What safety precautions should be taken for building concrete?
Ready-mixed concrete should be used on site. Construction in urban areas, residential areas, towns, villages, organs, schools, institutions and other densely populated areas shall not be carried out on-site mechanical mixing of concrete.
2. When the concrete is mechanically mixed on site, the mixing station shall meet the following requirements:
(1) Waste water pretreatment facilities shall be set up at the site.
(2) The concrete mixer, various silos, raw material conveying and metering devices shall be arranged at the site according to the provisions of the construction organization design, and transportation and fire-fighting passages shall be formed.
(3) The mixing station shall be equipped with fire control facilities according to the regulations of the fire department.
(4) The on-site concrete mixing station should be set up separately, with good power supply, water supply, drainage, ventilation and other conditions and environmental protection measures, and enclosure should be set around it.
(5) Mechanical and electrical equipment, such as mixers, should be provided with sheds with rain (snow) and wind-proof functions.
(6) The operation of the mixing station should be stable, the installation should be firm and placed on a solid foundation.
(7) A mechanical operation program card should be set beside the mixer and other machinery.
(8) Mixers, conveying devices, etc. Should be intact, protective devices should be complete and effective. Electrical wiring shall meet the specific requirements of relevant safety technical disclosure.
(9) Before construction, the mixing station shall be designed for construction. In the process of mixing cement concrete, the strength, stiffness and stability of support and storage bin should meet the requirements of mixing station load.
(10) After the erection of the mixing station is completed, it shall be accepted, confirmed as qualified, and recorded.
3. All kinds of wires set in the mixing station must be connected and disassembled by electricians. If signs of electric leakage and cable breakage are found during operation, the machine must be stopped and powered off immediately and handled by an electrician.
4. Bagged cement must be transported in an orderly manner from top to bottom. When stacked, the padding should be stable and firm; Stack neatly in layers, and the height shall not exceed 10 bag.
5. The car transportation should be carried out smoothly, and the empty car should let the heavy car not walk.
6. When the car pours sand into the mixer hopper, a protective cover should be set, and it is forbidden to pour.
7. When the operator pours cement into the mixer hopper, his feet are not allowed to step on the hopper.
8. In the process of mechanical operation, mechanical operators should concentrate and not leave their posts; Mechanical failure must be immediately shut down and cut off the power supply.
9. When working in the mixing drum, you must turn off the power supply, lock the switch box, and assign personnel to monitor the mixing drum. It is forbidden to leave your post without permission.
10. Hands, sticks, tools, etc. Do not put it into the mixing drum, or clean the concrete at the drum mouth during the operation of the mixer.
1 1. When the hopper of the fixed mixer moves up (down) on the track, no one is allowed below. When a material is suspended, it must be locked.
12. Management should be strengthened when using additives, and the following requirements should be met:
13. The on-site machine-mixed concrete should be classified as the operation area, and non-construction personnel are not allowed to enter. When the mixer is running, it is forbidden for personnel to enter the storage area and under the discharge hopper.
14. Landing materials and accumulated water should be cleaned in time to keep the site environment clean and tidy.
(1) External additives shall be stored in the warehouse and managed by special personnel.
(2) The special person shall be responsible for the external admixture and use it correctly.
(3) When using additives, the system of picking and issuing should be established.
(4) After concrete pouring is completed, the remaining admixture shall be returned to the warehouse for preservation.
15. After the operation, the mixing site should be cleaned in time, and the wastewater should be discharged to the designated place, so as not to pollute the environment and rivers, and not to block the rainwater and sewage discharge facilities.
- Related articles
- Hi, big dog! What is the temperament of the big dog from Haval? Look over here
- What are building facilities?
- Hand washing seven-step hand washing seven-step hand washing seven-step hand washing
- Auspicious words for renovation work
- Supermarket service slogans and slogans
- I received an inexplicable express delivery with a pack of tissues inside. Should I call the police?
- Recommended routes for flower viewing and outing in Wenzhou Ecological Park in 2022
- How to Let Students Walk into Physical Education Class
- What substance does the red saliva spit by people who like eat areca contain?
- Inspirational couplets and banners for five-character to twenty-one-word college entrance examination