Joke Collection Website - News headlines - Factory activity plan
Factory activity plan
Factory activity plan (5 general articles)
In order to ensure that activities are carried out with high quality and high level, it is often necessary to prepare a specific, detailed and highly targeted activity plan in advance. A plan is a plan that is specific, thorough, and highly operable in terms of the purpose, requirements, methods, methods, and progress of the activity. So what kind of activity plan is good? Below is the factory activity plan (5 general articles) that I have carefully compiled for your reference. I hope it can help friends in need.
Factory activity plan 1
In order to ensure safe production in summer and achieve the goal of a safe summer for employees, in line with the principle of people-oriented, caring and caring for employees, we provide quality inspection services for employees in high-temperature positions on the front line This plan is specially formulated to express the care, coolness and health of the leaders at the place.
Activity goal:
Ensure that no employee in a position suffers from heat stroke.
Scope of activities to deliver coolness:
Raw material inspection station, iron front There are 248 employees working in outdoor and high-temperature positions in 7 units including the inspection station, steelmaking inspection station, plate and coil inspection station, secondary rolling inspection station, production department maintenance team, and sample preparation center.
Refreshing gifts include:
Watermelon, sorbet, cooling oil, chamomile flowers, Huoxiang Zhengqi water, Rendan, drinks, etc.
Arrangements for cooling-off activities:
From June to August, depending on weather conditions, carry out cooling-off activities at high-temperature positions at least 1 to 2 times a week.
1. Staff from the Organization Department went to front-line high-temperature positions to provide cooling.
2. According to the number of employees in high-temperature positions, the special expenses for cooling-off activities will be allocated to each unit, and the leaders of each station office will organize the station staff to carry out daily cooling-off activities.
Specific requirements:
1. The refreshing activity is related to the safety and health of employees. Leaders of each unit must attach great importance to it and must have plans, arrangements, implementation, and summaries. , and earnestly implement the work of delivering cool things.
2. Each unit should establish a receipt account for cool items to ensure that cool items are distributed to employees in high-temperature positions. Every time an activity is carried out, it must be registered with the trade union.
3. The cool-off activity should be combined with production safety inspections to identify potential safety hazards in summer and implement timely rectifications.
4. Each unit should submit the arrangements for the cool-down activities before June 5th, and submit the report to the unit at the end of August for a summary of the cool-down activities. In early September, the union will reimburse related expenses by presenting purchase receipts for refreshing items. Factory activity plan 2
In order to actively respond to the national call for the xxth "Safety Production Month" activity, we actively implement the policies of the Party and State Council, the State Administration of Work Safety, provincial bureaus and municipal bureaus, and the Group Safety Committee on production safety. Guidelines and policies, independently implement the company's main responsibility for safety production; consolidate the company's own safety management work, improve safety management and safety engineering technology, create a good safety culture atmosphere, and formulate this plan based on the company's actual safety production work.
1. Overall requirements
Each branch factory and department shall draw up its own internal activity plan based on this plan. The content of the plan shall have clear division of labor, clear regulations, strong operability, and The situation feedback equipment and power department will be carried out for filing.
2. Activity theme
Comprehensively deepen the safety month activities, strengthen the safety foundation, and promote safety development.
3. Activity time
"Safety Production Month" activity time: June 1st to 30th.
4. Organizational structure
A "Safety Production Month" activity planning and promotion group was established. The members of the organization are as follows:
Team leader:
Deputy leader:
Group members:
5. Participating units
6. Main activity form and content
1. Activity start
Organize a mobilization meeting for the "Safety Month" activity.
The launching ceremony of the "Safety Month" activity was held in the form of a regular company-level safety meeting, with the participation of safety responsible persons and safety supervisors from each production unit. The spirit of the "Safety Month" activity was promoted and implemented at the meeting. Invite company leaders to give mobilization speeches, and invite the heads of each unit to speak. Each unit completed its internal launching ceremony from June 3rd to 4th.
