Shaanxi Province Civilized Construction Site (Housing Construction Project) Evaluation Form

Part One Construction Site Management and Environmental Protection Form 1-1

1 Qualification Certificates and Construction Organizational design 1, construction license 2, qualification certificate 3, construction organization design 4, employment certificate ※⑴ No points will be awarded for no construction license or start-up report ※⑵ No points for the general and subcontracting units without qualifications or work safety licenses, the project No points will be awarded if the manager does not have a qualification certificate or a safety assessment certificate. ※⑶ No points will be awarded if the general contractor subcontracts the project to someone who does not have the corresponding qualifications. ※※※※⑷ The construction organization design and special plan are not approved, reviewed and signed in accordance with regulations, and the special plan of a highly dangerous project is not No points will be awarded if there is no demonstration; (5) 5 points will be deducted if the construction organization design or special plan cannot guide the construction; 2 points will be deducted for failure to conscientiously implement the construction organization design; (6) Each of the construction personnel, quality personnel, data personnel, safety personnel, etc. will be missing. 2 points will be deducted for the job certificate

2 Fences 1. Washing equipment 2. The construction site fence is strong and stable, clean and beautiful 3. The gate is made to standard, strong and beautiful 4. The guard system is sound and implemented seriously 5. The unit brand is clear Specifications ※⑴ No points will be awarded if there is no flushing equipment; ⑵ 8 points will be deducted if the flushing equipment does not meet the water saving and environmental protection requirements; ⑶ 5 points will be deducted if the height of the fence does not meet the regulations, is not strong, untidy, discontinuous, and has subsidence and cracks; 4. The gate is not standardized. , 5 points will be deducted for stereotypes, 2 points will be deducted for rough production, unstable, and no corporate logo. ⑸ 2 points will be deducted for each unsound guard system, the guard did not perform his duties, and registration was not established. ⑹ 2 points will be deducted for each unit brand that is rough and untidy.

3 Site appearance: 1. The road on site is hardened, solid and flat 2. The drainage system is smooth 3. Components, materials and facility materials are classified and stacked neatly

4. The plane layout is reasonable 5 , Make sure the site is clean after the construction is completed 6. The floor material pile does not exceed the standard ※⑴ No points will be awarded if the main road on the site is not hardened, and 5 points will be deducted for other sites that are not greened or solidified. ⑵ 5 points will be deducted for unreasonable drainage ditch settings, and the trench is not hardened. 2 points will be deducted for each block of traffic; (3) components, materials, and facility materials are not stacked in categories, and 5 points will be deducted for cement or other dusty materials that are not closed and stored; (4) the sand and stone sites are not hardened, the sand and stone are not stacked into squares, and the steel materials are not stacked. 5 points will be deducted for supports and cushions; 5 points will be deducted for each material without signs such as variety, specification, origin, etc.; 2 points will be deducted for each construction; 5 points will be deducted if the construction site is not cleared after completion; 5 points will be deducted for chaotic stacking of materials and poor sanitation; 2 points will be deducted for poor materials; 2 points will be deducted for poor materials. 8 points will be deducted for each place where the concentrated stacking of materials on the construction floor exceeds the standard, 5 points will be deducted for not placing the floor materials in a reasonable manner, 2 points will be deducted for not cleaning up in time ⑻ 5 points will be deducted for not dividing the hoisting area Shaanxi Province Civilized Construction Site (Housing Construction Project) Evaluation Table

Part 1 Construction Site Management and Environmental Protection Table 1-2

4 Signage and safety warnings 1. The "six signs and one picture" at the gate are complete and tidy 2. Construction area signs Eye-catching 3. Obvious prohibitions on dangerous areas 4. There are operating procedures signs for machinery and equipment 5. There are civilized and polite slogans on the street and on the floor 6. On-site management personnel are posted on duty ⑴ The "six signs and one picture" are not complete, the size is not uniform, the location is inappropriate, and the location is not correct. 2 points will be deducted for eye-catching, untidy, and placed on the fence; 2 points will be deducted for each lack of warning, prohibition, and reminder signs at entrances, exits, edges, and dangerous operation sites; 2 points will be deducted for failure to identify hazard sources, no hazard source publicity signs, and no occupational hazards. 5 points will be deducted for each bulletin board, and 2 points will be deducted for failure to set up safety warning signs at dangerous sources. (4) 2 points will be deducted for lack of management systems, prohibition signs, and isolation measures in warehouses, distribution rooms, carpentry sheds, dangerous goods storage points, and on-site fire sources. Points ⑸ 2 points will be deducted for each mechanical equipment lacking operating procedures and operating responsible person tags, unreasonable location, and irregular production ⑹ 2 points will be deducted for failure to set up signs with polite and polite words as required ⑺ 2 points will be deducted for each construction operation and management personnel who does not have a sign on duty Points ⑻ The color markings of protective railings, skirting boards, etc. are unclear. 2 points will be deducted for each failure to meet the requirements.

