Joke Collection Website - Talk about mood - How long is Hangzhou Metro Line 3? How many sites are there? When will it be completed and opened to traffic?

How long is Hangzhou Metro Line 3? How many sites are there? When will it be completed and opened to traffic?

Hangzhou is building a subway, which is about 57.7 kilometers long and has 39 seats. Does it pass by your place?

I believe that with the establishment of New China, many people have also found the improvement of living standards, and the rapid improvement of economic strength in major cities has attracted the attention of the government. Of course, many people also buy private cars just to make it easier for them to travel. However, due to the increase in the number of domestic cars, the traffic pressure in developed cities has increased. Faced with this situation, major cities have invested a lot of money and energy to build public transportation to ease traffic congestion and solve many problems in people's lives.

At the same time, an interesting question arises accordingly. The stronger the economic strength, the more obvious the traffic pressure in the city. After all, there are so many people living in cities. As a province with very strong economic strength, the most developed city in Zhejiang belongs to the provincial capital Hangzhou. The beautiful scenery of "there is paradise above and Suzhou and Hangzhou below" makes Hangzhou a very famous tourist city, which inevitably leads to great traffic pressure in the city. In order to reduce the traffic pressure, the construction of public transport lines is also imminent.

The first subway was opened on 20 12, and now several subway lines have been built. At the same time, Hangzhou has also made some plans for urban rail transit. 10 track line+/kloc-0 track express line +2 city lines will be built when the Asian Games comes, which will be more conducive to people's travel. Today, I will introduce you to a subway line under construction, called Hangzhou Metro Line 3.

In fact, it is divided into main lines and branch lines. As can be seen from the engineering drawings, the total length of the first phase project is about 52.9 kilometers (including branch lines), and there will be 39 stations along the way (38 underground stations, 38 elevated stations 1 seat). Because this line is relatively long, it was not put into construction until 20 18, and it is expected to be completed on 202 1, with an investment of 377.59.

1 billion yuan. It can also be seen from here that the construction period is still very tight, and the time is tight and the task is heavy, which also has a very strong pressure on the construction workers.

The logo color of this subway line is lemon yellow, which will show a Y-line trend after operation. In the future, Science and Technology City, West Residential Area and Beixin Residential Area will be successfully connected to facilitate people's travel. At the same time, it can also improve the subway network in Hangzhou. To enhance the image of Hangzhou, I wonder if you have any expectations for this route?

Hangzhou is building a subway with a length of 52.9 kilometers and an investment of 37.759 billion yuan.