In the progressive society, we use meeting minutes more and more in many affairs, and the meeting minutes are generally written in the third person. What are the minutes of the meeting that you have been exposed to? The following is a sample essay on the minutes of the site quality meeting I collected for you, hoping to help you.

minutes of site quality meeting 1

meeting time: 14: p.m. on December 13th, X

meeting place: meeting room of the second phase site

meeting host: Wang Lijiao

participants:

construction unit:

supervision unit:

construction unit

meeting content: < Introduction of Party A's on-site representatives:

(1) Construction unit: civil engineer

(2) Supervision unit: chief supervision engineer

(3) Construction unit: project manager of Zhongji Company, chief engineer of Zhongji Company and production manager of Sixth Construction Project

2. Before the Spring Festival, the main personnel of each unit are not required to attend the meeting.

3. From December 19th to 21st, X year, centralized drawing review will be arranged, and Party A will provide accommodation, and shall not leave halfway, and the transportation will be solved by itself. First gathering time: 9: 3 am on December 19th, X, in the lobby of Beijing Oriental Guest International Hotel. Materials to be prepared: my ID card, common specifications, atlas, paper, pen and calculator.

4. All units of large-scale drawing review should attach great importance to it, require competent civil engineering, water and electricity engineers to participate, and try out unreasonable and wrong positions.

5. It is required to make good preparations for construction years ago, including construction roads, carpentry sites, overlay finishing, division of construction flow sections, and inspection of concrete manufacturers. The procedures for reinforcing bars and erecting towers shall be reported to the supervision company.

second, the construction unit reports the production plan:

(1) Production plan:

1. Construction of the tower foundation of Building 9 (December 15th-3th).

tower crane installation in buildings 2, 6#7#8# (December 2th-3th).

foundation cushion construction of 3 and 9# buildings (December 25th-3th).

4. On-site road construction (January 5th-1th).

5. Dormitory maintenance in living quarters (December 15th-25th).

the garage on the south side of 6 and 9# buildings will return to the top (December 15th-18th).

7. The site will be cleared (December 25th-January 1th).

(2) Personnel arrangement:

There are 6 construction personnel at the site, and they will be deployed from other projects at any time according to the construction progress to ensure production.

(3) Material mobilization plan:

1. Support bowl buckle is planned to be mobilized on December 14th.

2. The foundation thermal insulation curtain is planned to enter the site on December 15th.

(4) Need to cooperate:

Slope protection and earthwork should be improved as soon as possible.

3. Suggestions and requirements put forward by the supervision unit:

1. The construction unit shall submit the quality assurance system, technical assurance system and safety assurance system in time.

2. Submit the general layout plan and mechanical equipment layout plan.

3. The construction unit must provide the construction enterprise with the information of underground pipelines related to the construction site in written form, and the construction enterprise shall take measures to protect all kinds of underground pipelines.

4. Personnel required to attend the supervision meeting:

(1) Project manager, technical director and relevant professionals of the contractor.

(2) the representative of the construction unit in the construction site.

(3) According to the agenda of the meeting, it is necessary to invite subcontractors or relevant personnel to attend.

5. Submit the operation plan of tower group and the safety information of tower crane.

6. The office data and safety data of the construction process are synchronized with the construction progress.

7. Before the Spring Festival, the site construction tasks of the general contractor should be completed, and the temporary facilities should be repaired and the construction roads should be unblocked. Make preparations for the start of construction after the Spring Festival. Minutes of site quality meeting 2

Meeting time:

6: pm on March 4th, 2xx

Meeting place:

Conference room on the second floor of the project department

Participants:

All staff of the project department (attached with the meeting sign-in form)

Moderator:

Li Guangtian

1. On-site project department. The processing area and material stacking area should be partitioned clearly and clearly to meet the requirements of safety, fire control and hygiene. Warning signs, announcements and warning lines should be set up in the construction area, and various safety measures should be taken.

2. Before the project starts, the contractor should make technical disclosure to the construction personnel of this project, establish and improve the safety responsibility system, and make safety disclosure records, safety education and training, and safety systems in strict accordance with the safety technical operation procedures and safety systems for each type of work.

3. Safety work should be put in the first place in the construction process, and the policy of "safety first, prevention first" should be seriously implemented, and safety management should be done well, persisted for a long time and made unremitting efforts; Attention should be paid to the daily maintenance and overhaul of machinery and equipment to avoid injuries to machines and equipment.