2. Publicity and Mobilization
(1) Each unit holds a mobilization meeting for the “Safety Production Month Activities”. The leader of the unit presided over a "Safety Production Month" mobilization meeting, requiring all employees of the unit to participate, reading out the company's notice and arrangements for carrying out the "Safety Production Month", publicizing the purpose and significance of the "Safety Production Month", and raising all employees' awareness of carrying out the "Safety Production Month" The awareness of "Safety Production Month" kicked off the company's launch of "Safety Production Month".
(2) In order to create a strong atmosphere of safe production, ensure that the alarm bell of safe production always sounds, and make the safety culture deeply rooted in the hearts of the people. Use emails, broadcasts, bulletin boards, posters, banners, distribution of promotional materials, etc. for publicity. Post slogans or posters with the theme of "Safety Production Month" activities in eye-catching locations in the company's offices, canteens, and branch factory bulletin boards.
3. Safety Publicity Week
Carry out safety production accident warning education week (June 3-9). Each unit must organize and mobilize its unit to carry out warning education activities. It is necessary to carry out warning education activities by establishing warning education exhibition areas for companies, branches, and teams, holding accident cases and accident simulation education exhibitions (with training classrooms as exhibition halls), organizing viewings of warning education films, and organizing reflection discussions, etc., and conduct warning education activities on typical accidents. Conduct analysis, learn lessons from accidents, explain safety knowledge, strengthen safety awareness, and promote safety work.
4. Safety knowledge competition
Carry out safety knowledge competitions in each unit, focusing on strengthening employees' mastery of various safety knowledge and strengthening employees' application of safety knowledge.
5. "Safety for whom" prize-winning essay competition
Organize employees to study "Life First - Employee Safety Awareness Manual" so that employees can understand the importance of safety and understand " "Safety for whom", learn "I want safety", and make safety a habit of employees. We held a prize-winning essay competition called "Safety for Whom" to understand the importance of safety from the little things around us and appreciate the management's good intentions.
6. Special safety inspection
Organize special inspection activities (June 17th to June 21st). In order to implement the company's safety production policy, promptly discover unsafe conditions, correct unsafe behaviors, and make up for management deficiencies, safety inspections are carried out in a planned, organized and step-by-step manner, and leaders of each unit lead teams to carry out special inspection activities.
7. Industrial occupational health and safety road show
Cooperate with 3M, a global supplier of personal safety protection products, to carry out occupational health and health technical communication and exchanges with safety managers, and develop personal protection plans. Promote the importance of occupational health through on-site consultation, occupational health mini-classes and other methods to strengthen employees' attention to occupational health.
8. Emergency Drill Week
All business units will carry out personal injury emergency plan drills from June 17th to 23rd. By organizing comprehensive plan, professional plan, and on-site disposal plan drills, we test the actual combat capabilities of the emergency rescue plan, find loopholes in the plan, analyze existing problems, revise the plan in a timely manner, improve the emergency system, improve the reliability, pertinence and operability of the plan, and increase Emergency response should be scientific, timely and timely. Strengthen emergency infrastructure construction, enhance emergency awareness, master key points of response, and improve scientific rescue and emergency rescue capabilities. It is necessary to combine drill activities with strengthening the safety knowledge education and emergency rescue training of employees, enhance the safety awareness of employees, and improve the ability of employees to prevent, escape, avoid, self-rescue, and mutual rescue.
The factory’s activity plan 3
According to the spirit of the new cigarette factory documents, the Infrastructure and Technical Reform Department follows the requirements of the factory’s “Two Committees” and is guided by Deng Xiaoping Theory and the important thinking of “Three Represents” to fully implement The "Safety Production Law" is the main line, adhering to the policy of "safety first, prevention first". In order to further improve the safety awareness and prevention capabilities of all personnel, plug safety management loopholes, and eliminate various accident hazards, we have formulated the "Safety Production Law" "Production Month" activity plan, self-examination and rectification of key fire prevention and theft prevention parts, inspection and supervision of implementation. After a month of activities, employees' safety awareness has been improved, and the expected purpose of the activity has been basically achieved.