5 Working conditions and environmental protection: 1. There is a work shed for ground fixed operations 2. There is a rainproof shed for mechanical equipment 3. There are measures for environmental protection. 4. Construction waste is piled up at designated points and cleaned up in time. ⑴ If the work shed is not set up in a standardized manner and is tool-based, 8 points will be deducted. If the erection height, width, lighting, ventilation, etc. do not meet the requirements, 2 points will be deducted for each. ⑵ Mechanical equipment is not available. 2 points will be deducted for each rainproof shed; (3) 5 points will be deducted for each lack of environmental protection measures, waste burning, noise and dust control measures; (4) 5 points will be deducted for the garbage removal unit without qualifications, and containers or pipes will be deducted for garbage on the floor of the construction project.

5 points will be deducted for clearing and transportation, 2 points will be deducted for unreasonable on-site garbage storage location, and no signs. 5 points will be deducted for failure to set up a closed garbage station and garbage is not stored according to classification. 5 points will be deducted for no drinking water supply point on site

6 Fire prevention, explosion prevention, and virus prevention

1. Classification of flammable and explosive materials and storage in separate warehouses 2. Fire protection measures in place 3. Pressure containers are in a safe state 4. Domestic fire safety 5. There is a smoking room at the construction site. 6. There are measures to prevent poisoning. ⑴ 8 points will be deducted if there is no warehouse for flammable and explosive materials and the materials are not stored in categories. 5 points will be deducted if the warehouse building and location do not meet the requirements. ⑵ Insufficient, ineffective and unreasonable fire-fighting equipment will be deducted. 2 points (3) No fire certificate, no responsible person or guardian for on-site open fire work; 2 points each; (4) Oxygen and acetylene cylinders lack safety helmets and anti-shock rings, are incorrectly placed, unstable, have insufficient safety distance, and have no sun protection or oil protection 2 points will be deducted for each measure, and 5 points will be deducted for operators who do not use protective equipment correctly. ⑸ 2 points will be deducted for each location where domestic fires have safety hazards. ⑹ There is no smoking room (spot) on site, the location is unreasonable, and the layout is insufficient. ⑺ The working site will be deducted 2 points. 2 points will be deducted for each person smoking ⑻ 2 points will be deducted for each person who fails to take ventilation and personal protection measures for toxic operations and who fails to establish a management system for the storage, distribution and use of toxic materials. Part 2 Construction Safety Compliance Table 2-1

.2 Inspection

2 Scaffolding and Platform 1. The erection form of the scaffolding meets the construction requirements 2. The material meets the quality requirements 3. The erection quality meets the requirements of the specification 4. The design, calculation, inspection and acceptance meet the requirements of the specification 5. The material transfer platform complies with the specification requirements

(The inspection and acceptance standards for various types of scaffolding are based on the corresponding specification standards) ※⑴ Attached lifting scaffolds without appraisal certificates, recommendation certificates, and registration in Shaanxi will not be scored; the overhanging frame is too high (4 floors, 15 meters), no points will be awarded if the transfer platform is not made of section steel and is not closed with a small hole net

⑵ If the attached lifting scaffold is not inspected during the installation, lifting and lowering stages, 8 points will be deducted for the acceptance data ⑶ 5 points will be deducted for each item if the scaffolding steel pipes, fasteners and other materials do not meet the requirements ⑷ 5 points will be deducted for each item if various types of scaffolding erection plans cannot guide the construction, and 2 points will be deducted for failure to implement them conscientiously ⑸ Scaffolding vertical poles, large horizontal poles, and small horizontal poles , sweeping poles, connecting wall poles, pole joints, scissor support settings, scaffolding board laying, irregular steel settings for cantilevered scaffolding, loosely fixed snap rings and wooden wedges, insufficient number of cable-stayed wire rope snaps, and incorrect direction for each item 2 points will be deducted for each point. ⑹ 5 points will be deducted for the connection between the transfer platform and the frame. 2 points will be deducted for each item with unlimited load marking, overload stacking or untimely lifting. 7. The scaffolding is not equipped with the first floor, isolation layer, working layer, street frontage and passage. 5 points will be deducted for each failure in protecting the entrance; 2 points will be deducted for each location if the headboard and protective shed are not set up in a standardized manner; 8. 5 points will be deducted for failure to inspect and accept the transfer platform and scaffolding before use; 2 points will be deducted for each person/time if the personnel participating in the acceptance inspection fail to sign. ⑼If the setting of the scaffolding body and the wall parts of the building structure does not meet the requirements of the specification, 5 points will be deducted for each location.

