Joke Collection Website - Bulletin headlines - 5 self-examination reports on fire safety work

5 self-examination reports on fire safety work

#report# Introduction As people’s own quality improves, more and more people come into contact with and use reports. Reports include titles, text, endings, etc. The following is a self-examination report on fire safety work compiled, welcome to read!

1. Fire safety work self-examination report

In order to further and better implement the spirit of the winter fire safety work instructions of the provincial, municipal, district governments and the Education Bureau, and establish the safety first ideological concept , nip fire hazards in the bud, and nip possible fire hazards in the bud. Our school did the following work during the self-inspection and self-inspection process.

1. Strengthen leadership and implement responsibilities

First of all, establish a safety work leadership organization with the principal as the leader, with the vice principal as the deputy leader, and the head teachers as the members. The group, from a political perspective and in a spirit of responsibility to teachers and students, puts the school's winter fire safety work in an important position.

Secondly, various rules and regulations have been established and improved to implement a safety work responsibility system based on the principle of who is in charge and who is responsible.

Finally, a safety target responsibility letter was signed level by level, and the work indicators were broken down layer by layer to form a vertical and horizontal winter fire safety work target responsibility network, so that all systems are in place and responsibilities are assigned to everyone.

2. Strengthen publicity and keep the alarm bells ringing

On the whole, the school uses radio to conduct winter fire safety learning lectures for students, and partially uses class blackboard newspapers to popularize winter fire safety. Establish the concept of safety first on an individual basis, and deeply ingrain safety first in everyone's mind, so that unsafe accidents will not occur and unsafe accidents can be responded to in a timely manner.

First, the school organizes teachers and students to carefully study the contents of the safety manual, allowing safety knowledge such as fire protection, transportation, sanitation, and public security to enter the classroom, fundamentally enhancing the safety awareness of teachers and students, Improve self-protection and self-rescue capabilities, attach great importance to national security education and three-prevention education, and do a good job in safety education for catastrophic or unexpected events that may occur in the future.

Second, the school has organized a safety evacuation drill at the end of October to train students to be orderly when going up and downstairs and avoid safety accidents caused by crowding. Logistics assigns a special person in charge to inspect various equipment from time to time. If any damage is found, repair or replace it in time to completely eliminate unsafe factors.

Third, the school should establish a normal safety work information reporting system. Any major incident must be reported to the principal immediately.

3. Improve facilities and transform the environment

The passages to the school’s teaching and living rooms are smooth, and no debris was found piled up in the passages. No combustible debris was found to be piled up around the teaching buildings. material condition. Among them, key areas and various departments were inspected and cleaned up. At the same time, in order to eliminate hidden dangers, the aging lines were replaced and fire-fighting equipment was promptly added. 15 new fire extinguishers were added to the original 28 fire extinguishers, and some special fire extinguisher boxes were added to some key parts of the school. Checked the emergency lights in the building and the safety exit signs at the stairs.

IV. Key parts, key inspections

The heads of each department, especially those with large electricity consumption, have conducted careful inspections, and the logistics staff also conduct regular inspections. , to ensure that there is no leakage and no overload operation.

The above is the specific work done by our school during the self-inspection and self-inspection process. In future work, we will continue to improve various safety systems, improve inspection mechanisms, conduct regular safety inspections, and carry out safety inspections. Conduct evacuation drills and promptly remedy discovered loopholes so that hidden dangers have no place to stand.

2. Self-examination report on fire safety work

1. Attach great importance and implement responsibilities

All units must firmly establish the awareness of "safety first" and attach great importance to Pay attention to the fire safety management of construction sites and thoroughly implement the "Emergency Notice on Further Strengthening Fire Safety at Construction Sites" and the "Notice on forwarding the Provincial Department of Housing and Urban-Rural Development's Notice on Immediately Carrying out the "Look Back, Look Back" Action for Safety and Fire Protection in Construction gt "Notice" document spirit, it is necessary to strengthen organizational leadership and implement institutions, personnel and responsibilities. The company must organize special inspections on a regular basis. The project department must implement a fire safety responsibility system with the project manager as the first responsible person. Safety engineers must lead a team to carry out special fire safety inspections every week. Safety officers must track and eliminate the hidden dangers detected. Ensure fire safety precautions are implemented.

2. Strict standards to strengthen fire safety

(1) Strengthen fire safety management at construction sites. Construction sites should establish and improve fire management rules and regulations, implement strict target responsibility management, and implement target responsibilities to every level and every person. Strictly control product procurement, and must use mesh that meets flame retardant requirements to achieve XX purpose and dense mesh safety. A strict fire approval system is implemented for open flame operations such as electrical welding. Operators must hold certificates to work, and fire guardians are set up to implement on-site supervision. When performing open flame operations, you must avoid flammable and explosive items and devices, and carefully clean up the site after the operation to prevent hidden fires. It is strictly prohibited to engage in operations that easily generate volatile gases, such as painting, within the scope of open flame operations; when using volatile materials, their containers should be closed at any time, and wiped cotton yarn and other items should be stored centrally and away from heat sources. Smoking is strictly prohibited within the construction site. It is strictly prohibited to cut and weld on running pipelines, flammable and explosive containers and stress-bearing components. Temporary buildings, warehouses, storage tanks, stockpiles, etc. for various purposes must be reasonably laid out to ensure adequate safe passages and protective distances. Safety passages should be kept clear and clearly marked.