1. Strengthen organizational leadership
In order to ensure the smooth and effective conduct of the activities, a safe production month activity leadership group was established, with the director as the group leader, and the members include party group leaders, section-level leaders personnel, etc., to comprehensively organize the entire activity and implement it on schedule to ensure the effectiveness of the activity.
2. Implement countermeasures and strengthen safety responsibilities
1. Strengthen learning and improve safety awareness and prevention capabilities. Utilizing the regular office meetings every Thursday, all staff were organized to study the spirit of relevant documents of the factory, and study the "Work Safety Law of the People's Republic of China", the "Fire Protection Law of the People's Republic of China" and the Ministry of Public Security No. Legal knowledge and industry-related safety regulations such as Order No. 61, "Henan Province Fire Protection Regulations" and "Henan Province Tobacco Industry Safety Production Responsibility System". Through learning, everyone's awareness of the importance of safety work has been further improved, and each department member is required to use their own practical actions to do a good job in safety work in their own position and in their own department.
2. Conduct self-inspection and rectification of key fire and theft prevention parts (containers), and combine the equipment and materials stored in the containers after technical transformation with the factory equipment department for inventory and transfer. At the same time, rectification measures are formulated for existing problems in safety management, and inspections are organized weekly to supervise the implementation of rectifications.
3. In light of the current severe situation of SARS prevention and control, all staff in the department actively create an atmosphere of "paying attention to safety and caring for life", and closely integrate the study and implementation of the "Work Safety Law" with the implementation of relevant rules and regulations on production safety Together, we will organically combine the safety production month publicity and education activities with the current SARS prevention and control work. Through various forms, we will improve the legal concept of safety production among all employees, proactively prevent, and put safety production work in a prominent position. Increase the publicity and education of safety laws among all employees, improve the safety cultural quality of all employees, implement basic safety management, and ensure the smooth progress of production and operation.
4. Actively carry out the "I offer a strategy for safety" activity to collect good opinions and suggestions on safety work from department employees. All employees also participated in the collection activities of safety mottos, aphorisms and riddles organized by the Security Department. Publish relevant safety knowledge and learn through the LAN.
5. Organize all employees to conduct a comprehensive inspection of the production operating environment to eliminate unsafe factors; pay close attention to vehicle safety management. Organize drivers to carefully study the "Henan Tobacco Industry Motor Vehicle Driver Work Standards", "Henan Tobacco Industry Motor Vehicle Inspection Standards", and "Henan Tobacco Industry Motor Vehicle Driver Assessment Standards and Assessment Methods". Focus on inspecting the operating procedures of forklifts that are closely related to this department to eliminate hidden dangers, eliminate illegal behaviors, eliminate paralyzing thoughts, and ensure operating standards.
Through the above-mentioned safety production month activities, the managers of the entire department have further strengthened their safety awareness and effectively prevented the occurrence of various accidents, laying a good foundation for our department to ensure that safety work meets standards throughout the year. Base. Factory activity plan 4
1. Purpose
In order to further enhance the awareness of fire safety at construction sites, strengthen the effective construction of safe construction sites, and enable everyone to master fire prevention knowledge and use fire protection accurately. equipment, improve the ability to deal with sudden fire incidents, test the feasibility of the safety drill emergency plan compiled by our project department, provide valuable practical experience for future preparation and update of emergency plans, provide reference for the actual operation of many emergency plans, and make safety management Work is taken to the next level.
2. Drill time
Drill preparatory meeting at 7 pm on June 3, 20xx (Project Department Conference Room)
Morning of June 5, 20xx The simulation drill starts at 10 o'clock
3. Brief description of hazard sources
The construction content of this project includes bridges, tunnels, and roadbed projects. The construction site uses a lot of electrical equipment and lighting equipment, and there are many field operations. Fire accidents can easily occur in forests, carpentry construction sites, project departments and living areas of various work areas, smoking in field operations, irregular oil tanks, warehouse management, power distribution rooms, aging power lines, and electrical equipment that does not meet regulatory requirements.