The overall lifting scaffolding shall be inspected in accordance with the standards of the Ministry of Construction. 3. Electricity for construction 1. Adopt TN-S system power distribution achieves three-level power distribution and second-level protection 2. The distribution room construction meets the requirements 3. The line erection and burial meet the standards 4. The quality of the switch box and electrical components meets the standards, and the installation is orderly and in the correct position 5 , The leakage protector parameters are configured according to regulations 6. Electricity management responsibilities are implemented 7. Lighting meets safety requirements 8. Lightning protection devices comply with regulations ※⑴ External power lines cannot reach a safe distance from the building (outer frame), and there are no protective measures. No points will be awarded. ⑵ 8 points will be deducted for failure to adopt the TN-S system and failure to achieve level 3 power distribution and level 2 protection; 5 points will be deducted for failure to use transparent plastic case electrical components.

⑶ 5 points will be deducted for unreasonable construction and location of the power distribution room, and failure to meet safety requirements. 2 points will be deducted for unreasonable settings of the main distribution box, distribution box, and switch box. ⑷ Line erection height, phase sequence arrangement, spacing, 2 points will be deducted for each wire material that does not meet the requirements. 5 points will be deducted for wiring without drawings and quality does not meet the requirements. 5 points will be deducted if the welding machine does not have secondary overload and voltage reduction protection. 7. The electrical box does not have rainproof, dustproof measures and rubber wires. 2 points will be deducted for each item without over-circuit protection. 8) 2 points will be deducted for each item if the quality, installation, wiring, access protection, connection, etc. of the distribution box do not meet the regulations. 2 points will be deducted for each failure of the leakage protector switch and unreasonable configuration. 10. No power management system , power distribution plan, electrical configuration diagram, system diagram, inspection records, and work inspection records will be deducted 2 points each. ⑾ No safe voltage is used for lighting in the building, operations in metal containers, energy-saving lamps, and metal casings of lighting fixtures are not protected by zero connection. 2 points will be deducted. ⑿ fuses, gates, parameters and equipment capacity do not match, and switch box sockets will be deducted 2 points. ⒀ Rubber cables plus PE wires will be deducted 5 points. ⒁ Lightning protection grounding devices will be deducted 2 points if they do not meet the requirements. Part Two Construction Safety Compliance Table 2-2

4 "Three Treasures and Four Ports" Protection 1. Safety helmets, safety belts, safety nets, and dense-mesh nets meet quality standards and have complete certificates 2. The use of protective equipment complies with Requirement 3. Holes, openings, and edge protection meet the requirements. ※⑴ No points will be awarded for construction floors without protective railings, safety nets, or full-length scaffolding boards on the edges. ⑵ Staircases, elevator wellheads, reserved holes, pits, wellheads, and passage entrances 8 points will be deducted for each location where standardized, stereotyped, and tool-type protection facilities are not used for edge protection on balconies, roofs, floors, etc. (3) 5 points will be deducted for those who find that the quality of safety helmets, safety belts, safety nets, and dense mesh are not up to standard. Points ⑷ 5 points will be deducted for failure to meet the requirements for safety net and dense mesh access procedures ⑸ 2 points will be deducted for each person who does not wear a safety helmet or wears it irregularly or fails to use safety belts as required ⑹ Safety nets and dense mesh have damaged holes Or if the pollution is serious and the protective installation does not meet the requirements, 2 points will be deducted for each location. 7. The passage protective shed erection does not meet the specifications and 5 points will be deducted.

5 Formwork support construction load 1. Formwork support meets safety and quality requirements 2. Construction The stacking load on floors, shelves, platforms, etc. does not exceed the regulations ※⑴ There is no plan for the formwork support system, and the high formwork plan has not been demonstrated ⑵ 5 points will be deducted for failure to implement the construction plan ⑶ The longitudinal and transverse horizontal bars of the formwork support system are discontinuous and there is no sweeping The poles have no backing plates, the vertical pole (column) joints are not opened properly, overlapping is used, and the lower pad bricks are supported. 2 points are deducted for each place. ⑷ The formwork support system is not accepted and 5 points are deducted. ⑸ The formwork support system is connected to the outer frame and concentrated on the upper platform. 5 points will be deducted for stacking materials that exceed the standard.

