Activity plan of construction unit quality month
In order to effectively ensure the quality level of activities, it is often necessary to prepare an activity plan in advance. The activity plan is a written plan for the specific activities to be carried out. So how should the activity plan be formulated? The following is the activity plan for the construction unit quality month that I have carefully organized. Everyone is welcome to share. Activity Plan 1 for Construction Unit Quality Month
This plan is specially formulated in accordance with the document requirements of the Ministry of Housing and Urban-Rural Development of the People's Republic of China and the Construction Department of the Xinjiang Uygur Autonomous Region, and in conjunction with the actual project quality management of our city.
1. Guiding ideology
Guided by Deng Xiaoping Theory and the important thought of "Three Represents", thoroughly implement the spirit of the Second Plenary Session of the 17th CPC Central Committee, adhere to the Scientific Outlook on Development, Vigorously implement the strategy of winning with quality, mobilize and guide the majority of construction industry employees to work hard to improve quality awareness, establish the concept of building a harmonious society with people first, form a good environment that attaches great importance to quality management, promote independent innovation, and save construction resources, create high-quality projects, and " With the theme of "Quality and Safety is the Foundation of Social Harmony", we will continuously improve the quality level of our city's construction projects and make new contributions to the rapid and great development of the city.
2. Organizational Leadership
In order to ensure that the "Quality Month" activity of the construction project achieves actual results and all work can be implemented smoothly, a "Quality Month" activity leading group was established.
Members are composed of personnel from relevant units. The leading group has an office located at the Municipal Construction Project Quality Supervision Station, which is responsible for the organization, communication and comprehensive coordination of various activities.
3. Main tasks
(1) Formulate a practical "Quality Month" activity plan and implementation details
All relevant responsible parties of the project must combine " According to the requirements of relevant documents of "Quality Month" and the actual situation of the project, we will formulate practical activity plans and implementation details, carefully arrange and carefully organize and carry out the "Quality Month" activities in 20xx.
(2) Vigorously publicize and popularize engineering quality knowledge
The responsible entities of engineering projects must focus on the theme of "quality and safety is the basis of social harmony" and vigorously publicize and popularize it during the project construction process. Project quality knowledge, further improve the quality awareness of every staff member involved in project construction, and hang banners and banners promoting the content of the "Quality Month" activities at prominent locations on the construction site.
(3) Further strengthen the comprehensive earthquake resistance and disaster prevention capabilities of our city’s buildings
In order to further improve the city’s comprehensive earthquake resistance and disaster prevention capabilities of urban and rural buildings and effectively protect the lives and property safety of urban and rural residents, participate in The construction, survey, design, construction, supervision units and construction drawing review, project quality inspection and other responsible parties of the project construction must further improve their awareness, strengthen management, strictly abide by infrastructure procedures and relevant laws and regulations, and strictly abide by the technical standards and engineering construction standards. Earthquake-resistant requirements, focusing on disaster prevention and reduction, careful survey, careful design, and careful construction to effectively ensure the technical quality level of construction projects.
(4) Further promote the household-based acceptance inspection of residential project quality in our city
Before the completion acceptance of residential projects, the construction unit must organize relevant units to conduct household-based acceptance. , owners (users) should be invited to participate and sign acceptance opinions. The responsible entities for the project should take the household-based acceptance of residential quality seriously, promptly summarize the experience of household-based acceptance, and strive to improve residents' satisfaction with the quality of residential projects.
(5) Further improve the city’s building energy-saving construction quality level and management level
The city’s construction, survey, design, construction, supervision units and construction drawing review, project quality inspection, etc. All responsible entities must attach great importance to the importance and urgency of building energy conservation and emission reduction work, and effectively implement the "Construction Quality Acceptance Code for Building Energy Conservation Projects" (GB50411-2007) and the "Civil Building Energy Conservation Management Regulations" (the People's Republic of China and the Ministry of Construction Order No. 143) and "Notice on Further Strengthening the Quality Management of Building Energy-saving Projects in Karamay City" (Ke Jianfa [20xx] No. 80) and other relevant standards and normative documents to further improve the construction quality management of all aspects of energy-saving projects system, promptly strengthen technical training and exchanges, actively promote technological innovation, continuously enhance the ability of construction units to ensure the quality of energy-saving projects and improve technical levels, ensure the quality of building energy-saving projects, and resolutely prevent certain construction units from explicitly or implicitly violating the regulations of design units and construction units. Mandatory standards for building energy-saving design, construction units did not formulate special energy-saving construction plans, did not strictly follow energy-saving design and energy-saving building structure atlas, and supervision units did not have adequate management.
