Joke Collection Website - News headlines - What are the data of the landfill? Never touched it before. Thanks.

What are the data of the landfill? Never touched it before. Thanks.

massive earthwork excavation and local earthwork backfilling and rolling; The data of slope cutting and compaction should be evaluated and sorted according to the quality evaluation table of municipal engineering, and the data of geomembrane impervious membrane can be evaluated and sorted according to the quality evaluation table of water conservancy engineering.

the following example. . Please refer to!

Information of Asuwei Landfill

Asuwei Landfill in Beijing is the largest waste treatment plant in Beijing. It was originally located in all the virtues Township, Changping District, and now it has been expanded to Xiaotangshan Town, Changping District. It was built in 1986 and put into operation in 1994. It covers an area of 26 hectares, and then expanded to 6.4 hectares. The original designed landfill volume is 12 million cubic meters, with a service life of 17 years and a daily garbage disposal capacity of 2, tons. It undertakes all the domestic garbage disposal tasks in Dongcheng District, Xicheng District, Zhongnanhai, the State Council and Xiaotangshan, and serves more than 2 million people. But later, the daily garbage disposal reached 3,5 tons, including wheelie bins from Chaoyang District, Shunyi District and Changping District. The villagers even saw medical waste in this place where domestic waste should be buried.

Zhao Zhangyuan, a researcher in his 6s, retired from china environmental science Research Institute last year and is now a member of the expert group of the Environmental Assessment Center of the State Environmental Protection Administration. He once made a leak detection test at Asuwei landfill. "The main part of Asuwei landfill was originally built, with poor seepage resistance and severe leakage." Zhao Zhangyuan pointed out that once garbage such as batteries are decomposed, heavy metals and toxic organic substances that directly cause cancer will be released. Long-term leakage of a large number of highly toxic, toxic substances and various pathogens, viruses and other pollutants into the ground will make it difficult to clean up the pollution of groundwater. Living in a highly polluted environment for a long time will make it difficult for people to defend against the spread of epidemics.

Zhao Zhangyuan found that the groundwater in Zhang Fang village, 4 kilometers away from the southeast of Asuwei landfill, has also been polluted. According to this calculation, the groundwater within 2 square kilometers around Asuwei landfill has been polluted. Changping District is located in the northwest of Beijing, which is the upper reaches of groundwater in Beijing. Zhao Zhangyuan said that the landfill should not be located in that place. Professor Cheng Yexun of China Geo University said that there is a big problem in the site selection of Asuwei under Xiaotangshan. The terrain of Beijing is inclined from northwest to southeast, and the northwest is the upper reaches of groundwater. Asuwei is located in the upstream area.

Zhao Zhangyuan was entrusted by Beijing Municipal Administration Committee in 21 to investigate the leakage of Asuwei landfill. In the following year, the municipal government of Beijing began to control it, investing 17 million yuan to build a fence, enclosing the landfill and grouting the underground. He was not satisfied with this practice, and put forward opinions at the demonstration meeting, thinking that putting garbage in a leaky basin in this way can only slow down the side leakage and cannot solve the problem of basin bottom leakage. Experts attending the meeting thought that this issue was very important and should be demonstrated separately, but there was no news afterwards. (Economic Observer)

According to the report of the Economic Information Daily in 25, there have been several "high-disease villages" around the Asuwei landfill in Beijing, and the number of people suffering from cerebral thrombosis, diabetes, coronary heart disease and hypertension has increased significantly compared with before. Changping District Center for Disease Control and Prevention has inspected the air in Asuwei Village and found that the total number of bacterial colonies in this village has exceeded 6, per standard unit. The rate of children suffering from respiratory infection in the village is obviously higher than that in other areas.

liulitun landfill held a "public open day". On that day, hundreds of residents near the landfill came to protest and demanded that the construction of the waste incineration power plant be stopped, on the grounds that the waste incineration plant produced a colorless and odorless strong carcinogen dioxin.

Zhao Zhangyuan believes that the biggest problem of Liulitun waste incineration power plant project is the site selection: "The harm caused by waste incineration in the world has not reached the point of arbitrary control, so the site selection must be far away from the crowd." It is not just Liulitun waste incineration plant that has problems in site selection.

