The correct use of the mixing pump truck will give full play to its effect, but you must choose a high-quality concrete mixing pump truck with excellent pumping system and configuration, otherwise the machine will still break down correctly. Today, Luxda will tell you how the concrete pump truck can transport concrete correctly.
1. Before pumping, pump a proper amount of water to lubricate the pipeline
Some operators will misunderstand that due to the long pipeline, enough water should be added to fully lubricate it. During construction, too much water is pumped, which causes the apron of some pipe clamps to be washed out and leaked. When mortar is struck, the interface between mortar and water is soaked by water for a long time, and the water takes the cement slurry away, resulting in mortar segregation and increased pumping resistance, which leads to the cement slurry squeezing out from the washed apron, thus causing pipe plugging.
2. Before pumping by the concrete mixing pump truck, the equipment should be fully inspected
Check whether the concrete mixing pump truck is placed stably and firmly as required;
check whether the water tank is filled with clear water;
fill the oil tank of lubricating grease pump with # lithium-based grease;
check the glasses plate, and the gap should not be too large, otherwise the same fault will be caused by internal slurry leakage;
considering the problem of high pumping pressure and overflow of the main safety valve, the pressure of the main system can be adjusted to 28MPa
3. Pipe laying requirements
1. The long-distance pumping resistance of the mixing pump truck is large, and the bent pipes should be reduced as much as possible, and large bends should be used as much as possible instead of small bends. Practice has proved that every additional 9o×R1 elbow is equivalent to an additional 5m horizontal pipe. Therefore, only four 9o×R1 bends with φ125A were used for pipe laying, and the rest were φ125A×3m straight pipes and φ125A×2m straight pipes with a total length of 31m.
2. Pay attention to the reinforcement of the pipe and the fastening of the pipe clamp. This kind of long-distance pumping will encounter the phenomena of intensified pipe jumping and pipe jam explosion. Therefore, it is necessary to fully reinforce the bend and some straight pipes to slow down their impact.
iv. after pumping by the concrete mixing pump truck, the pipeline should be cleaned in time. The pipeline cleaning should be disconnected from the middle and cleaned twice to ensure safety and reliability. It should be noted that when the sponge ball is plugged, a cement bag should be added in front of it, two sponge balls should be used and a cleaning piston should be added.
5. The high grade and high viscosity of concrete make it difficult for concrete mixing pump truck to pump. The coarse aggregate size of C6 high-grade concrete is below 3mm, and the gradation is reasonable. Sand ratio is 39%, medium and fine sand; And cement consumption can meet the pumping requirements. However, restricted by strength, its water-cement ratio is between .2 and .3, resulting in slump of about 12cm, which affects the fluidity of concrete when pumping and increases the resistance. Increasing sand ratio can improve its pumpability, but it affects its strength and can't meet the design and construction requirements. Therefore, the only way to solve this problem is to add water reducer, which will not affect the strength, but also increase the slump. No water reducer was added at the beginning of pumping, and the pumping pressure was 26-28MPa, so the pumping speed was slow and the effect was poor. If it is transported at high pressure for a long time, it will affect the stability and reliability of the concrete pump. Later, when a certain amount of water reducing agent (NF-2) was added, the slump reached 18-2m, and the pumping pressure dropped significantly, only about 18MPa, which doubled the pumping efficiency. In addition, in the process of pumping, the operator should also be reminded that the concrete in the hopper must be above the center line of the mixing shaft, otherwise it will cause the concrete to splash around and hurt people, or the pipe will be blocked due to air suction and gas compression.
Shenzhen Lishida Construction Machinery Equipment Co., Ltd. was established in 2, with 15 employees. It is the earliest large-scale private enterprise engaged in pump truck leasing in Shenzhen. The company's equipment mainly consists of 37m, 46th, 52m, 56m, 62m, 68m, 72m, 86m concrete pump trucks and truck-mounted pumps of Sany Heavy Industry, a leading brand in the industry. After years of development, it has become one of the largest, modernized and professional pump truck leasing enterprises in Shenzhen.
- Previous article:Breastfeeding misunderstanding big demining!
- Next article:Classic talk about qq space
- Related articles
- Comments on vagrant women
- On the disgusting and lingering love encyclopedia 202 1
- Is it good to fish in foggy weather in winter?
- The custodian teacher takes a photo of the meal and talks about it.
- What are the personality characteristics of Gemini boys?
- Tell me about the other police car.
- Send Aauto quickly and speak short sentences suitable for Aauto quickly.
- What would you do if your girlfriend went shopping with her sister and you?
- About Love Personality Signature Daquan WeChat Personality Signature Love Quotations (62 sentences)
- Talk about brother's space