6 Lifting and lifting equipment 1. Lifting equipment must comply with current national standards, industry standards, and non-elimination models 2. Equipment technical performance meets requirements 3. There must be an acceptance check after the equipment is installed Management 4. Equipment safety protection is complete and effective. ※⑴ No points will be awarded for using obsolete equipment and not installing a construction lift when the building height reaches eight floors or 25 meters. ⑵ Failure to formulate an installation and dismantling plan or there are major hidden dangers will deduct 8 points each. ⑶ Lifting 5 points will be deducted if there are hidden dangers in the attachment and connection of the equipment; 4. The equipment does not have a license for use, special equipment manufacturing license, factory certificate, inspection and testing certificate, and post-installation self-inspection report; 2 points will be deducted for each item; 5. Equipment installation, dismantling, and lifting will be deducted without explanation. 2 points will be deducted for each item ⑹ 5 points will be deducted for construction elevator safety anti-fall devices that are not regularly calibrated and there is no floor caller ⑺ 5 points will be deducted for no-load calculation of the equipment foundation, and 2 points will be deducted for poor drainage ⑻ The transmission system of the material hoist is unreasonable. If the wire rope mops the floor or comes into contact with obstacles, and the guide wheel uses an open pulley, 2 points will be deducted for each item. ⑼ Pulleys, wire ropes, and hooks do not meet the requirements. 5 points will be deducted for each item. ⑽ Over-height of the hoist, broken ropes, stops, and signaling devices 2 points will be deducted for each item that does not meet the requirements. 1) 2 points will be deducted for each item that fails to meet the requirements. 1) The material of the cable and wind rope, the setting of the ground anchor, and the rope clamp joint will be deducted 2 points. If the safety door does not meet the standards, 5 points will be deducted for each item

7 Small and medium-sized mechanical equipment 1. Equipment management 2. Equipment entry acceptance 3. Safety protection devices are complete and effective 4. Repair, maintenance, and operation are normal ⑴ Mechanical equipment is not Managers or administrators without certificates, equipment accounts are incomplete, 5 points will be deducted; (2) entry acceptance is missing, and the installation location is unreasonable; 2 points will be deducted for each unit; (3) transmission protection, safety devices, and protective neutral line connections are missing or inconsistent with each other. 2 points will be deducted according to the regulations (4) 2 points will be deducted for each unit that does not meet the regulations for maintenance, repair and operation. Part 3 Project Quality Excellence Table-3-1

1 Quality Management 1. Project Quality Excellence Goals, Plans and Measure 2

, preparation, review and approval of construction organization design and construction plans of important divisions (sub-projects) 3. Project quality assurance system and quality control measures and quality management system ※⑴ No project quality excellence goals, plans and measures ※⑵ Failure to review construction drawings ⑶ 2 points will be deducted for poor quality assurance system and quality management system ⑷ 1 point will be deducted for no special construction plan for important divisions (sub-projects) ⑸ 1 point will be deducted for failure to implement the quality management system ⑹ Quality control measures are not implemented seriously 1 point deducted

2 Measurement management 1. Microcomputer measurement should be used for concrete mixing of projects above 8 floors and above 10,000 square meters, electronic scale measurement should be used for construction projects below 8 floors and below 10,000 square meters; electronic scales should be used for masonry mortar mixing. Scale measurement 2. Testing and calibration of measuring instruments 3. Measuring equipment should be placed in the correct location, and there should be dedicated personnel to operate and keep records 4. Measuring equipment ledgers should be complete, complete and effective 5. Establish a standard maintenance room at the construction site ※⑴ Measuring equipment is not used as required or is inaccurate. ※⑵ Concrete and mortar mixing is not measured. ⑶ Measuring equipment is placed in an unreasonable location. 1 point is deducted. 4. Measuring equipment is not calibrated. 1 point is deducted. 5. There is no dedicated person to measure. ⑹ Measuring. 1 point will be deducted for incomplete records ⑺ 2 points will be deducted for failure to establish a standard maintenance room on site, and 1 point will be deducted for failure of the standard maintenance room to meet the requirements

3 Foundation and foundation engineering quality 1. Foundation and foundation engineering construction quality records 2 , Construction records and inspection reports of pile foundation projects 3. Construction records and inspection reports of lime soil cushion 4. Construction records of raft foundation ※⑴ No artificial foundation inspection report or artificial foundation inspection report has not been filed with the provincial headquarters ⑵ No prefabricated piles are provided 2 points will be deducted for the certificate and related data (steel, cement retest and concrete strength) ⑶ 1 point will be deducted for incomplete retest data of raw materials ⑷ 1 point will be deducted for incomplete construction quality records of raft foundation ⑸ 2 points will be deducted for lack of construction data of gray soil foundation ⑹ Problem pits 1 point will be deducted for no construction records ⑺ 1 point will be deducted for no drainage measures around the foundation ⑻ 2 points will be deducted if the artificial foundation fails to pass the inspection and is reinforced. Part 3 Project Quality Excellence Table 3-2

4 Main Structure Project quality Formwork project 1. Design and calculation of formwork system 2. Construction quality of formwork project

Reinforcement engineering 1. Quality of steel bars, welding rods, flux, and sleeve raw materials 2. Steel bar production, binding, and positioning measures 3. Type, specification, quantity, spacing, size and anchoring length of steel bars 4. Thickness of protective layer of steel bars 5. Protection of steel bars when pouring concrete