(6) Further deepen the quality management of survey and design
All responsible parties in construction, survey, design, construction drawing review and other parties must enhance quality awareness, further implement quality responsibilities, and ensure Survey and design quality. The Ministry of Construction and the Autonomous Region Construction Department plan to carry out survey and design quality inspection work in the second half of 20xx. It is hoped that all survey and design units in the city will combine the "Quality Month" activities and conscientiously implement relevant laws and regulations on construction project quality and mandatory technical standards for project construction. In particular, we must pay attention to the seismic fortification design and building energy-saving requirements, and be prepared for inspections.
IV. Activity Requirements
(1) Strengthen leadership and effectively carry out various tasks of the "Quality Month" activities. All district construction bureaus must strengthen leadership to carry out the "Quality Month" activities. Take this opportunity to strengthen the supervision of weak links in project quality. Focusing on strengthening the six main tasks of "Quality Month", we will formulate specific activity plans and implementation details, and carry out targeted supervision and inspection. At the same time, all enterprises must attach great importance to it, conduct self-examinations against the contents of this plan, and make serious preparations for inspections.
(2) Highlight the theme and carry out extensive publicity and education activities in various forms
All relevant units and construction enterprises should actively expand the "Quality Month" activities around the theme of "Quality Month" The publicity and scope of influence must go deep into enterprises, grassroots levels, and the masses for extensive mobilization. You can use the Internet, TV, newspapers and other news media to promote and popularize engineering quality knowledge and build momentum for the "Quality Month" activity. It is necessary to organize enterprises to carry out theme discussion activities to promote the continuous improvement of project quality levels.
(3) Address both the symptoms and root causes, and consolidate and expand the results of the "Quality Month" activities
All district construction bureaus should further increase the implementation of engineering quality laws, regulations and technical standards, and promote the integrity system Construction, enhance the quality responsibility awareness of all parties, and standardize quality management behaviors. During the activity month, any violations of laws and regulations and projects of poor quality discovered must be strictly investigated and dealt with and exposed in the media. Units with effective organization and remarkable results should be praised.
(4) Carefully summarize and prepare for the next step of work
Carrying out the "Quality Month" activity of construction projects is a phased inspection of the quality management of the recent phase of projects in each district. All relevant units and construction companies must promptly summarize the problems discovered, carefully rectify them, and formulate long-term mechanisms in a targeted manner, focusing on solving deep-seated problems that affect project quality, and lay a solid foundation for completing construction project tasks.
5. Time requirements
From September 1st to September 25th, it is the work stage for all relevant responsible units to carry out the work in conjunction with the "Quality Month" activity plan.
From September 26th to October 5th, it is the stage for the "Quality Month" activity leading group to inspect the activities of each relevant responsible unit.
After the "Quality Month" activity, all relevant responsible units must carefully summarize the activities, put forward corresponding measures and suggestions, and submit written materials and electronic documents to the municipal construction project quality supervision department before October 10 stand. Activity Plan 2 for Quality Month of Construction Units
1. Activity Theme
Grasping the improvement of quality level and promoting changes in development methods
2. Activity Content
(1) Carry out a vigorous "Quality Month" publicity activity
The county and district housing and urban-rural development bureaus and relevant municipal units should formulate publicity plans, determine publicity content and publicity slogans based on actual conditions , and actively use the Internet, television, radio, newspapers, magazines and other media to vigorously promote quality safety and quality harmony by hanging "Quality Month" campaign slogans and banners in prominent locations, and producing brochures and leaflets. , quality benefit, quality happiness concept and quality management requirements. At the same time, we will promote the laws and regulations on construction project quality and the integrity services of construction enterprises and intermediary agencies, advocate honesty and trustworthiness and quality first in the whole society, vigorously enhance the quality safety awareness and quality responsibility awareness of the whole society, and create a good public opinion on quality. Atmosphere.
