Joke Collection Website - Mood Talk - The most correct sequence of masonry construction teaches you to firmly grasp the rhythm of construction

The most correct sequence of masonry construction teaches you to firmly grasp the rhythm of construction

Masonry construction is indispensable for every home decoration. After all, in our kitchens, bathrooms, balconies and other places that are prone to moisture, the wisest way to decorate is to choose to lay ceramic tiles. So during the decoration, masonry construction The editor will tell you what the sequence is:

Masonry construction sequence diagram

Masonry construction sequence one: Preparation before masonry construction

Construction environment preparation :

1. Before the masonry construction, check the floor level, wall verticality, and squareness of the yin and yang angles of the original house with tiling works one by one. If any areas that have an impact on the construction quality are found, report them immediately. Report to the project manager and discuss solutions. Otherwise, the masonry team leader will be responsible for all consequences.

2. Before laying wall tiles, you should ask the plumber and electrician to see if the waterway has been laid out and tested for pressure, and whether the electrician's switches and sockets have been set. Otherwise, rework will occur. Before laying the wall tiles, they must be approved by the mason and plumber.

Preparation of construction materials:

The materials required during the masonry construction process include: main materials such as wall tiles, floor tiles, and antique bricks, as well as auxiliary materials such as cement, sand, and red bricks. Materials at the construction site should be inspected before construction.

1. First, check the main materials to see whether their varieties, specifications, and colors meet the design requirements. Check whether the wall and floor tiles are damaged. Take two bricks and put them face to face to see if the flatness of the surfaces is too different. Use a ruler to measure the width, narrowness, diagonal length difference, and whether the shape is smooth and square. , whether there are missing edges or corners, whether there are cracks and deglazing, whether there are any unevenness and distortion, and the degree of water seepage, etc.

2. Next is the inspection of masonry auxiliary materials such as red bricks, cement, and sand. For example, the specifications of red bricks are 240mm × 120mm × 60mm, which have strong hardness; cement usually uses 32.5# cement, which is black and gray in color. Please refer to the label of the cement paper bag for details about whether the use period has expired (within three months). There are three types of sand: coarse, medium and fine sand. Medium sand is used for home decoration. It is necessary to observe whether the mud content exceeds the standard and whether it is clean.

Preparation of construction tools:

The tools used in mud and wood construction mainly include: hanging wire, ruler, leveling ruler, weight, square, cutting machine, shovel, Ash buckets, brushes, hammers, masonry knives, etc.

Masonry construction sequence two: Masonry construction

1. Paving bathroom wall tiles (before door cover installation)

2. Paving balcony floor tiles

p>

3. Paving kitchen wall tiles (before installing door frames and cabinets)

4. Building foundation of bathtub

5. Waterproof layer on bathroom and kitchen floors

6. Bathroom floor

7. Kitchen floor

Precautions for masonry construction:

Five taboos: 1. Do not damage the load-bearing Structure 2. Do not damage the outer wall. 3. Do not damage the waterproof layer. 4. Do not increase the static load of the floor. 5. Do not bury coal and gas pipes in the wall.

Six unfavorables: 1. The bedroom should not be paved. Marble 2. It is not suitable to lay polished tiles in kitchens and bathrooms, but anti-slip floor tiles. 3. The bathroom floor should not be at any height. 4. Floor drains should not be installed vertically. 5. The waist line should not be higher than 1.2 meters and lower than 0.9 meters. 6. The partition wall should not be built with a 1/4 wall, that is, a side brick wall.

Masonry construction sequence three: Masonry construction acceptance

1. Smooth surface

2. Bathroom floor with 2.5‰ slope

3. Wall There are no hollows on the surface and floor tiles

4. The yin and yang angles are square and straight

5. There are no pollution or gaps on the masonry surface

6. Confirmation of project quantities. Confirmation of additions and subtractions

The masonry work directly affects whether the appearance of the entire decoration is clean and intact, which requires us to be comprehensive and meticulous during the acceptance process. However, we can apply for Tubatu Decoration Insurance, which is a professional decoration insurance Decoration supervision can make the acceptance of masonry work more comprehensive and detailed!

The relevant content of the masonry construction sequence is introduced here. Many people are not clear about the masonry construction sequence, so they are not sure when Start preparing construction materials, etc. The editor introduces the general sequence of masonry construction to everyone in the article. I believe it will be a reference for everyone. Friends who are renovating can also estimate the progress of the masonry construction in their own homes. .

For more decoration-related content, please continue to pay attention to Tubatu Learning Decoration. The editor will continue to provide you with more content.

Tubatu provides you with "each decoration quotation, 1-4 local decoration companies, 3 sets of decoration design plans" for free online, as well as decoration avoidance strategies! Click this link:/yezhu/zxbj-cszy.php?to8to_from=seo_zhidao_m_jiare&wb, and you can get it for free~