Joke Collection Website - Mood Talk - Residential household acceptance standard

Residential household acceptance standard

With the continuous improvement of social and economic development, people's quality of life is getting better and better, and many people will go to cities to buy houses, thus improving their living environment. And all the houses we got passed the household acceptance, so what is household acceptance? What are the acceptance criteria? The following small series will tell you about the relevant knowledge of residential household acceptance standards.

First, what is household acceptance?

Household acceptance refers to the special acceptance of the public parts of each household and unit when the residential project is completed and accepted. After the household acceptance is qualified, the corresponding project quality completion acceptance record needs to be issued.

Second, the residential household acceptance criteria

1. There is no leakage at the joints between pipes and appliances and between pipes. After installation, there is no leakage in water pressure test;

2. There is a leakage circuit breaker in the distribution box, the leakage current is less than 30MA, and it has overload and overvoltage protection functions;

3, plastering surface should be clean, smooth surface, straight line foot, firm bonding, no delamination, ash, cracks and other defects;

4, ceiling installation is firm and flat, no pollution, cracks, lack of edges and corners and other defects;

5. The shape, structure and installation position of closets and hanging cabinets should comply with the design requirements, and be constructed in strict accordance with the specifications, so that the surfaces are smooth and firm, and there is no glue leakage, degumming and warping;

6, toilet equipment appearance clean without damage, installation is firm, not loose, smooth drainage, joint seal without leakage, convenient valve switch;

7. All walls, roofs and woodwork surfaces to be painted should be brushed twice with putty powder before painting;

8, aluminum alloy doors and windows varieties, specifications, open direction and installation position should comply with the design regulations;

9. Determination of construction quality Water supply and drainage pipes, electrical equipment and toilet equipment must all be qualified, and the rest of the projects need to be 90% qualified, so the project quality is judged as qualified.

The above is Bian Xiao's summary of the relevant contents and information about the residential household acceptance standards, hoping to bring help to everyone.