(2) Strengthen the management of activity room construction. The design, production, installation, disassembly and use of mobile homes must be strictly carried out in accordance with the requirements of the "Technical Regulations for Temporary Buildings at Construction Sites" and in compliance with the "Chengdu Interim Regulations on the Management of Temporary Light Steel Structure Prefabricated Mobile Homes at Construction Sites" 》requirements. The installation of mobile homes should comply with the following fire protection requirements:

1. Fire escapes should be set up around the mobile home site, with a width of not less than 4 meters, and fire water sources.

2. The distance between movable rooms and flammable, explosive, hazardous materials and other dangerous sources should be no less than 16 meters, and canteen rooms and dormitory rooms should be set up separately.

3. For two-story mobile houses, when the building area of ??each floor is greater than 200 square meters, at least two safety exits or evacuation stairs should be provided; when the building area of ??each floor is not greater than 200 square meters, m and the number of users on the first floor does not exceed 30, only one safety exit or evacuation staircase may be provided. The distance between movable buildings should not be less than 3.5 meters.

4. Prefabricated houses should not be built more than two stories, and their fire resistance level must meet the requirements of Level 4. When it exceeds two stories, it should be implemented in accordance with the current national standard "Code for Fire Protection Design of Buildings" gb50016.

5. Decorative materials such as wall panels and doors of mobile homes should meet fire protection requirements.

6. Every 100 square meters of mobile homes should be equipped with at least two fire extinguishers with a fire extinguishing level of no less than 3a, and fire places such as kitchens should be appropriately increased.

7. The installation of electrical circuits in mobile homes must comply with specification requirements:

First, all electrical circuits should be exposed through flame-retardant pipes.

Second, lamps and lanterns must be kept at a safe distance from the board wall. When wires pass through the color steel sandwich board wall panels, they must be covered with porcelain tubes or other non-combustible plastic tubes.

Third, intelligent power limiters should be installed on distribution lines. The lighting circuit should be separated from the socket circuit, and the socket circuit should be equipped with a leakage protector. Prefabricated houses with three floors or a single building area exceeding 200 square meters must be equipped with intelligent electrical appliances.

(3) Strengthen the management of use of activity rooms.

After the mobile home is installed and before it is officially used, acceptance should be carried out, and acceptance information such as the mobile home factory certificate, installation completion acceptance form, mobile home product fire inspection report, etc. should be provided. During use, personnel education must be strengthened and the following fire prevention measures must be implemented:

1. It is prohibited to use rice cookers, electric stoves, electric heating cups, electric rods and other electric heating appliances in mobile rooms.

2. It is strictly forbidden to pull or connect wires in the mobile room.

3. It is strictly prohibited to pile up flammable and explosive items in the mobile phone charging area.

4. Prefab houses cannot be used as dangerous goods warehouses or power distribution rooms.

3. Strengthen education and improve fire safety awareness

Construction units should regard fire safety education as an important part of the "three-level education" on the construction site, and comprehensively popularize fire protection laws, regulations and applications. Common knowledge on fire, electricity and gas use enables employees to understand fire protection requirements, enhance fire protection awareness, master fire protection knowledge, abide by fire protection regulations, improve self-prevention and self-rescue capabilities, actively carry out group prevention and group treatment, and create a "understand fire protection, pay attention to fire protection, and participate in" "Firefighting" social atmosphere to prevent fire accidents.

IV. Strengthen supervision and investigate fire hazards

It was decided to carry out special inspection activities on fire safety at construction sites in our city. The activity will take two months from xx to xx, 20XX. time to conduct inspections and rectification of fire safety hazards at construction sites across the city.

All construction, supervision, and construction units must immediately organize personnel to conduct comprehensive self-examination and self-correction on the construction site, focusing on the setting up of fire protection equipment and facilities, the management of flammable materials on the construction site, and the fire prevention management of mobile houses. , Check the safety of electricity used in temporary construction and whether the workers' work complies with the operating procedures. Once a fire safety hazard is discovered, it must be eliminated immediately to ensure that no blind spots or loopholes are left in the inspection.

The construction bureaus, municipal safety supervision stations, and municipal quality supervision stations of all districts (cities) and counties should strengthen the supervision and management of fire safety at construction sites. First, they should carry out special inspections of fire safety at construction sites based on the characteristics of the region. activities; the second is to review the start-up conditions, and strictly review the relevant design, installation, acceptance, and handover materials of the mobile houses during the review of the start-up conditions; the third is to strengthen daily supervision and management, and urge comprehensive inspections and inspections of the construction site Eliminate fire hazards. When fire hazards are discovered, they must be supervised and corrected on the spot. Relevant responsible units and responsible persons who fail to make rectifications will be seriously investigated and dealt with. At the same time, bad behaviors will be recorded in accordance with the "Implementation Rules for the Management of Bad Behavior Records of Entities in the Construction Market in Chengdu". Manufacturers of prefabricated houses that fail to meet fire requirements and cause fires shall make public announcements.