Concrete engineering 1. Up and down joints of beams, columns, slabs and walls Retention of construction joints at joints 2. Reservation of concrete floor slabs, stairs, steps and openings 3. Mixing, pouring, curing and retention of specimens of concrete 4. Prefabricated concrete construction and installation quality 5. Concrete seasonal construction measures 6. Steel structure construction Production and installation 7. Quality of post-anchoring connections of concrete structures

Masonry engineering 1. Masonry method and setting of skin rods 2. Thickness and fullness of masonry mortar mortar joints 3. Reserved tie bars Specifications, quantity, length, spacing 4. Installation and quality of lightweight partition walls ※⑴ Main raw materials and structural (accessory) parts are unqualified ※⑵ Concrete project has super-standard cracks ※⑶ No formwork system design and calculation ※⑷ Steel bar specifications , the quantity does not meet the design requirements; the strength of the concrete and masonry mortar is not up to standard, and no test blocks of the same condition are left. (5) The formwork surface is uneven, the joints are not tight, and the corners are not smooth. 2 points will be deducted. (6) The formwork support system is not constructed according to the design and specification requirements. 2 points ⑺ 1 point will be deducted if the formwork is not painted with release agent or used engine oil, and the debris is not cleaned up ⑻ Single-sided formwork for the balcony partition is deducted by smearing and forming ⑼ 1 point will be deducted if the location, spacing, and size of the steel bars are not allowed ⑽ 1 point will be deducted if the steel bar tying is not standardized ⑾ 2 points will be deducted if the steel bar overlap length and anchoring length do not meet the specification requirements ⑿ 2 points will be deducted if the steel bar has no positioning measures and the thickness of the protective layer exceeds the specification ⒀ The concrete is not vibrated solidly and has honeycomb pits. 1 point will be deducted for holes, 2 points will be deducted for unreasonable construction joints; 1 point will be deducted for beams, columns, and walls with expansion molding, diameter reduction, and root rot; 2 points will be deducted for cross-sectional size errors that exceed the standard; 2 points will be deducted for uneven floors and large differences in stair steps. 1 point ⒃ 2 points deducted for standard maintenance of concrete or irregular retention and maintenance of test blocks with the same conditions ⒄ 2 points deducted for geometric dimensional errors of doors, windows, and reserved openings exceeding the standard; ⒅ 1 point deducted for components that are not installed with grout, and the bottom surface is uneven and unstable ⒆ If the gray joints of the masonry are not straight and full, 1 point will be deducted if there are open joints and they are transparent, and 2 points will be deducted for the mixed construction of different blocks. ⒇ The joints between the masonry and the concrete ring beams and structural columns are uneven, and 1 point will be deducted if they are not clear (21 ) Wood bricks and prefabricated concrete blocks are of poor quality, the pre-embedded position is inaccurate, and 1 point is deducted for not being anti-corrosion (22) Damaya is left in place, and the pre-embedded tie bars do not meet the requirements, 2 points are deducted (23) There is no underfill wall three

1 point will be deducted for ordinary bricks and inclined-pressed bricks that are not cut at 45° angles and are not filled with triangular concrete blocks (24) 2 points will be deducted for failure to set up concrete flanges in water-filled rooms (25) 2 points will be deducted for not having concrete lintels in openings above 300㎜ ; 1 point will be deducted if the length of the lintel is not enough (26) 2 points will be deducted if the position, diameter and hole depth of the anchor hole of the rear anchor do not meet the design requirements (27) The position, size and pull-out force of the anchor bolt and rear reinforcement are not detected 2 points will be deducted for meeting the requirements (28) 2 points will be deducted for using construction materials that have been eliminated or restricted (29) 2 points will be deducted for non-standard steel structure production, installation and coating. Part 3 Project Quality Excellence Table 3-3

5 Reserved and buried water and electricity pipes 1. Installation of distribution boxes (boxes) 2. Pre-buried electrical conduits

3. Reserved holes for water and heating pipes through walls, boards, and beams 4. Through walls Casing installation 5. Setting of flexible connection joints across deformation joints ⑴ Metal thick-walled electrical conduits are connected by butt welding ⑵ Electrical conduit wire connections are not bridged and grounded. 2 points will be deducted. 3. Electrical conduits are not internally and externally anti-corrosion as required. 1 point will be deducted. 4. Electrical 1 point will be deducted if the pipe does not enter the wall by 1.5cm, and the box is larger than 5cm. ⑸ 2 points will be deducted if the pipe passes through the wall or the board is not equipped with a casing. 1 point will be deducted if the casing does not meet the requirements of the specification. ⑹ Mechanical slotting is not used for the embedded pipe. 1 point Points ⑺ 2 points will be deducted for pipelines passing through basement exterior walls without waterproof casing ⑻ 1 point will be deducted for pipelines passing through deformation joints without flexible joints

