Joke Collection Website - Mood Talk - Let's talk about how much is a square meter for basic decoration.

Let's talk about how much is a square meter for basic decoration.

Take a bungalow with a building area of 129 as an example. The actual area is about 105 square meter, with 4 rooms, 2 halls and 2 bathrooms, with balcony and simple decoration. See how much it will cost in the end.

Let's look at the actual area of each room. The living room is 38 square meters, the balcony is 6 square meters, the kitchen is 6 square meters, the main bathroom is 3.5 square meters, the secondary bathroom is 5 square meters, the master bedroom 15 square meters, the bedroom 12.5 square meters, the bedroom is 2 1 square meters, and the study is 8.7 square meters. One * * is 65433 square meters. The pool area is 24 square meters. The pool area is not large.

1, our step 1 is to measure the actual use area of the house to see if your pool area is large. If your pool area accounts for a large proportion, your expenses will be much less.

That's why when we repossess the house, we need to carry out the house acceptance in step 1 to measure whether the area of your house is the same as the developer said, and whether the usable area of your house has decreased. You can check the house by yourself or ask your friends to help you, but you must have a certain knowledge reserve.

Secondly, no matter who we look for to decorate the house, its quotation is based on the quotation after the final measurement and design of the house is completed. Before the house is measured and designed, all the prices are only estimates and are for reference only.

Step two, we do the decoration design. In order to save money, you can design it yourself or find those that can be designed for you for free, so you can save a lot of decoration and design expenses here.

After we got the house, we began to design the room. The design price varies greatly. Some companies design for free and provide you with the most basic decoration plans and drawings. Generally, the decoration design fees of companies range from 1000 yuan per square 50 yuan, so the design fees of those large decoration companies are generally more than 6,000 yuan.

3. The third step is to enter the stage of house demolition and transformation, and make as few changes as possible, which can save a lot of money.

At this stage, we need to remove the white ash layer of the original house. If the original lime layer is water-resistant putty, it is not necessary to remove it. Secondly, we must eradicate the original insulation. In fact, there is no need to eradicate the insulation layer. It depends on personal needs. Secondly, we have to knock out the position of the original door and the change of the wall. We must build a wall where it needs to be rebuilt. In addition, there are various air conditioning holes in the room, the exhaust holes need to be replaced, and the doors and windows need to be removed.

I will announce the common expenses in the stage of demolition and reconstruction in Changsha. The cost is basically the same all over the country. First-tier cities are slightly more expensive, while third-and fourth-tier cities are relatively cheaper.

The price of removing insulation layer ranges from 10 to 15 per square meter.

The price of removing lime layer ranges from 10 yuan to 15 yuan per square meter.

Knock on the wall every square 50 yuan, build by laying bricks or stones every square 50 yuan, paint the wall every square 65438 yuan +05 yuan, modify the door 200 yuan.

Punch 50~ 100 holes in the wall,

50~ 100 doors and windows demolition,

There is also a garbage clearing fee, which varies in price according to the distance from the garbage station.

There are also materials that need to be prepared at this stage, including cement, sand, red bricks, garbage bags, tape measures, temporary toilets, mortar buckets, shovels and so on. The cost of materials used here is not much.

Step 4, we enter the hydropower stage. The cost of hydropower stage is related to the quantity of your renovation. If we only do partial transformation, the relative cost we want is relatively low. If it is a whole house decoration, the cost is relatively high.

If it is a partial renovation, you can find some jobs. It usually costs 300~350 a day here in Changsha, and we can also calculate the price directly according to the number of local decoration. If the whole house is renovated, it will be charged according to the point and quantity.

Waterproof 65 yuan per square meter, trunking per meter 15 yuan, renovation of internal water pipes in 55 yuan one meter, air traffic control wiring per meter 20 yuan, and water and electricity installation generally per square meter 25 yuan.

There are many materials for hydropower installation, including waterproof materials, water pipes, wires and various small accessories. Here we announce the price of the main material: in order to avoid suspicion, I won't say the specific brand.