4. Participating personnel
Industry agents and general director offices, project department employees, and construction personnel in each work area.
5. Exercise organization structure
(1) Leadership group
(1) Commander-in-chief:
Responsibilities: Make decisions, Command and comprehensively coordinate the deployment of pre-plan drills, and explain the drill procedures and significance.
(2) Deputy Commander-in-Chief:
Responsibilities: Be a good consultant and be responsible for collecting relevant information, such as: cause of fire, location of fire source, burning materials and their properties, and surrounding conditions , the situation of the fire unit (distribution of combustibles, dangerous materials, etc.), etc., coordinate the operations between the groups, direct the deployment of the fire-fighting team, and remind the fire-fighting team of precautions.
(3) Members:
Responsibilities: Assist the commander-in-chief and deputy commander-in-chief in their work, be responsible for the organization of participants in the unit and assume the responsibilities of relevant group leaders.
(2) Fire-fighting team
Team leader:
Members:
Responsibilities:
①Learn and Master the use of commonly used fire-fighting equipment, such as: various types of fire hydrants, fire extinguishers, hoses, water guns, etc.;
②Learn and master the methods and skills for extinguishing solid, gas and liquid fires. (Each person prepares a fire extinguisher) Factory activity plan 5
The purpose of the fire drill is to test the ability of company employees and voluntary fire emergency organizations to respond to fires, to assess the skills and effectiveness of daily firefighting training and education, and to improve employees’ fire-fighting and Evacuation, self-rescue capabilities, and fire scene organization, coordination, and command capabilities of managers enable employees to be trained and educated during drills, further enhance fire safety awareness, and enable the company to better implement the policy of putting prevention first and combining prevention and firefighting .
1. Fire drill content:
1. Initial fire fighting, control, fire scene coordination and command, and material transfer drills;
2. Fire scene evacuation guidance and casualty rescue drills;
3. Fire scene warning and coordination with fire squadron drills;
4. On-site fire-fighting drills with fire-extinguishing equipment;
5. Fire accident handling education and exercise summary.
2. Fire simulation settings
At 8:10 a.m. on xx, xx, 20xx, a worker in the packaging department on the second floor of the company accidentally operated a circuit due to improper operation while working in the packaging department. A fire broke out and spread, igniting flammable materials illegally stacked in the workshop. The finished products were illegally blocked, and the fire escape was blocked. Three people were trapped in the fire scene. The company launched an emergency plan to organize fire-fighting and self-rescue and called 119 to put out the fire.
3. Division of organizational, command and participation in the exercise
1. Commander-in-Chief: xxx Deputy Commander-in-Chief: xxx, xxx
2. Technical guidance for the exercise : Qingsong Aogu
3. Participating organizations and their members
A. Fire-fighting action team (i.e., the company’s first-level Italian fire brigade)
Team leader: xxx team members: Pu xx, Yang xxx, Kuang xxx, Zhang xx, Peng xxx, Xiao xxx, Zhu xxx
B., evacuation guidance team
Team leader: Du xx team Members: Zhang xxx,
C. Communication team
Team leader: Zhang xxx Team members: Zhu xx, Xia xx
D. Medical rescue team
Team leader: xx Team members: Wen xx, Cheng xx,
E. Water and electricity security team
Team leader: Wang xx Team members: Wang xx
p>
F. Security Team
Team leader: Li xx (security squad leader)
Team member: Zhu xx
G. Camera crew : Chen xx, Liu xx, Yang xx
4. Participants: about 1,500 employees on duty in the company and workshop
5. Actors
The injured 2 people 2, infiltrate 2 people
4. Start and end time of the exercise
The fire emergency plan will start at 8:05 am on xx, xx, 20xx by broadcasting the alarm bell or whistle signal. It ended with Commander-in-Chief Zhang xx’s concluding remarks. The duration is planned to be 50 minutes.