6 Inspection management 1. Inspection unit qualification 2. Inspection contract and order form 3. Preparation, review and approval of testing plans for relevant testing items

4. Testing reports ※⑴ The entrusting unit did not sign a testing contract with the testing unit ※⑵ The unqualified test conclusion report was not processed as required ⑶ The testing unit is not qualified Or 2 points will be deducted for testing beyond the scope of qualifications ⑷ 1 point will be deducted if the construction unit entrusts it ⑸ 1 point will be deducted if the entrusting unit fills in the wrong form ⑹ 2 points will be deducted if the entrusting unit splits a testing item and entrusts multiple testing units to ⑺ In the test report 1 point will be deducted if the amount of project information is incomplete ⑻ 1 point will be deducted if the test report reflects incomplete test parameters

7 Engineering technical data 1. Whether the data collection is synchronized and complete, and the classification and compilation are true and credible 2. Raw material certificate and Whether the retest report is complete, authentic, and valid 3. Whether the acceptance records of tank inspection, foundation, and main project are signed and stamped 4. Witness the implementation of the sampling system 5. Building settlement observation records 6. Engineering and technical personnel qualification certificates, and operator induction Whether the certificate is complete and valid ※⑴ The steel structure project was not inspected for flaw detection in accordance with the regulations ※⑵ The settlement observation and record were not carried out during the construction process ⑶ The data collection was delayed and the classification was not carried out as required. 1 point will be deducted for incomplete signatures and seals ⑷ The original material certificate was not marked Using the project name, not affixing the seal of the supplier, deducting 1 point for not retesting according to the batch number (5) deducting 1 point for not retesting steel welding and mechanical connections according to the batch (6) deducting 1 point for incomplete concrete ledger and construction log and records, commercial concrete guarantee 2 points will be deducted for incomplete information ⑺ 1 point will be deducted for no cement 28-day strength report, 2 points will be deducted for failure to test the stability ⑻ 2 points will be deducted if there are no test blocks of the same conditions or winter concrete construction temperature measurement records, and 1 point will be deducted for records that do not meet the requirements ⑼ Settlement Observation records are not standardized and there is no stage evaluation report, 2 points will be deducted. 10. Main measuring instruments are not calibrated, 1 point will be deducted. 10. Quality inspectors, testers, data clerks, etc. will be deducted without certificates. 2 points will be deducted. 10. No structural inspection (protective layer thickness test) will be deducted. 2 points ⒀ 2 points will be deducted if there is no post-reinforcement pull-out test report or the representative batch does not meet the specification requirements ⒁ 2 points will be deducted if the witness sampling system is not implemented carefully ⒂ 1 point will be deducted if there is a large gap between the quality assessment and the entity of some parts of the project, the division ( Sub-division) 2 points will be deducted for incomplete acceptance information. Part 4 Office and Living Facilities Neatness Table 4-1

1 Office environment 1. The office area, living area and construction area are clearly separated and separated, and the building meets the standards. 2. The location of the temporary housing is reasonable and complies with safety, fire protection requirements and relevant national regulations. 3. Monitoring room (projects above 10,000 square meters) ※(1) There is no obvious separation between the office area, living area and construction area, and there is no monitoring equipment. Prefabricated houses with more than two floors will not be scored (2) Office facilities that do not meet the lighting and ventilation requirements, 5 points will be deducted if the office environment is untidy and unhygienic, no closed garbage containers are provided, and 2 points will be deducted for each of rudimentary and damaged office equipment (3) Monitoring equipment 8 points will be deducted for less than 4 video cameras, 5 points will be deducted for not setting up a monitoring room, and 2 points will be deducted for no monitoring records

2 Canteen 1. The canteen management system is sound 2. The canteen has a food hygiene license and cooking staff Hold a health certificate to work 3. The canteen building meets the requirements 4. The sanitation of the canteen meets the standards 5. Raw and cooked food are handled separately, and preservation measures are in place in summer 6. There are "four

