Joke Collection Website - News headlines - How to write flood control measures for buildings?

How to write flood control measures for buildings?

Flood control and flood fighting measures In order to do a good job in flood control in rainy season, ensure the safety of engineering construction and avoid the loss of personnel and property, the flood control and flood fighting work arrangement is as follows: 1. The overall goal of flood control is to follow the flood control policy of "safety first, constant vigilance, prevention first, and all-out rescue", establish the flood control concept of "prevention first, prevention is more important than robbery", implement the guiding ideology of "flood control by all staff, scientific flood control", earnestly implement the responsibility system for flood control, and ensure that the responsibilities are in place. Two. Working Principles The principle of "unified command, unified coordination, unified deployment, rapid response, scientific response and graded implementation" shall be implemented in flood control and emergency rescue work. Three, the rainy season protection measures are to provide rain gear for site construction personnel. In order to facilitate the construction work, rain gear should be two raincoats with clothes and trousers separated. During the construction in the rain period, the front-line construction workers must be given safety education, and all the construction personnel should be organized to disclose the construction organization measures in the rain period. On the construction site, the surface of the walkway should be provided with anti-skid strips and walkway railings to prevent people from slipping when walking in rainy days. Strengthen safety awareness education and safety production management, and prohibit construction workers from walking in non-accessible parts in rainy days. In rainy days, mechanical and electrical equipment should have reliable rainproof covering measures to prevent the equipment from being damaged by damp, leakage or even short circuit, which will affect the normal operation of the equipment. Check the power cord in time to prevent the damaged wire from leaking in a humid environment and endangering personal safety. Establishment of leading group for flood control: In order to ensure safe production in rainy season, implement flood control work, and place the responsibility on people, our unit has established leading group for flood control, established duty system for flood control cadres, and set up special flood control teams and rescue teams. In case of rainy weather, patrol roads to ensure smooth drainage, report any danger immediately and take corresponding measures in time. Construction machinery must be inspected every day, and when the groove is enough, a sufficient safe distance must be left from the edge of the groove, and a special person should be appointed to direct it; After the construction, the machinery should be parked at the designated place, and it is forbidden to park at the edge of the groove in rainy days. In view of the characteristics of rainy season in Baicheng area, special attention should be paid to flood control. On the premise of ensuring the smooth progress of the project, the construction quality should be strictly controlled to ensure that the flood control work is put in place in terms of ideology, organization and measures. During the construction period, you must listen to the weather forecast carefully every day and arrange the work for the next day. According to the characteristics of flood control work and the analysis of geographical environment, the project department finds out more specific and detailed flood control weak links and parts prone to water accumulation, and carries out preventive maintenance in advance. Set up flood control supervision posts for key flood control sections and parts, assign special personnel to watch around the clock, implement the inspection system before, during and after rain, and take effective measures to prevent and deal with problems immediately when found. In order to solve the drainage problem, drainage ditches are set on both sides of the culvert, which are connected with the existing rainwater open channel to discharge rainwater into the existing ditch.