Participate in organizing fire safety activities and fire safety inspections to stop illegal operations. Issue an accident hidden danger rectification sheet, rectify and recheck it within a time limit, and have the right to decide random operation and report it in time if there are serious hidden dangers. In violation of labor protection and safety laws and regulations, persuasion and dissuasion are ineffective, and they have the right to report or report.
6) Supervise and urge relevant subcontractors to do a good job in safety technology education for new workers, personnel with special types of work, and personnel transferred to other posts, and keep personal safety files.
7) Supervise and inspect the implementation of safety technical measures in construction organization design.
8) Responsible for the safety production responsibility assessment of subcontractors.
9) Participate in the investigation, analysis and handling of casualty accidents. Do a good job in statistics, analysis, reporting and filing of safety accidents in accordance with the principle of "four pass".
The post responsibility system of the builder in the project department
1) Carefully prepare the production plan and construction scheme, and organize the implementation of construction technology, quality and safety technical measures.
2) Participate in the blue prints.the design, concealed engineering acceptance, technical review, design change visa, intermediate acceptance and completion settlement, etc. , and urge the filing of technical data.
3) Do a good job in the task disclosure and technical disclosure of the operation team, check the production cost and quality of finished products and semi-finished products such as concrete and mortar grading, and strive to reduce consumption.
4) According to the requirements of quality objectives and project progress, coordinate and organize the arrangement of labor force and the entry and exit of mechanical materials. When there is a conflict between quality and schedule, quality must be guaranteed.
5) Arrange production tasks through quality disclosure. After each working procedure is completed, the quality controller will check and accept it, and the next working procedure can be carried out only after it is qualified.
6) Carry out construction in strict accordance with the requirements of drawings and construction specifications, and conduct technical review in time.
7) Organize and implement the rectification of unqualified processes or repaired parts, and give information feedback.
Post responsibility system for safety production of construction personnel in the project department
1) According to the requirements of the safety assurance plan, implement the safety production rules and regulations, strengthen the safety management of on-site construction personnel, and control the whole process of the construction site.
2) Correctly handle the relationship between production and safety, and regularly organize on-site personnel to conduct safety inspection on the construction site every month. For the problems found out by superiors or problems found out, it is necessary to quickly implement rectification, achieve "three determinations" and eliminate hidden dangers of accidents.
3) According to the characteristics of this project, organize and participate in safety technical disclosure, and do a good job of filing disclosure records.
4) Supervise subcontractors to do a good job of acceptance and listing of various facilities and electrical machinery and equipment. It is forbidden to use facilities and equipment that have not been accepted or are unqualified, and supervision and inspection should be carried out on important facilities.
5) When naked flame is used, relevant examination and approval procedures shall be handled at different levels, and supervision and inspection shall be carried out during implementation.
6) Before construction, the subcontractors shall be educated to observe the rules and discipline, and those who observe the rules and discipline shall be praised. Those who violate the rules and regulations of safe operation should be criticized and educated in time. When necessary, the construction unit or individual who refuses to make corrections may be forced to stop operation or report to its superior for rectification.
10) When a major casualty accident occurs, immediately protect the scene of the accident, organize rescue, and report to the superior in time, and do a good job in accordance with the principle of "four don't let go".
- Related articles
- General Tie, don't lock the door. What should I do if I "prompt that the door has been pried open"?
- In order to ensure the leadership of the insurance coverage work of private enterprises, the urban areas have established leading groups for the expansion of insurance coverage for private enterprises
- A complete collection of banners and slogans for beauty salon opening
- Low-key and sweet, Tik Tok, who announced her love affair, praised the copy 70 times.
- What should the country do to develop the aerospace industry and build a powerful aerospace country?
- 2023 Zhuhai Xiangzhou Trade Union 400,000 New Year Voucher Collection Time+Method
- The slogan of the man of god
- Creative plan for Earth Hour activities
- What is the proper name of a real estate agent? What's the name of a good real estate company?
- How many books does Lei Feng University have in Hunan Province?