(2) Focus on promoting the household acceptance of residential projects
It is necessary to continue to organize the household acceptance of residential projects, go deep into the construction site, understand the implementation situation, and carry out effective organization and coordination in a timely manner , to ensure the smooth progress of all household acceptance work. From the perspective of reducing common quality problems, suppressing quality problems, and improving residents' satisfaction with the quality of residential projects, we will continue to improve the standards and content, procedures and methods of household acceptance, strengthen the quality awareness of market entities, and implement the construction, construction, supervision and other units quality responsibility. At the same time, we must work hard to handle quality complaints, attach great importance to and promptly investigate and deal with the project quality problems reflected in complaints and reports, not only solve existing problems as soon as possible, but also draw inferences from one example and carry out targeted management. It is necessary to continuously improve working methods, actively explore and use market-oriented means, and establish a mechanism to resolve quality complaints and disputes.
(3) Do a good job in the construction of school safety projects and people's livelihood projects
This year, the reinforcement of primary and secondary school buildings in our city has been fully launched. Some school building projects are currently under construction. In order to ensure school safety projects Regarding quality, it is scheduled to organize a quality inspection of school safety projects in the city in mid-September, focusing on the inspection of the responsible parties of the project construction, the construction drawing design document review agency and the project quality inspection unit's implementation of the national mandatory technical standards for project construction. The method of combining on-site inspection with physical random testing, engineering control data verification and quality behavior inspection of the responsible parties involved in the construction will take the construction of school safety projects as a measure to promote the "Quality Month" activities. At the same time, affordable housing, urban Road reconstruction projects and other projects involving people's livelihood projects are included in the key supervision content. All county and district construction bureaus should strengthen supervision and increase the frequency of supervision and inspections to ensure the quality of people's livelihood projects and key projects.
(4) Carry out extensive and in-depth quality self-examination activities
During the "Quality Month" activity, the construction, construction, supervision, design, and survey of all projects under construction The responsible entities of all parties must conduct a comprehensive quality self-inspection of their respective projects from the perspective of "quality is life", focusing on the specification of the basic construction procedures of the project, the soundness of the quality assurance system of the responsible entities of all parties, and the implementation of actor responsibilities. ; The implementation and improvement of various management systems and quality control measures; the management of engineering construction technical data; the implementation of process inspection and acceptance systems. In particular, it is necessary to strengthen the assessment of the capabilities of actors in the quality assurance system, strengthen the inspection of the implementation of plan approval and material incoming inspection and inspection systems, and strengthen the inspection of unqualified inspection data and the handling of quality problems.
(5) Vigorously implement the strategy of winning by quality and the famous brand strategy, and further promote the quality-based city development activities through quality month activities.
By organizing enterprises to carry out activities such as quality improvement, honest service, and user satisfaction, we guide and mobilize the whole society to enhance quality awareness, improve the overall quality level of our city, and strive to form a system where the government values ??quality, enterprises pursue quality, and society advocates Quality, a good social atmosphere where everyone cares about quality.
(6) Strengthen the guidance for farmers in villages and towns to build their own houses
Conscientiously implement the Ministry of Construction's "Several Opinions on Strengthening the Quality and Safety Management of Village and Town Construction Projects" (Jianzhi No. 216) In line with the spirit of the Provincial Department of Construction's "Several Opinions on Strengthening the Quality and Safety Management of Village and Town Construction Projects in Anhui Province" (Jianguan No. 332), and in combination with reality, we have established a hierarchical management and layer-by-layer responsible management service system. Increase the promotion and use of general drawings for rural housing construction, and take the "Quality Month" activity as an opportunity to publicize and distribute the "Municipal Rural Housing Construction Project Quality Control Technical Service Guide" in various towns and villages to provide services and technologies for rural housing construction. Provide guidance and participate in the census of dilapidated houses in rural areas, and strive to eliminate hidden quality and safety hazards in rural housing construction.
3. Activity requirements
(1) Strengthen leadership and effectively carry out various tasks of the "Quality Month" activities. All relevant units should assign dedicated personnel to take charge, and use the "Quality Month" activity as an opportunity to strengthen supervision of weak links in project safety and quality.
(2) Highlight the theme and carry out extensive publicity and education activities in various forms. All relevant units and construction companies should arrange the "Quality Month" activities, closely follow the theme of "improving quality levels and promoting changes in development methods", actively carry out publicity activities, popularize engineering quality knowledge, and build momentum for the "Quality Month" activities.
