Joke Collection Website - Talk about mood - Responsibility book for traffic safety of muck transportation

Responsibility book for traffic safety of muck transportation

Responsibility book for traffic safety of muck transportation

In order to maintain traffic order, ensure the safety of the state and people's property, ensure that the unit does not have traffic accidents, reduce general traffic accidents and violations, and put an end to serious violations, this traffic safety responsibility book is formulated as follows according to traffic regulations and relevant systems, regulations and methods of safety work of the project department:

1. During the project construction, I will ensure that no traffic accidents and traffic violations will occur;

Second, consciously abide by traffic laws and regulations, ensure that traffic safety laws and regulations and safety knowledge are carefully studied, and improve traffic legal concept and safety awareness;

Third, strengthen self-cultivation, improve professional ethics, adhere to safety and courtesy, and drive at a medium speed: do not drive too fast, do not forcibly overtake, do not be driven by non-drivers, and do not drive fatigue after drinking.

Four, consciously abide by traffic laws and regulations, maintain traffic order, obey the traffic police command, support the traffic police to enforce the law, violations should be dealt with according to law.

Five, strictly control the safety of vehicles, timely maintenance and safety inspection of motor vehicles, especially professional transport vehicles and their drivers. It is necessary to check the vehicle condition and safety performance on time, and vehicles with potential safety hazards are prohibited from going on the road.

Six, it is strictly prohibited to overload vehicles, overcrowding, speeding, keep the vehicle license plate complete and clear, and put an end to serious illegal acts such as drunk driving, fatigue driving and running red lights.

7. Study driving skills hard, learn safe driving experience, and abide by operating procedures. Adhere to the inspection and regular maintenance of the vehicle before and during driving to ensure that the vehicle capacity is in good condition.

Eight, when the vehicle leaves, the body tires should be cleaned. , and lock the cargo hopper to prevent spilling after leaving the venue.

Ten, in the construction site, the speed shall not exceed 5 km/h..

Eleven, during the period of construction, to someone on duty every day, do someone answer the phone at any time, traffic accidents and emergencies reported in time.

Twelve, strictly implement the responsibility system for traffic safety, because the responsibility is not implemented, the occurrence of major traffic accidents, will be strictly in accordance with the "Beijing major road traffic safety accidents administrative accountability provisions" to be held accountable.

The driver in charge of the unit

Signature: signature:

Year, month, sun, moon, sun.

Chapter II: Agreement on Safety Responsibility of Dregs Transportation Party A (the construction unit):

Party B (investment partner):

In order to strengthen the safety construction management of muck transportation, the working principle of "safety first, prevention first and comprehensive treatment" is earnestly implemented to prevent accidents and ensure the safety of people's lives and property. According to the Law of People's Republic of China (PRC) on Safety in Production, Regulations on the Administration of Safety in Production of Construction Projects, Law of the People's Republic of China on Road Traffic Safety, Regulations on the Implementation of the Law of the People's Republic of China on Road Traffic Safety and other relevant laws and policies, this agreement on responsibility for safety in production of muck transportation is signed by both parties through consultation.

I. Responsibility of Party A

1. Timely convey and inform the important instructions and requirements of relevant functional departments on safety production, and urge Party B to implement safety construction.

2. To urge Party B to rectify the acts that violate the operating rules for safe production.

3. In case of a safety accident, in addition to timely reporting to the police, it is necessary to report to the relevant functional departments at the first time, and the accident shall not be delayed or concealed. At the same time, protect the site, maintain order, and organize forces to cooperate with relevant departments to do a good job of disposal.

4. If a third party or relevant department requires Party A to bear the corresponding responsibilities due to Party B's delay in performing the compensation responsibilities under this contract, Party A has the right to pay in advance, and the payment on behalf of Party B shall be directly deducted from the repurchase funds payable to Party B. ..

