Joke Collection Website - Talk about mood - How to write the procedures for handing over electric boiler equipment to the school?

How to write the procedures for handing over electric boiler equipment to the school?

Document preparation, handover procedures, etc.

1. document preparation: before handing over the electric boiler equipment to the school, ensure that the relevant documents are complete and tidy up. List all the information of electric boiler equipment to be transferred, such as name, model, specification and quantity. Provide corresponding inspection reports to prove that the batch or each electric boiler is qualified.

2. Handover procedures: After completing the necessary documents, the following procedures can be performed. Both parties shall sign a formal receipt confirmation (called "Goods Handover Certificate") at the legal time and place, record the date and time, standardize the names and positions of the winners, and make it public through mutual badge verification.