(3) Treat both the symptoms and root causes, and consolidate and expand the results of the "Quality Month" activities. All functional departments should further strengthen the implementation of engineering quality laws, regulations and technical standards, promote the construction of an integrity system, enhance the quality responsibility awareness of all parties, and standardize quality management behaviors. During the activity month, any violations of laws and regulations and projects of poor quality discovered must be strictly investigated and dealt with and exposed in the media. Units with effective organization and remarkable results should be praised.
(4) Carefully summarize and prepare for the next step. Carrying out the "Quality Month" activity for construction projects is a phased inspection of the quality management of the recent phase of the project by all relevant units and construction enterprises. All relevant units and construction enterprises must promptly summarize the problems discovered, conscientiously rectify them, and formulate targeted long-term measures. mechanism, focusing on solving the deep-seated problems affecting the quality of projects, and laying a solid foundation for comprehensively improving the quality of construction projects in our city.
IV. Time Arrangement
The first stage is the publicity and launch stage (September 1 to September 10)
Each unit must follow the task requirements Differentiate with tasks, actively organize publicity activities, and slogans, banners, leaflets, and layouts must be hung in place according to the specified time.
The second stage is the in-depth development stage (September 11th to September 25th)
In accordance with the task requirements, relevant units must actively promote various The work was carried out smoothly, mainly by promoting one system (household acceptance system for residential projects), organizing two inspections (school safety project inspection and people's livelihood project inspection), implementing comprehensive self-examination and self-correction (quality of construction projects in progress), and carrying out a Activities (excellent project observation activities).
The third stage is the summary stage (September 26th to September 30th). All relevant units will report and summarize the implementation of the "Quality Month" activities. Written materials are required and must be submitted before September 30th. Report to the Municipal Construction Committee.
Activity Plan 3 for Construction Unit Quality Month
According to the unified "Notice on Carrying out the National "Quality Month" Activities in 2010" (Guoqiquan [2010] No. 351) of the Ministry of Housing and Urban-Rural Development and other seven ministries and commissions In accordance with the deployment and the requirements of the Municipal Construction and Management Bureau's "Notice on Carrying out the 2010 "Quality Month" Activities of the Construction System" (Xiajiangong [2010] No. 94), our station has decided to carry out from now on "grasping quality level improvement and promoting The construction project "Quality Month" activity with the theme of "Transformation of Development Mode" is hereby notified of the relevant matters as follows:
1. The organization and leadership of our station's "Quality Month" activity
Our station A leading group for the "Quality Month" activity was established to be responsible for the organization and guidance of the "Quality Month" activity for municipal construction projects.
Team leader: Zhuang Yiwei
Deputy team leaders: Zou Zhihong, Cai Senlin, Chen Junfeng (executive deputy team leader), Dai Rongdian
Members: Liu Haitian, Lin Lianquan, Xia Shilin, Lin Liang, Liu Wenruo, Yang Sufan, Fu Xuanzheng, Tang Jin, Lin Qichao, Guo Jun, Huang Sheng, Chen Wenfeng, Zhang Yuanan, Zhan Naizhi, He Boqi, Chen Rongbie, Lin Jindian, Xie Jianhua.
The leading group has offices under it, and the construction project quality supervision and management office of this site is responsible for organizing and implementing it.
2. Activity content and work requirements
1. Carry out extensive publicity and education activities to create a positive atmosphere. Our station plans to organize a "Consultation Day" and observation meeting in September. Each enterprise should give full play to its respective advantages, organize and carry out relevant "Quality Month" activities, actively participate in consultation, publicity, on-site observation activities and engineering quality management job skills competitions carried out by competent and regulatory authorities, and display slogans for "Quality Month" activities, banner to create a good atmosphere of "improvement of quality levels and transformation of development methods".
2. Targeted activities to improve the quality awareness of management and construction site workers. All participating enterprises should pay attention to this year's "Quality Month" activities and formulate specific activity plans and work plans. The main leaders should personally do a good job in organizing the work, and carry out targeted activities based on the actual situation of the unit to improve the quality and safety of the majority of employees. consciousness.