II. Responsibility of Party B

1. Party B shall earnestly implement the laws and policies related to safety in production, such as People's Republic of China (PRC) Law on Safety in Production, Regulations on Safety in Production of Construction Projects, Law of the People's Republic of China on Road Traffic Safety, and Regulations on the Implementation of the Law of the People's Republic of China on Road Traffic Safety.

2. Party B shall establish and improve the safety production system, establish the responsibility system with the legal representative as the first responsible person, improve emergency rescue measures, ensure safe construction, and ensure that the organization is guaranteed, the tasks are required, the work is inspected, and preventive measures are taken.

3. Clear the responsibility for production safety of muck transportation, and sign the responsibility letter for safe and civilized construction with the project leader.

4. Before construction, we should go to the muck office in our district according to the documents [20 13]5 and [20 13] 16, handle the approval documents of construction muck and the transportation route signs of construction muck and gravel in time, strictly use the qualified vehicles of muck transportation enterprises (fleets) in the catalogue of control platform, and install GPS and driving recorder as required.

5. The site should make full use of the existing road transportation, and the bridges and culverts, temporary bridges, underground pipelines and structures along the road should have sufficient foundation bearing capacity to meet the transportation requirements. Before transportation, investigate and check the stress when necessary to confirm safety; The clearance across bridges and culverts and overhead lines shall meet the traffic requirements.

6. Closed vehicles should be used for muck transportation, and the exposed dirt and sundries of vehicles should be removed after soil loading; Transportation within the venue shall be at a specified speed (not exceeding 20km/h) according to the traffic volume, road conditions and surrounding environment.

7. Temporary transportation roads should be laid on the construction site according to the engineering characteristics and environmental conditions, and should be confirmed before transportation; In the process of construction, special personnel shall be assigned for maintenance and management, so as to keep the road unblocked and free from frost boiling and dust.

8. Party B shall not commit any of the following acts during the construction of muck transportation: drivers driving without a license, fatigue driving, drunk driving, overloading, speeding and illegally carrying passengers; Sediment transport vehicles do not follow the prescribed route, the speed is uneven, fast and slow, and the load is missed; Motor vehicles and wheeled machinery running on social roads and highways do not conform to the relevant provisions of the Road Traffic Safety Law of the People's Republic of China and the Regulations for the Implementation of the Road Traffic Safety Law of the People's Republic of China; When driving on the road at the construction site, do not comply with the management regulations of traffic signs such as speed limit at the site; On-site road laying does not meet the relevant requirements.

9. Actively cooperate with the supervision, inspection and guidance of relevant departments. For the existing problems, it is necessary to formulate rectification plans such as rectification measures, financial guarantee and completion date, take effective measures in time to eliminate potential safety hazards, submit written materials for safety inspection and rectification within the specified time, and submit written rectification to Party A. ..

10, strengthen construction site management, and improve various safety protection facilities and warning signs. In the event of a safety accident, immediately organize forces to rescue, put an end to casualties to the maximum extent, report the accident in time, and do not delay or conceal the accident. After the safety accident, it is necessary to protect the site, actively cooperate with relevant departments to do a good job in investigation and evidence collection, and do a good job in the aftermath in accordance with responsibilities and relevant regulations to eliminate potential safety hazards.

1 1. Party B shall take full responsibility for safety accidents that cause personal injury to drivers and third parties during construction and transportation.

12. Party B shall bear all losses caused to municipal roads, highways, buildings and visible objects on the construction site during the transportation of muck.

13. During the construction and transportation, Party B shall be responsible for the fines imposed by the relevant departments due to illegal acts such as vehicle dripping and leaking, which affect environmental sanitation and site civilization.

14. If a third person or relevant department requires Party A to bear corresponding responsibilities due to Party B's delay in assuming the above responsibilities, Party B shall pay liquidated damages to Party A, and Party B shall pay liquidated damages of RMB10,000.00 Yuan to Party A. ..