7. Sewage discharge meets the requirements. 8. Cooking equipment is safe and fire-fighting facilities are in place and effective. 9. The canteen is equipped with ventilation facilities and storage rooms. 10. Cooking utensils, tableware, and drinking fountains are cleaned and disinfected. ※⑴ Cooking personnel work without health certificates, food accidents occur No points will be awarded for poisoning incidents (2) There is no management system in the canteen and the lack of preventive measures to prevent food poisoning will be deducted 8 points each; (3) Failure to publish the food hygiene license and health certificate will be deducted 5 points each; (4) The canteen building does not meet the requirements, and the gas tank is not stored separately, each deducted 5 points points, ⑸poor sanitation in the canteen and restaurant, untidy operation room, no ceramic tiles on the pot table, and no vegetable rack in the storage room. 5 points will be deducted for each item. ⑹No disinfection cabinet or not used, no freezer preservation measures in summer, poor operator hygiene, 5 points will be deducted for not wearing work clothes, and 2 points will be deducted for not dividing raw and cooked food. 7. The canteen is not equipped with ventilation facilities or has no rodent-proof baffles, fly-killing lamps, and screen doors and windows. 8. There is no drainage ditch or no drainage ditch in the operation room. 5 points will be deducted for each item of timely cleaning, no grease trap or no timely cleaning of canteen sewage discharge, and no closed swill bucket outside the canteen. 9. No safety protection for cooking equipment, substandard electricity consumption in the operation room, and no fire-fighting facilities will be deducted 2 points each. 5 points will be deducted if there are no moisture-proof isolation measures for storage in ⑽ meters or squares

3 Dormitories 1. The dormitory building meets the standards 2. There is obvious separation between the dormitory and the construction area 3. The ventilation, lighting, sanitation and safety in the dormitory comply with regulations 4. The dormitory has a management system, and the list of residents and hygiene duties are posted in a conspicuous place. 5. The dormitory residents meet the standards. 6. The dormitory is equipped with storage cabinets for personal belongings. 7. The electricity consumption in the dormitory is regulated ※ (1) Single berth per person is not achieved , the project under construction doubles as accommodation, no points will be awarded (2) The dormitory building is not up to standard, no heating in winter and no cooling measures in summer, 8 points will be deducted (3) There is no obvious separation between the living area and the construction area, 5 points will be deducted, and no closed garbage container will be deducted 2 points (4) Dormitory area, height, passage width are not up to standard, beds exceed the second floor, and each room has more than 16 people, 5 points will be deducted. (5) Ventilation, lighting, and sanitation in the dormitory do not meet standards, and energy-saving lamps are not used. 5 points will be deducted for each room. Points (6) There is a lack of public security, fire prevention, and sanitation management systems and measures in the dormitory. The dormitory sanitation duty and the list of dormitory personnel are not posted in a conspicuous place. 5 points will be deducted. (7) There are no personal belongings storage cabinets, shoe racks, and washbasins in the dormitory. 2 points will be deducted for each rack and dormitory without opening windows, unsupported facilities and poor management. (8) 8 points will be deducted for each case with messy wire installation and safety hazards. Gas bottles and other dangerous goods stored in the dormitory

Part 4 Office and Living Facilities Neatness Table 4-2

4 Toilets 1. The location of the toilets is reasonable and the building meets the standards 2. Hygiene standards are met 3. Simple toilets are provided every fourth floor in buildings with more than eight floors 4. The toilet should be flush or mobile, with lighting inside and isolation pits. 5. There should be a sanitation management system and someone is responsible for cleaning and management. 6. Sewage discharge should meet the requirements. ※⑴ No points will be awarded if the toilet building has safety hazards. ⑵ No points for office areas and construction areas. 5 points will be deducted for the toilet. (3) 5 points will be deducted for failure to flush the water, tiling, substandard sanitation, no wash basin and grooming mirror. 4. 5 points will be deducted for lack of lighting in the toilet and lack of segregation for squatting. 5. Failure to publicize the sanitation management system and cleaning responsibility. 5 points will be deducted for each person who fails to implement the system; 2 points will be deducted for lax implementation of the management system and failure to clear the house in a timely manner. ⑹ 5 points will be deducted for not having a simple toilet every four floors in a building with eight floors or more, and 2 points will be deducted for each place without signs. Points ⑺5 for each item without screen windows, door curtains, or fly zapping lamps

Bathroom 1. Bathroom construction safety

2. The bathroom has a management system, the bathroom facilities are complete, and the functions are good. Comply with safety and health requirements ⑴ 8 points will be deducted if the bathroom construction does not meet the standards

⑵ 5 points will be deducted if the bathroom facilities are not fully functional and fail to meet national health regulations and safety requirements. The bathroom has no management system and cannot function normally. Open, less than 5 bathing places/100 people, no lockers or hangers will be deducted 2 points each 10 ⑴ ⑵ ⑵

6 Hygiene 1. Meet the requirements of national building hygiene regulations

2. Have health and first aid plans and drills

3. Equipped with commonly used medicines and first aid equipment such as bandages, tourniquets, stretchers (1) 8 points will be deducted for failure to provide commonly used medicines, first aid equipment, or expired medicines< /p>

(2) 5 points will be deducted for each lack of first aid plan or first aid equipment at the construction site

(3) 5 points will be deducted for each lack of infirmary and health care first aid kit or lack of commonly used drugs

< p>(4) Deduction of 2 points for no first aid personnel or lack of training

(5) Deduction of 5 points for failure to carry out publicity and education on occupational health knowledge 10 ⑴ ⑵⑶