Zhao Zhangyuan believes that the urgent task at present is to find out all kinds of pollution sources of underground leakage as soon as possible and carry out targeted and reasonable disposal. Especially in the piedmont plain areas in the north and west of Beijing, as the environmentally sensitive areas protected by the capital, and in the upper reaches of many new residential areas, all landfill sites, oil pipelines and large infectious disease hospitals that are prone to leakage pollution should avoid this treasure land of the capital. (Beijing News)

On July 14th, 29, the Standing Committee of the Municipal People's Congress organized the seventh special investigation on the proposal of garbage disposal this year. Organize some members of the Standing Committee and deputies to the National People's Congress to investigate the Asuwei garbage disposal site in Changping District.

In the morning, the research team came to Asuwei garbage disposal site, and smelled a strong smell of garbage after entering the site. In this regard, the person in charge of the Beijing Municipal Management Committee said that the Asuwei garbage disposal site is now overloaded, with a large working surface, and the smell of garbage is difficult to control. At present, it is also actively sorting and reducing, and speeding up the construction of burning yards and composting yards.

Liang Guangsheng, chairman of Beijing Environmental Sanitation Group, said that Asuwei Waste Treatment Plant has planned three major systems: sanitary landfill, comprehensive garbage treatment and garbage incineration power generation, and the sanitary landfill system has been built and is being used. The comprehensive treatment plant will be completed and put into operation this year, and the incineration plant is undergoing preliminary work and will start construction at the end of the year.

after all the three systems are completed, the daily treatment capacity will reach 3,8 tons, which basically meets the demand. At the same time, the structure of garbage treatment will be improved, from 1% landfill to 31% incineration, 42% composting and 27% landfill.

Liang Guangsheng, Chairman of Environmental Sanitation Group, said that at present, Asuwei Landfill has a daily treatment capacity of 3,8 tons, which exceeds the designed treatment capacity of 1,8 tons, and the long-term overload operation has been overwhelmed. Zhou Zhengyu, deputy secretary general of the municipal government, said, "We plan to expand the control area with a radius of two kilometers beyond the 5-meter core area to absorb more garbage. The surrounding industrial structure should also be adjusted. "

in response to a suggestion made by a representative of the Municipal People's Congress to monitor the garbage dump in real time and publish data, Chen Yong, director of the Municipal Administration Committee, said that there is no technical problem in real-time monitoring and publishing the garbage dump, and the relevant data will be considered to be published to the public after the incineration plant is completed in the future. (Beijing Evening News, Beijing News, Jinghua Times)

On May 1th, 27, the biogas power plant of Asuwei landfill in Beijing was officially put into operation. The first phase of the power plant includes the biogas collection, power generation and grid-connected system, and two special biogas generating units are installed, with an installed capacity of 2,7 kilowatts, and the annual full-load power generation can reach 21 million kWh, which can supply the annual electricity consumption of 17, households in Beijing. With the increase of landfill waste, the gas production is increasing gradually. In the next few years, it is estimated that six units can be set up, and the total installed capacity will reach 8, kilowatts. (Beijing Daily)

Asuwei Waste Incineration Power Plant will start construction in Asuwei Village, Xiaotangshan Town, Changping District and all the virtues Village, baishan town before the end of 29, covering an area of 12 mu, and is expected to be completed in 215.

It is understood that Asuwei Waste Incineration Power Plant, as a phased project of Asuwei Waste Comprehensive Treatment Park, will burn 1,2 tons of waste every day and generate 15 million kWh of electricity every year, which can make the comprehensive utilization rate of waste resources in the park reach 7%. As the first large-scale garbage disposal center in this city that meets international sanitary standards, Asuwei Domestic Waste Comprehensive Disposal Park includes sanitary landfill, garbage composting, garbage incineration power generation and landfill gas power generation projects, which mainly undertakes the disposal of all domestic garbage in Dongcheng District, Xicheng District and Changping District and some domestic garbage in Chaoyang District, with a service area of about 1,8 square kilometers, a service population of about 3.5 million and an average daily garbage disposal of 4,5 tons. (Beijing Daily)

In order to solve the odor problem of landfills, the relevant person in charge of the Municipal Environmental Sanitation Group said on April 18, 29 that it would invite companies with technical capabilities to adopt new technologies to deodorize Asuwei Landfill, Anding Landfill and Beishenshu Landfill among the eight municipal landfills. It is understood that the Gaoantun garbage dump, which had a serious odor problem before, was overloaded. In order to solve the odor problem quickly, some of its garbage disposal tasks were transferred to two garbage dumps, Beishenshu and Asuwei. Because the two garbage dumps are far away from residential areas, the odor has not affected residents' lives, but there are still odor problems. (Jinghua Times)

In recent years, Beijing's economic construction is changing with each passing day, and people's living standards are improving year by year. However, the serious environmental pollution problem hidden behind the economic prosperity and the high incidence rate caused by it are becoming increasingly prominent.

