What is the construction process of the mixed plastic runway system? Who can briefly talk about his steps?
1. Determine the construction scope of the plastic runway, mark it, and then thoroughly clean up the site, so as not to leave dust to affect the later construction. After it is completely dried, the next step of construction can be carried out.
2. Repair uneven places to make them smooth; Then the cement should be waterproof and coated with a waterproof material.
3. After curing and curing for 24 hours, the bottom layer of the runway can be laid, and the all-plastic buffer layer can be laid after the two-component adhesive, PU material and black rubber particles are evenly mixed.
4. Test the relevant data of the upper buffer layer to ensure the engineering quality. Fix the problem after it is found.
5. Mix the runway topcoat according to a certain proportion, add the catalyst and EPDM color particles, stir them evenly, spray them in the same direction with a spray gun inclined at 60 degrees, keep them for 24 hours, and then spray them in the opposite direction.
6. After more than 48 days of maintenance and repair, it can be marked according to the standard runway specifications.
7. Clean up the construction site and evacuate, and it can be put into use in 0/5 days after maintenance.
xiexielo!
- Related articles
- Good words and sentences about pond
- How about the new energy in Jiangsu Jenny? Let's talk about it in all aspects and add points to good answers.
- What are the temples built on the cliff?
- How to write Weibo?
- An interesting and sad conversation
- A sentence that can save a marriage the most.
- What is the explanation that I am still beautiful without you?
- Life after retirement is wonderful.
- The mini-world is speechless and funny.
- Reflections on Watching the Revolution of 1911