5. Preparation for the exercise
1. Convene a meeting to modify and confirm this exercise plan and clarify the division of responsibilities.
2. Equipment preparation: 1 megaphone, signs for the gathering points of each department, two large iron barrels, diesel, wood, a torch, 10 cans of dry powder fire extinguishers, a fire hose, fire protection equipment A water gun.
3. Prepare employee safety education speeches based on the causes, responsibilities and lessons learned from this simulated fire accident.
4. Prepare a summary speech for the exercise.
6. Drill procedures and drill points
1. Initial fire information notification and fire control drill
2. If a fire breaks out in the packaging department and the fire spreads, Illegal stacking of items in the workshop was set on fire.
(1) Ring the alarm bell and broadcast the alarm;
(2) Report to the superior (general commander);
(3) Notify the relevant person in charge .
3. The commander-in-chief went to the scene to inspect the fire situation
(1) Notify the entire factory of the fire-fighting situation;
(2) Notify the company’s first-level fire-fighting action team Rush to the scene quickly and implement initial fire fighting;
(3) Organize the rush transportation of important materials and open evacuation channels;
4. After the safety director arrives at the scene:
(1) China Unicom’s water and electricity support team determines the scope of the power outage and completes water and electricity protection;
(2) Checks and decides to close relevant windows or doors;
(3) Understand the cause of the fire and provide solutions for the accident Investigate and process original evidence.
(3) Issue instructions to relevant workshop volunteer firefighters to bring firefighting equipment to reinforce the fire scene.
6. Security Squad Leader
(1) After receiving the instructions, simulate the alarm to the Longgang Fire Squadron;
(2) Instruct the security team to strengthen the factory area and factory gates Warning order;
Requirements: communication should be smooth and timely, instructions should be conveyed clearly, personnel should arrive at the scene nervously and quickly, and the exercise attitude should be serious and realistic.
7. Initial Fire Fighting Drill
1. The fire-fighting operation team quickly rushed to the scene with fire-fighting equipment. At the same time, it brought the fire-fighting equipment of the workshop to the scene, connected the hoses and water guns, and When simulating fire fighting, be careful not to open the water valve, pull out the fire extinguisher seal and safety pin, and do not turn on the handwheel. It is only a simulation action.
2. Volunteer firefighters of the fire department: participate in fire fighting and rescue and transfer materials.
3. The remaining workshop-level volunteer firefighters: carry the fire-fighting equipment of their own workshop to reinforce the fire-fighting battle and participate in the rescue and transfer of materials.
4. Water and electricity support team: Check the power supply at the fire site, cut off power in different areas, start the emergency generator, ensure on-site water supply, and check whether emergency lighting and evacuation lights are normal.
Requirements: All personnel should arrive at the scene quickly, water guns and water hoses should be connected quickly and standardly, more than 2 water hoses should be connected, fire extinguishers should be transported safely and without damage, no personnel should be injured, and supplies should be transported quickly Tense, orderly and efficient, with realistic on-site actions, serious attitude, and obeying orders. After the exercise, the equipment was completely restored to its original position.
8. Fire evacuation guidance and casualty rescue drills
1. Du xx, the leader of the evacuation guidance team, directed the team members to be responsible for the evacuation of personnel at the safety exits on both sides of the second floor of the packaging department. According to Define routes and guide people to escape in an orderly manner from designated safety exits to avoid crowding and falls. Guide personnel to the designated safe area in the shortest possible time; and report to the commander-in-chief in a timely manner.
2. Employees were evacuated according to instructions to the company compound and lined up to count the number of people
3. Leave 20 people in the unit where the fire is located. After the employees are evacuated, 10 people will simulate the smoke of the fire. Evacuate and evacuate in a low profile; 10 people cover their mouths and noses with wet towels, paper towels and other items and evacuate from the fire scene in a low profile, then line up and return to the original unit. Requirement: Let all employees observe the evacuation and self-rescue process.