6 square 635 coil 100m, 4 square 425 coil 100m, 2.5 square 305 coil 100m,

27 yuan for each water pipe, PVC 1 10 pipe 1m 20 yuan, PVC75 pipe 1m 16 yuan, an internal elbow 6 yuan, a globe valve 20 yuan, a bottle of PVC glue 4 yuan, two yuan for raw materials, two pieces of electrical tape, one yuan for switch bottom box and network cable.

At this stage, the labor is 25 square meters, the material is 35 square meters, and the water and electricity cost is about 7700 yuan, including labor and materials.

5. The fifth step, we entered the Mei Sen stage. If you want to save money in the mason stage, it is mainly in the cost of materials and labor. If you want to save money, don't do too complicated modeling.

Masons usually put a square around 40 yuan, and 800×800 tiles are in 20 yuan, with a square of about 1.8, and 36 yuan. The cost of laying cement sand per square meter is around 24 yuan. If the whole house is paved, the total paving area is 106, and the tile paving cost is 65438.

Cheap wall tiles cost 300×600 7 yuan, 6 pieces per square, and the cost per square is 42 yuan. The wall treatment costs about 20 yuan per square, and the labor cost is about 40 yuan per square. There are two bathrooms and a kitchen, and Yangjiang costs about 8,200 yuan.

Other expenses are about 1 0,000 yuan, so the total cost of bricklayer's stage is10.98 million yuan.

In addition, the cost of cabinets is 3600.

6. In the sixth step, we enter the woodworking stage. If you want to save money in woodworking stage, you should lower the ceiling and try to keep the top surface simple.

The cost of suspended ceiling in Changsha is 120 yuan per board, including labor and materials. According to the complexity of construction technology, the price has changed.

All kinds of cabinets can be customized according to your own preferences, or you can buy food yourself and then process it yourself.

Woodworking is 350~400 yuan a day, which is 120 if calculated by the board. According to the amount of labor, the cost of materials and labor is basically the same.

Two bathrooms, a kitchen ceiling, a * * 18 square meter, each square meter 150 yuan, a * * * costs 2700 yuan.

7. In step 7, we enter the painter stage, which is the key link. We choose materials and finally choose environmentally friendly materials, which is better for people's health.

The price of putty powder here in Changsha is about 15 yuan a pack, and it costs 6700 yuan a barrel to paint 300 yuan. At this stage, you can buy your own materials and find a master for construction, or you can find a master to contract for 300~350 days. The general contracting price is about 20 yuan per square meter.

At this stage, we spent 8500 yuan.

Step 8: We enter the stage of cleaning and sewing the new house. Saving money at this stage means not using sealant. When sticking bricks, make the gaps smaller, and then we fill them with caulking agent.

The beautiful seam between floor tiles and wall tiles is still pretty. If you want to save money, you have to rely on yourself. The cost of the sewing agent is 18 yuan per square meter, and the cleaning of the new house can be done by the day, 240 yuan a day.

This stage cost 3000 yuan.

9. Install curtains, hardware, lighting, bathroom, etc. The price of this is different according to the variety you choose.

10, buy furniture and electrical appliances at step 10,

Now let's figure out how much it will cost for simple decoration.

Decoration design 500 yuan+demolition 2000+ water and electricity 7700+ bricklayer's part 19800+ cabinet 3600+ carpenter 2700+ painter 8500+ sewing and cleaning 3000+ soft decoration (unknown)+furniture (unknown)+management fee (10%), with a total cost of 5.

1 1, so we can't just look at the estimate of the decoration price. We need to be clear about the price of each commodity. What brand and specification is it? The specific details need to be seen, otherwise many projects may not be included in the contract in the later period, which will lead to the increase of later expenses and projects.

Let's take a look at several schemes and see who is cheaper.

12, don't sign a contract or pay a deposit until the decoration budget, material list and expense details come out. No matter what occasion you pay the deposit, you can only lead by the nose.

What is the renovation budget?