(5) ⑷ < /p>

7 Living environment 1. The living environment is clean and hygienic

3. Garbage fixed points

Stacking of categories and clearing and transporting in time

3. Bathroom facilities should meet the requirements

4. Measures to eliminate the "four pests" are in place (1) The environmental sanitation of the living area is poor, 5 points will be deducted for not having a laundry room and washing machine, and 2 points will be deducted for not having a drying area

(2) The living area is not hardened and greened 5 points will be deducted for failure to set up drainage ditches

(3) 5 points will be deducted for no domestic trash cans, 5 points will be deducted for not separating recyclable and non-recyclable garbage, unreasonable storage location, and 2 points will be deducted for failure to clear and transport in time

p>

⑷ If there is no wash basin, 5 points will be deducted for not using water-saving faucets

⑸ If there are no measures to eliminate the "four pests" in the office and living areas, and there is no regular use of drugs and spraying, deduct 5 points 5 points 10 ⑴⑵⑶⑷⑸ ⑴

Subtotal of inspection content 14 Subtotal of deduction items 18 Subtotal of deductions Actual score

Note: 1. ※ symbol To reject the project;

2. The points deducted shall not be greater than the points deserved for the item

3. When a project has multiple failures, mark the dots on the corresponding serial number √ , the accumulated points will be deducted;

4. The table is converted into the total table score =

Shaanxi Province Civilized Construction Site (House Construction Project) Inspection and Evaluation Table

Part 5: Creating a Good Civilized Atmosphere Table 5

Acceptance Item Inspection Time: Inspector:

Serial Number Inspection

Item Inspection Content Point Deduction Standard Score Deduction Points are divided in the corresponding serial numbers √ Total deduction points Actual points Remarks

No points 8 points 5 points 2 points

1 Civilized education 1. Carry out civilized employee activities< /p>

2. Conduct civilized education for employees

3. Standardize civilized behavior ⑴ Deduct 8 points for not having a civilized employee agreement

⑵ Every employee who fails to provide civilized education to employees 2 points will be deducted

⑶5 points will be deducted for each place where open defecation occurs

⑷2 points will be deducted for each person who is naked, wearing slippers and other uncivilized behaviors 25

(1) (3) (2)

(4) According to

JGJ

59-99 table

3.0

.3 Inspection

2 Comprehensive management 1. Establish a labor registration card for the entry personnel, clear the number of people, and clarify the situation

2. Sign an agreement with the relevant units Public security, fire prevention, and environmental protection agreements and strictly abide by them

3. No major public security or public disturbance incidents ※⑴ If a public security or public disturbance incident occurs and the impact is large, no points will be awarded

⑵ No admission has been established 8 points will be deducted for personnel registration cards

⑶5 points will be deducted for unclear numbers of on-site personnel

⑷8 points will be deducted for using unknown personnel

⑸Failure to contact relevant units ***5 points will be deducted for each item that establishes joint prevention measures and agreements on public security, fire prevention, environmental protection, etc. 25 (1)

(2)

(4) (3)

(5) Same as above

3 Publicity and entertainment 1. Create a healthy and beneficial publicity atmosphere at the construction site and living area

2. There is an entertainment activity room and frequent activities< /p>

3. Carry out civilized activities ⑴ 5 points will be deducted for no blackboard newspaper and bulletin board

⑵ 5 points will be deducted for not carrying out cultural, sports and entertainment activities

⑶ No night school for employees or 8 points will be deducted for the entertainment room, 5 points will be deducted for each room if there is no TV, newspapers, books and materials, etc. The room is not fully functional

(4) 2 points will be deducted for the inability to perform normal activities or the activities are not recorded

(5) 5 points will be deducted for failure to carry out education on energy conservation, environmental protection, ecological civilization, and harmony between man and nature, and 2 points will be deducted for failure to carry out activities or records 25 (3)

(1)

(2)

(3) (5)

(4)

(5) Same as above

4 items Cultural construction 1. Carry out civilized competition activities between classes

2. Establish amateur classrooms for employees ⑴ No competition plan, 8 points will be deducted for failure to carry out competitions between classes

>

⑵ 5 points will be deducted for failure to carry out regular summary evaluation and commendation and no activity information

⑶ 5 points will be deducted for not having staff training and education facilities

⑷Failure to carry out employee education activities or activities 5 points will be deducted for incomplete records 25 (1) (2)

(3)

(4)

Same as above

Check the content Subtotal 11 Subtotal of deducted points 19 Subtotal of deducted points Actual score

Note: 1. The ※ symbol indicates a rejected item;

2. The deducted points shall not be greater than the deserved points for the item Number;

3. When a project has multiple unqualified points, mark the corresponding serial number √ with dots, and the points will be deducted cumulatively;

4. This table is converted to a total Table score = .