Monitoring by Beijing Center for Disease Control shows that the incidence of hypertension, diabetes and malignant tumor in Beijing ranks first in China, and its high incidence is shocking. Modern medicine has found that 8% of human diseases are related to water. There are toxic substances in garbage, sewage, pesticides, petroleum and other wastes that are difficult to degrade, and it is easy to directly enter the food chain system through groundwater. When the animal and plant food or groundwater in the upper reaches of the food chain directly enters the human body, it will make the human body suffer from cancer.

In fact, the problem of groundwater pollution in Beijing is very serious at present. The research shows that the major polluters of groundwater are municipal landfills, gas stations and some industrial and agricultural wastewater. Polluted surface water will often leak underground. Landfills and gas stations are called "two cancers of the earth".

Tests have confirmed that several large landfills in Beijing have experienced obvious leakage. Some of them have caused groundwater pollution in the surrounding area of more than ten square kilometers to be undrinkable. The biggest problems are Asuwei landfill and Liulitun landfill located in the capital's high-quality groundwater recharge area, which directly threaten the health of the general public downstream. In some villages near the landfill, the number of people with high incidence has increased significantly. Villagers are afraid to drink groundwater, and some livestock who drink groundwater often have stillbirths. (Zhao Zhangyuan, researcher of china environmental science Research Institute)

Impact on surrounding villa projects: Asuwei landfill site has been converted into a permanent incineration power plant, which has a great impact on villas in the south and southeast direction because of the topography, rivers and groundwater trends, especially on Baoli Ridge, located in the long river Yushu, Dushang, Orange County and Vancouver Forest in Mafang. Because Niufangquan Village, just south of the garbage dump, has been polluted, 1, buildings will have some influence in the future. The soup HOUSE in the north is not far away, which may have an impact. If the leakage pollution is serious, the villas near Beiqijia Town will also be affected. Napa Valley is northeast and has a certain distance, so it is estimated that the impact is very small.

The disastrous consequences are: serious leakage and pollution to Wenyu River, which will affect dozens of downstream projects to varying degrees. (Focus Real Estate Network-Talk about Housing-Talk about the City-Wushuang Forum)

One of the solutions for Asuwei Waste Incineration Power Plant

It is reported that this project has applied for the "Clean Development Mechanism" project of the United Nations, trying to reduce carbon dioxide and control global greenhouse gas warming by using waste incineration power generation, and at the same time applying for compensation funds obtained from emission reduction in the United Nations, which has been approved by the National Development and Reform Commission. However, the requirements for applying for CDM projects are very strict and must be approved by local stakeholders. If we can get evidence to prove that the project cannot be approved by stakeholders and many people object, we will at least pay attention to it from this aspect. I hope we can work together to find a way.

If you think that the power plant should not be built in the upwind direction of the city, you can leave a message with a post. If the proportion of opposition is in the majority, I can take this post as evidence, and when the project is posted on the United Nations website, it will be used as the opposition of local residents' stakeholders to oppose the implementation of the project.

solicit opinions from everyone, preferably the owners who have already lived nearby. If you have any figures, photos, personal feelings and other things that can be used as actual evidence and personal opinions, please post a message, even if it needs to be translated into English, this matter will be done by me. Put forward a letter of objection when the project is posted on the United Nations website.

July 9, 29, bjhb Changping University Town Forum

Personally, I suggest that the focus of our work should be not to oppose the project itself, but to oppose the construction site of the project. It should be built far away from residential areas, especially not too close to densely populated areas like the university town, which is a place to cultivate the future pillars of the country. Do you want to let the poisonous gas poison all college students? Therefore, we can also put this news on the website of the school stationed in the university town. Together with the university, our opposition will be even greater.

Nature