Special scheme for safe and civilized construction

Special scheme for safe and civilized construction

In order to effectively ensure the level and quality of things or work, it is often necessary to prepare a specific, detailed and targeted plan in advance. A plan is a written plan, which is the detailed rules and steps to implement specific actions. What are the format and requirements of the scheme? The following is the special plan for safe and civilized construction I collected, hoping to help you.

I. Safety guarantee measures

First, establish and improve the safety management system:

Set up a construction safety team with the project manager as the team leader, be fully responsible for the education and management of safety construction, and form a construction safety guarantee system from the project manager to the team. Establish a safety responsibility system and implement the principle that production and safety responsibilities are implemented to people. Regularly educate and study the construction management personnel on safety regulations and safety production technical knowledge, and educate and study the employees on safety production regulations and safety technical regulations.

During construction, the safety operation procedures and various safety regulations shall be seriously implemented, and illegal operation and illegal command are strictly prohibited.

Establish a safety facility acceptance system.

Establish a safety inspection system, combine regular routine inspection with irregular professional inspection, continuously improve and strengthen employees' safety awareness through safety inspection activities, implement various safety inspection systems and safety measures, and timely discover and eliminate potential safety accidents.

Main safety measures:

1, while arranging the construction task, safety disclosure must be made, and all safety disclosure must have written materials and the signature of the handover person.

2, adhere to the leadership safety duty system, the project set up a full-time security officer, each operation team set up a part-time security officer, strengthen the supervision and inspection of on-site production safety.

3, make full use of protection to strengthen the management of safe electricity use, the site adopts three-phase five-wire system, and specifies the construction organization design that conforms to the site safe electricity use, and sets up protective facilities. All kinds of power lines, switch boxes and mechanical equipment should be safe and reliable.

4, homework at night should have enough lighting.

5, in case of heavy fog, more than six winds are not allowed to engage in open-air construction work.

6, enter the construction site must wear a helmet.

7. Strengthen publicity and education on production safety, and set up eye-catching safety warning signs on site.

8, adhere to the task must pay safety measures and requirements, often organize relevant personnel to check the situation of production safety, found that the problem is solved in time. To improve the intact rate of on-site mechanical equipment, the actual performance must be reliable, and special personnel should be appointed for regular maintenance.

Second, production safety measures

1, before construction, organize all construction personnel to make safety technical disclosure, learn relevant safety rules and regulations and safety operation procedures, and hang them on various mechanical equipment.

2. Abide by the on-site safety discipline, wear safety helmet when entering the site, use labor protection articles correctly, and strictly abide by the "six disciplines of safety production". New employees who have not received three-level safety education are not allowed to take up their posts.

3. All kinds of electrical equipment have safe and reliable grounding and lightning protection devices.

Idle people are forbidden to play with electrical appliances. Idle people are forbidden to enter the hoisting area. No one is allowed to stand under the telephone pole. Operators must focus on safe lifting.

5, construction personnel should be familiar with the safety operation procedures, it is forbidden to drink and operate.

6, special personnel must go through professional training examination, show certificates.

7. Strictly abide by the relevant national laws and regulations on safety protection, strengthen safety education, check at different levels, and strictly implement the principle of "four passes" to prevent accidents.

8, pile frame, more than 2m aerial work should be equipped with safety protection articles such as seat belts.

9, wire rope, pulley, high-pressure slurry conveying pipe and all kinds of equipment should be regularly maintained, found unsafe hidden danger timely replacement or take effective safety measures.

10, the subgrade under the pile driver shall be compacted, the sleepers shall be laid flat and stable, and the pile shall not exceed two layers. When more than two floors are used, the pile driver should be piled in pound shape.

1 1. In case of strong wind and heavy rain, the pile driver construction should be suspended and effective preventive measures should be taken. When the frame turns, there should be a special person to command, observe the four corners, and add a double protective sleeper pad. It is generally forbidden to turn at night.

12. Lighting should be set for night construction to ensure normal and safe construction.

13. Operators of mortar table must wear dust-proof protective articles to avoid dust adsorption on the skin.

14, the on-site safety officer shall check the safe operation at any time, point out the problems in time when found, and have the right to suspend the construction when necessary, and study and solve them in time.

Third, electricity safety measures

1, where it touches or is close to the charged body, insulation protection and safe distance should be adopted, and electric equipment such as welding machine should be used after acceptance and listing.

2. The electric box should be equipped with double doors, locks and pins, and have a unified number and mandatory signs. The main and sub-distribution boxes shall be equipped with leakage protection devices, and the electric box shall be waterproof and complete with locks.

3. Advanced power box must be pushed by big circuit breaker to be connected.

4. Power supply, lighting and welding sockets must be clearly separated.

5. All mobile appliances and lighting lamps used on site should use light rubber wires, and plastic rubber wires are not allowed.

6. Regularly test the grounding resistance of the electrical box and the resistance of the mobile equipment.

Second, the safety production management system

Third, the civilized construction measures

The quality of civilized construction on the construction site is directly related to the corporate image. Therefore, civilized construction management occupies a considerable proportion in project management, and civilized construction management is the concrete embodiment of corporate culture, so it is necessary to formulate corresponding specific measures for civilized construction on site. Standardized management shall be implemented, with uniform data management and consistent standards, from employees' dressing, listing, words and deeds to site layout. Really reflect the corporate image and corporate culture.

Be good at accepting the specific requirements of the owner and integrating with the requirements of our company. Make our company more dynamic and creative.

Seriously abide by Party A's rules, regulations and management methods, as long as it is conducive to corporate image, civilized construction on site, cooperation between Party A and Party B and smooth construction. And put this concept into the minds and thoughts of every manager and every construction worker.

There will be a special person to manage the construction site, plan the responsibility area and responsible person, and truly put the responsibility into people.

Establish a perfect civilized construction management system, including material management system and living area management system. , and earnestly implement the inspection in the implementation process, and implement a strict reward and punishment system.

There must be "five certificates and one drawing": namely, the project overview card, the list of management personnel and the supervision telephone card, the fire control (fire prevention responsibility) card, the safety production card, the civilized construction card and the general construction plan. All kinds of signs and slogans are complete and elegant.