Three. Other agreements:

Party B shall strictly implement the Notice on Strengthening the Safety Management of Construction Waste Sand Transportation Enterprises (Fleet) issued by the Construction Waste Sand Transportation Management Office (for Trial Implementation).

Four. As an annex to the BT investment and construction repurchase contract or investment and construction cooperation contract, this muck transportation safety responsibility agreement is valid until the project completion acceptance contract.

This liability agreement is made in quadruplicate, with Party A and Party B holding two copies respectively.

Party A (construction unit): Party B (investor):

Legal representative or authorized representative: legal representative or authorized representative:

Date of signature: year month day.

In order to strengthen civilized construction management, enhance corporate image and improve the surrounding environment, our company promises to do the following work during excavation:

1. Hang the muck management responsibility card at the eye-catching place outside the gate of the construction site, indicating the person in charge of muck and the contact telephone number to ensure that the telephone number is open 24 hours a day.

2. The person in charge of muck should wear armbands on duty at the scene, strictly observe the duty discipline, stick to their posts, earnestly perform their management duties, and ensure that the construction vehicles are free of mud and dust pollution on the road.

3. Set up flushing facilities that meet the specifications and ensure that they can be used normally at any time.

4. Equipped with at least 4 full-time cleaners, wearing uniform logo armbands and safety vests, responsible for cleaning the vehicles entering and leaving and cleaning the crossings.

5. Car wash signs should be set at the gate of the construction site. Vehicles entering and leaving the construction site must pass through the car wash tank and be thoroughly cleaned by the management personnel before they can drive out of the site.

6. Dust pollution.

7, car wash tank, washing platform, sedimentation tank and other drainage facilities in a timely manner, to ensure smooth drainage, dry weather sprinkler dust in time, to prevent the construction vehicles driving on the spot caused by sewage is not directly discharged into the municipal pipe network.

8, in and out of the crossing timely cleaning, no dust, muck and other pollution.

9. Formulate emergency plans for dust and road pollution accidents, and reserve corresponding emergency disposal facilities at the site. In case of pollution accidents, start emergency plans in time for proper disposal, so as to reduce and eliminate the impact on the urban environment in the shortest time.

Commitment unit (seal):

Commitment (signature):

Chapter IV: Safety Responsibility Letter (Transport Team)

Responsibility book for safety production of transportation team

In order to seriously implement our company's safety production policy of "safety first, prevention first and comprehensive treatment", put an end to illegal production and all kinds of safety accidents and realize safety production. Effectively strengthen traffic safety management, prevent and reduce traffic accidents, curb the occurrence of serious traffic accidents, and ensure the safety of transport vehicles in this project. According to the spirit of provincial, municipal and local documents, this project department signed the following safety responsibility letter with the transportation team.

1, take effective measures to ensure the completion of the following indicators:

(1) The accident rate of death, serious injury and minor injury in this project is zero;

(2) The accident rate of transport vehicles is zero;

(3) The training rate and qualified rate of safety education for transport vehicle drivers are100%;

(4) The illegal command operation rate of transport vehicles is zero;

(5) The post hazard notification rate and driver awareness rate are 100%.

2. The captain of the transport team is the first person responsible for vehicle safety and is fully responsible for the safety production of transport vehicles. The captain of the transport team should fully implement various safety management systems, sign safety responsibility letters at different levels, and put the responsibility on people and vehicles.

3. Strictly implement the guidelines, policies, laws, regulations and systems of the company, local governments and relevant units on safety production, as well as the safety production system, procedures and responsibility system formulated by the project department.

4, responsible for the scientific management of vehicles, rational use, regular maintenance and repair, establish and improve the vehicle transport safety management system, regular inspection and supervision, engineering transport vehicles must have a complete and effective registration, driver's license, insurance and other procedures. It is strictly forbidden to hire people without driving licenses to engage in transportation.

