Cast-in-place terrazzo floor practice?
(1) Ash cake and screed: plastered with cement mortar on the same layer.
⑵ Brush plain cement slurry combination layer: cement mortar plastering on the same layer.
(3) Spread cement mortar screed-coat: The screed-coat shall be made of 1: 3 hard cement mortar, which shall be leveled first, then leveled with a ruler according to the screed, and then leveled and compacted with a wood trowel to make the surface smooth and dense and keep rough. After the leveling layer is plastered, water it for at least one day the next day.
2. Block mosaic
(1) After a day's leveling layer maintenance, vertical and horizontal or pattern chalk lines will pop up on the leveling layer according to the design requirements, and then cut strips according to the chalk lines.
⑵ Brush the lower part of the frame with pure cement slurry into a splayed angle, embed the long seat firmly (at an angle of about 30 degrees with the leveling layer), and bury the iron wire worn by the copper bar. The application height of pure cement slurry is 3 ~ 5 mm lower than that of grid strip. Grille bars shall be embedded firmly, with tight joints and top surfaces on the same plane, and straightness shall be checked through lines.
(3) After framing, water curing shall be started every 12 hour, and the curing shall last for at least two days.
3. Wipe the stone slurry surface
Cement slurry must be measured in strict accordance with the mixture ratio. Color terrazzo should first dry mix white cement and pigment repeatedly according to the mixture ratio, and after mixing, it should be carefully screened for many times, so that the pigment can be evenly mixed in white cement, and the reserve of slurry filling can be adjusted. Finally, it should be evenly mixed with stone rice according to the proportion, and stirred with water.
polish
(1) Mechanical grinders should be used for large-scale construction, and small-scale portable grinders can be used for grinding small areas and corners. When mechanical grinding is not available locally, manual grinding can be used. Grind before grinding. If the stone particles are not loose after grinding, grinding can be started. In general, grinding time is related to temperature and cement grade.
⑵ The polishing operation should adopt the method of "two slurries and three grinds", that is, the whole polishing process is divided into three polishing and two slurry filling.
- Related articles
- 6 1 touching wedding wishes to the best girlfriends.
- Broadcast host: three minutes to bring your own manuscript (short story, news)
- What is the legendary license plate like?
- Who knows the details of this popular online beauty for many years?
- The article's fitness addiction is getting better and better, and so is Ma Yili's personal trainer. Why?
- Comprehensive learning. (4 points) The colorful flower season and the vibrant youth. Youth is the most brilliant movement in the symphony of life. Me in the rainy season
- Reminder for real-name reservations for admission to Longtan West Lake Park in Beijing from November 17th
- Where does Neijiang No.6 Middle School rank in Sichuan?
- What are the eight words that wish the leadership a smooth new job?
- Essay describing school surrounding environment