4. Fire rescue drill (temporary setting on site for 2 wounded people): Five minutes after the drill starts, the medical rescue team will take the 2 wounded people to a safe location at the location designated by the evacuation team leader for emergency rescue treatment. (Wound hemostasis, burn care, etc.),
5. Key points of the drill:
(1) Employees must turn off the power of their equipment before evacuation;
( 2) Close the window as close as possible to employees near the window before evacuating;
(3) Make sure the fire door is closed;
(4) The general commander organizes on-site cadres to evacuate the evacuated employees Line up the units and conduct inventory to ensure that all personnel are present and to find out who is trapped in the fire scene and waiting for rescue.
9. Fire scene alert
1. Fire scene alert drill
After receiving the instruction, the security team leader immediately strengthens the safety alert at the fire scene and factory area to prevent anyone from Taking advantage of the situation, people flowed backwards. At the same time, officers are dispatched to patrol along the factory wall, strictly control the entry and exit of personnel and vehicles at the factory gate, and strengthen police force at key targets and locations in the factory. (After the fire broke out, people and vehicles simulating sneaking in and out of illegal activities began to take action to check whether the security guards could find and capture them)
2. Re-simulate the 119 alarm
After the employees were evacuated After the assembly was completed, the commander-in-chief once again issued an instruction to call 119 to the fire-fighting team leader, and then the security team members used a megaphone to simulate the content of the alarm to the employees, with the purpose of allowing employees to master the methods and key points of the alarm.
Alarm points: unit, location, location, emergency rescue requirements, time of fire, floor, burning materials, fire intensity and control conditions; whether there are flammable and explosive dangerous goods, personnel evacuation, casualties, victims Difficulty situation, where is someone to respond to the fire truck, contact number, reporting person.
Different people can be arranged to repeat the alarm content 2-3 times to deepen the impression of the participants.
10. On-site fire-fighting drill with fire-fighting equipment: After the personnel are assembled, the actual fire-fighting drill is announced to begin.
1. Arrange the fire scene and complete the preparation work while counting the number of people in each department.
2. First explain the use, decomposition and precautions of dry powder fire extinguishers.
3. Fire-fighting operations: Start the fire-fighting drill after hearing the commander’s order to put out the fire.
(1) Volunteer firefighters take turns putting out the fire with dry powder fire extinguishers.
(2) Fire hydrant fire extinguishing: Volunteer firefighters use outdoor fire hydrants to connect water hoses and water guns to extinguish the fire.
Requirements:
(1) Make simulated movements first, then perform actual combat movements, and make correct and decisive movements.
(2) Let ordinary employees come up to experience the operation of the fire extinguisher and explain it.
(3) Master the wind direction and control the smoke, fog and water flow on site.
(4) Use fire extinguishers that are about to expire. After opening, the fire extinguisher should be used repeatedly to exhaust the agent to save equipment.
11. Summary of Fire Accident Education and Drills
Fire Accident Education: The commander-in-chief shall preach to all employees.
(1) The cause of the fire, property damage and casualties.
(2) Lessons learned from this fire and the consequences of violating rules and disciplines.
(3) The reason why the fire was controlled and extinguished, and praise the hard work and cooperation of each action team.
(4) Announce the formation of an accident investigation team to further identify the causes, implement responsibilities, handle relevant responsibilities, and further improve firefighting work.
- Previous article:Modern flower market in flower market
- Next article:Kindergarten 61 slogan middle class
- Related articles
- On the Persuading Work of Interpol's Overseas Action from the Method and Effect
- Blood pressure is relatively high at ordinary times. What methods can reduce blood pressure very well?
- What are the bar slogans?
- Banner slogan of Paris fans
- Yang Mi became the global spokesperson of realme. What other products has she endorsed?
- I have wine and food. What is the next sentence?
- What are the wedding photography skills? Capture Xiaomei with 10 details.
- Training instructor’s opening lines
- Is there a company that integrates the design, equipment and construction of the anti-drug science and technology museum?
- What causes the repeated ban on carrying passengers in tourist areas?