4. It is forbidden for idle personnel to enter the construction site at will in the construction area. Construction personnel should enter the site in strict accordance with the requirements of safety regulations, wear safety helmets, and workers working at heights should fasten their safety belts and work in strict accordance with the aerial work procedures. At the same time, they are never allowed to work at their posts after drinking.

5. The safety distance should be well controlled for the construction of external protection, and the sealing should be tight; Grounding and neutral protection system shall be implemented according to the requirements of relevant specifications; Distribution box and switch box should be protected by three-level distribution and two-level, and five-core cable should be used for distribution lines.

6. The lifting equipment (tower crane) must be inspected, calibrated and maintained on the 1st of each month.

7. For the temporary electricity utilization on site, the specifications and detailed rules for electricity utilization shall be compiled, and the distribution box shall be properly erected to ensure no nudity.

8. A special safety construction plan should be prepared for the project with greater risk.

9. Do a good job in pre-job safety training, educational materials and safety technical disclosure records.

1, special operations personnel must hold relevant certificates, no must be filled within the prescribed time limit.

11, the safety system must be implemented to the specific construction.

12, foundation pit excavation must put slope and do a good job in safety protection.

13, aerial work personnel must wear safety helmet, fasten your seat belt.

14, the construction director must pay special attention to the project quality management and site civilization construction management.

I hope that the construction unit should always keep safety in mind during the construction, and never take safety seriously to ensure the safe and smooth completion of the construction. Minutes of site quality meeting 3

Meeting time:

9: , xx, XX, XX, XX

Meeting place:

Meeting room on the project site

Participating units and personnel:

See the meeting sign-in sheet for details

Meeting chair:

Chen

Main contents of the meeting:

The meeting was hosted by the construction unit. The construction unit introduces the preparation for the commencement of the project, and the construction unit reports the preparation for the construction; The construction unit and supervision unit shall put forward opinions and requirements on the construction preparation, and specify the time, place and main participants of the supervision regular meeting on the site.

1. Each contractor introduces the organization, personnel and division of labor of each site (see the appendix for details)

2. Party A introduces the preparation for the commencement of the project and puts forward requirements:

1. This project is supervised by Shanghai Haida Engineering Construction Consulting and Supervision Co., Ltd., and the construction unit is constructed by Zhejiang Dali Construction Co., Ltd., and the design of Zhejiang Shihuacheng Architectural Design Co., Ltd.

2. The site acceptance of the project is mainly supervised by the supervision unit.

3. In the process of construction, the construction unit shall submit an original data to the supervision unit to facilitate the understanding and mastery of the project.

4. The design drawings will be changed, and the design unit will be invited for technical disclosure. After receiving the drawings, the construction unit should take the time to prepare and report the construction organization design and various special construction plans;

Third, the contractor introduces the construction preparation and arrangement:

1. The project manager is responsible for the site management of the construction unit, and Yang Yexin is responsible for the pile foundation.

2. The main roads on the site have been leveled, the fence repair and adjustment have been completed, and the management personnel have been put in place;

3. The pile foundation is planned to be completed in 3 days, the main body in 8 days and the decoration in 5 days.

IV. Opinions and requirements put forward by the chief supervision engineer:

1. Relevant preliminary data of the construction unit should be submitted for review as soon as possible, so as not to affect the construction progress;

2. After the personnel of the quality control system and safety control system of the construction project department are determined, the personnel shall not be changed casually. If there is any change, it must be approved by the supervision unit and the construction unit, and the management personnel of the project department shall ensure the on-duty rate;

3. In the process of construction, the management personnel of the project department should ensure that they are on duty, and the project acceptance should be signed by the full-time quality inspector on the basis of self-inspection and reported to the supervisor for acceptance;

4. Do a good job in the construction plane design reasonably, and the layout of office and living quarters, construction and processing sites, and on-site water and electricity arrangement should comply with relevant regulations;

5. The site supervision meeting will be held once a month at 9: a.m. on the 1th of each month in the conference room of the project site, and the main managers and technicians of the relevant contractors will attend.

6. In order to ensure the quality and safety of the project, it is suggested that the construction unit should pour column concrete and beam slab concrete separately.

IV. Party A makes a concluding speech:

1. Organize relevant personnel to solve and implement the problems raised by the construction unit on the spot after the meeting;

2. In the future, various meetings and changes require the construction unit to have written reports;

3. The construction unit must carry out all kinds of acceptance on the construction site according to the prescribed procedures;

4. The supervision meeting requires the project manager, technical director, safety director, safety officer and main management personnel of the construction unit to attend;

5. Check the axis of the foundation pit and the building on site, including the distance from the red line and buildings. ;