3. Promote, implement and implement the "Several Technical Measures for the Prevention and Control of Common Quality Problems in Store Residential Projects" (Trial). In accordance with the notice requirements of the municipal bureau's "Notice on Promulgating "Several Technical Measures for the Prevention and Control of Common Quality Problems in Residential Projects in Xiamen City (Trial)" (Xiamen General [2010] No. 2), its implementation is on the important agenda, and The Municipal Quality Safety Association and other departments collaborated to organize a number of publicity meetings and training courses to enable all supervisors to learn and master the relevant requirements of the "Several Technical Measures for the Prevention and Control of Common Quality Problems in Residential Projects in Xiamen", creating a basis for the trial implementation after October 1 condition.
4. Participate in the filming and production of two themed promotional videos, "Autoclaved Aerated Concrete Block Application Project" and "Construction Safety of Fastener Steel Pipe Support System for Tall Formwork Projects", and publicize them throughout the city.
5. Enterprises carry out self-examination and self-correction on the quality and safety of construction projects. Through inspections, problems in project quality and construction safety are promptly discovered and rectified. In particular, it is necessary to strictly implement common quality problem prevention and control technologies and construction standards for energy-saving construction projects; residential projects are constructed and declared for acceptance in accordance with the requirements of the city's household acceptance system; municipal bridges, etc. must be resolutely eliminated Project quality issues and major construction hazards in large public buildings.
6. Supervisory agencies carry out special inspections. Our station will carry out targeted and in-depth implementation of technical measures to prevent and control common diseases, random inspections of quality deviations of steel bars used in reinforced concrete, and special inspections such as the use of aerated concrete. The quality problems and hidden dangers discovered during the inspection must be rectified and rectified. Any violations found shall be dealt with in accordance with the law. Supervise to ensure that the "Quality Month" activities are effective and promote the city's project quality level to a new level.
7. Implement the "Safety Technical Specifications for Formwork Construction" and our station's "Notice on Strengthening the Safety Production Management of Formwork Projects" (Xiajian Quality Supervision [2009] No. 38), organize on-site observation meetings, In the formwork construction of housing construction projects (including residential projects) in the city, it is required to use 100*100mm square timber and "U"-shaped jacking to effectively transmit the vertical construction load to the steel pipe support.
8. Promote the household acceptance system. All participating enterprises must combine the Municipal Construction and Administration Bureau's "Interim Provisions on the Supervision and Management of Household Quality Acceptance of Residential Projects" and our station's "Interim Measures for the Supervision and Management of Household Quality Acceptance of Residential Projects" (Xiajian Quality Supervision [2007] No. 33) to learn The Provincial Department of Housing and Urban-Rural Development formulated the "Trial Measures for the Management of Household Quality Acceptance of Residential Projects in Fujian Province" to conscientiously implement the household project quality inspection and acceptance system. All units must carefully sum up experience, reduce common quality problems, suppress quality problems, prevent housing quality complaints caused by common quality problems, improve residents' satisfaction with the quality of residential projects, constantly improve the standards, content, procedures and methods of household acceptance, and strengthen market players. Quality awareness and implementation of market entities’ quality responsibilities.
9. Take "Quality Month" as an opportunity to actively create high-quality and excellent projects. Enterprises should enhance their awareness of excellence and brand awareness, and actively create "Luban Awards" and provincial and municipal excellent quality projects.
10. Conscientiously implement the "Regulations on Quality Supervision and Management of Housing Construction and Municipal Infrastructure Projects" (Ministry of Construction Order No. 5).
3. Each participating enterprise must promptly summarize the progress of the "Quality Month", summarize good practices and results, and submit the summary materials to our site before October 10, 2010. Each supervision department of this station will summarize the summary to the comprehensive management office of the station before October 12.
4. Our site will report on praising companies and projects that have performed well in the "Quality Month" activities, and criticize companies and projects on poor performance.
5. Our station and each district supervision station will implement work linkage during the "Quality Month", and will send people to each other to participate in various activities such as project observation, comment meetings, supervision and inspection.
- Previous article:Help others, please help me look at my horoscope in detail! Grateful!
- Next article:And slogans
- Related articles
- Family court trial process
- Is there a parking charge in Hangzhou Tianyuan Community?
- What do you say in the circle of friends on National Day?
- How is the quality of Fengde pipeline industry?
- Operation Spring Thunder, Operation Ice Breaking, What else?
- What express company is there in the dam yard of Sinan County, Guizhou Province? I'm sorry
- What civilized language can replace swearing?
- Auto repair shop advertising slogan
- What's the difference between poster color and watercolor and gouache?
- Festival Encyclopedia: When is World Reading Day?