5. Transport vehicles for engineering muck and gravel must meet the requirements of Construction Waste Transport Vehicle Technology and Transportation Management (DB3 1/T398), and be equipped with airtight sealing device and secondary airtight tarpaulin. Vehicles transporting construction waste must carry out regular technical inspections to ensure that they meet technical standards. A yellow rotating light is installed above the cab of the muck truck, with two yellow stripes across the trunk, with a height of 15 cm and a gap of 20 cm in the middle of the car body; In front of the cab, there is an approval certificate for the transportation of engineering muck and gravel, and the names of transportation enterprises or construction enterprises are printed on the doors on both sides; Spray-print the self-number of enterprise vehicles under the door; The approved load of the vehicle is printed on the side plate of the container; Vehicles must be equipped with turning information and voice prompt devices, as well as GPS satellite positioning monitoring system with driving recorder.

6, comprehensively do a good job of daily vehicle inspection, to ensure that the vehicle technical condition is good, safe, complete and effective fire control facilities. According to climate change and actual road conditions, vehicles are required to be equipped with driving equipment in time to ensure driving safety.

7, the captain of the transport team should strengthen the education of drivers, improve the driver's safety awareness and service awareness, to ensure that the car is clean and tidy.

8. It is forbidden to overload and overspeed transport vehicles, and drivers are prohibited from drunk driving and fatigue driving. Vehicles must travel according to the prescribed time and route, and there shall be no leakage during transportation.

9. Do a good job in statistics and reporting of muck and gravel transportation. Actively cooperate with law enforcement officers to investigate and deal with transportation violations.

10. All vehicle fleets must attend the regular safety meeting of the Project Department and actively participate in various safety activities organized by the Project Department.

1 1. The Project Department will organize and implement the vehicle safety inspection of this project from time to time. Those who do not meet the site regulations will be severely punished and cleared out.

The transportation team shall be responsible for the consequences and economic losses caused to the company's safety work due to dereliction of duty or failure to implement the above terms. The project department is not responsible.

Captain of transportation team (signature): person in charge of project department (signature):

Year, month, sun, moon, sun.

Article 5: Responsibility letter for the safe driving of the dredger: Earth moving unit (Party B) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In order to strengthen the safety management of earthwork backfilling construction in Tong Jia Comprehensive Insurance Zone and ensure the safe and smooth traffic during the construction period, our project manager (Party A) puts forward the following requirements for your company:

1. Party B shall improve the traffic management organization, separate it from the safety management network, and strengthen the traffic safety education for vehicle drivers, site construction machinery workers and all personnel. Establish a vehicle and driver account, which meets the requirements of the Development Zone and Nanjing for muck vehicles and transportation management, and make account registration and daily records.

2. Party B shall abide by the traffic rules and drive at the traffic lights; Driving safely, not speeding, running red lights and borrowing cars;

3. It is forbidden to drive illegally, such as drunk driving, fatigue driving and driving with illness. The punishment caused by illegal driving shall be borne by Party B, and the traffic accidents caused thereby shall be borne by Party B;

4. The earthwork transport vehicles shall travel in strict accordance with the prescribed route, and Party B shall send special personnel to the spoil ground to direct the spoil. After the earthwork is unloaded, all the vehicles can be left behind before driving. When the vehicle comes out, it should be washed urgently, so that it can go on the road without soil, otherwise the punishment caused will be borne by Party B;

5, strengthen the daily maintenance and maintenance of vehicles, it is forbidden to drive in spite of illness. Before leaving the vehicle, the vehicle shall be inspected to prevent scattering, dripping and polluting the road surface along the way. If traffic accidents are caused by the failure to inspect the vehicle, Party B shall bear them by itself;

Statement:

Party B promises: I sign here to show that I have read the agreement and agree to abide by the provisions and requirements in this agreement. I promise here!

Matters not covered shall be settled by Party A through negotiation!

Project management unit (signature): earthwork transportation unit (signature) year month day.

;