Special construction scheme for the removal of outer frame

The special construction scheme for the removal of the outer frame mainly includes the following aspects: compilation basis, general situation of the project, demolition construction technology, safety protection measures, quality assurance measures, emergency plan and construction progress plan.

1. Compilation basis: Prepare the demolition plan according to relevant national laws and regulations, industry standards and actual conditions of the project.

2. General situation of the project: introduce the name, address, scale, structure and other basic information of the project, as well as the specific situation of the erection and use of the outer frame.

3. Demolition construction technology: describe the specific steps and methods of demolition construction in detail, including demolition sequence, construction technology and operation points.

4. Safety protection measures: including safety protection, environmental protection and fire protection measures on the construction site to ensure the safe and smooth demolition construction.

5. Quality assurance measures: including quality control and acceptance criteria. , to ensure the quality of demolition construction.

6. Emergency plan: Make an emergency plan for possible emergencies, including emergency organization, emergency measures and emergency procedures.

7, construction schedule, materials and equipment plan, labor plan, etc. , to ensure the smooth progress of the demolition construction.

Matters needing attention in the removal of outer frame

1. Strictly follow the special construction plan: the demolition operation must follow the formulated and approved special construction plan to ensure the safe and orderly construction process.

2. Safety technical disclosure: Before the demolition operation, the person in charge of the unit project shall organize safety technical disclosure for the demolition workers to ensure that each worker understands the safety requirements in the demolition process.

3. Cleaning scaffolding: Before dismantling, the garbage, sundries and obstacles that affect the dismantling operation should be removed to ensure the smooth dismantling process.

4. Step-by-step removal: Scaffolding removal must be carried out step by step from top to bottom, and it is forbidden to work at the same time. Even the wall should be removed step by step with the scaffold. Before dismantling scaffolding, it is forbidden to dismantle the whole layer or several layers of wall pieces.