Please report the summary of the special inspection activities for fire safety at construction sites to the Quality and Safety Department before xx, xx, from the construction bureaus, municipal safety supervision stations, and municipal quality supervision stations in all districts (cities) and counties.

3. Self-examination report on fire safety work

In accordance with the deployment of the Education Bureau’s "Implementation Plan for Special Management of Fire Safety Evacuation Channels and Safety Exits in densely populated places", our school has formulated the " Special Governance Work Plan" and conducted a self-examination on July 16. The self-inspection situation is now reported as follows:

1. Basic situation

The teaching area of ??our school is five floors Building, the office area is four floors and the indoor activity area is seven floors.

1. There are now 12 fire hydrants and 20 hose spray guns (4 are missing).

2. Two fire extinguishers on each floor.

3. Safety exits and emergency evacuation exits are fully marked and located accurately.

4. Safety exits, evacuation stairs, and evacuation passages are not blocked and occupied and locked.

5. There are no iron fences or guardrails on evacuation passages, stairs, safety exits, and external windows in public areas.

2. Problems

1. There are no fire isolation doors on each floor.

2. The number of emergency lights is insufficient.

3. There are no outdoor evacuation stairs.

III. Rectification situation

1. Our school will complete the installation of emergency lighting before August 19, and further improve fire-fighting equipment to ensure sufficient quantity and accurate location.

In 2. In September, we will hold lectures, observations and photo exhibitions on student safety and self-rescue knowledge.

3. Please ask the bureau for assistance in solving fire isolation doors and outdoor evacuation passages.

4. Self-examination report on fire safety work

In order to effectively carry out fire safety work in our town and implement fire safety responsibilities, according to the relevant work arrangements and requirements of superiors, Huangzhong Town The party committee and government attach great importance to fire safety, carefully arrange deployment, and take effective measures. The work is solid and the results are obvious. Through the work carried out, the overall ability of our town to resist fire accidents has been further improved, and the occurrence of larger and major fire accidents has been effectively curbed. The fire situation in the town is stable, creating a good fire safety environment for the successful convening of the xx National Congress of the Communist Party of China. The work progress is now reported as follows:

1. Strengthen organizational leadership and effectively implement the fire protection work responsibility system

Fire protection work is related to the safety of people’s lives and property and social stability, and the responsibility is heavier than Mount Tai. . To this end, we regard firefighting work as a long-term and regular task, and guarantee it with a strong organization. A special leadership group was established with the mayor Wang Yan as the team leader, the deputy mayor Long Lingping and the police station director Li Dashuai as the deputy team leaders, and the heads of relevant departments as members. It has an office under it, with Jiang Hong, the head of the security office, as the office director. Each village, enterprise and institution has also established corresponding fire safety working groups and designated dedicated personnel to take charge. In order to enhance the fire safety responsibility awareness of each village (community) and enterprises and institutions, the town government signed a fire safety responsibility letter with each village (community), decomposed the work tasks to the village (community) at all levels, and extended the requirements to social groups, Farmers have truly achieved "horizontally to the edge and vertical to the bottom." The town also implements a responsibility system for investigating hidden dangers and accidents. The town security office conducts fire inspections every quarter on villages, enterprises, institutions, and population gathering points in towns and cities. The "Implementation Plan for "Gridded" Management of Fire Safety in Huangzhong Town" was formulated. At the same time, 8 regulations including the fire safety management system, fire hazard reporting system, fire publicity and training system, and fire safety inspection system were also improved System, standardize and promote the development of various tasks through system construction.

2. Innovate publicity forms and carry out in-depth fire safety publicity and education

For a long time, due to various reasons, rural fire protection publicity and education has been limited to a few banners and slogans. , printed and distributed several promotional materials, which were too monotonous and superficial. In response to these problems, we vigorously carry out fire safety publicity and education in a form that is popular with the people and various publicity forms. With the close cooperation of the town radio and television, security office, forestry station, Huangzhong Middle School and other units and departments, we regularly carry out fire safety propaganda and education. Fire protection publicity and education. In actual work, we firmly establish the concept of "scientific development, safe development", integrate fire safety publicity and education into the creation of "Safe Yellow Bell, Harmonious Yellow Bell", and create "safe villages, safe campuses, safe units, Safe Enterprise" and other activities, distributed more than 1,000 copies of various promotional materials to bring fire protection knowledge to thousands of households; combined with the development of "xx" law popularization, safety production month and other activities, carried out in-depth publicity and education on fire protection laws and regulations; in primary and secondary schools Open fire safety knowledge classes to improve the fire protection awareness of the general public, and strive to achieve the good social effect of "educating one person, driving one family, and influencing one person"; publish a fire protection knowledge column every quarter on the publicity display boards of villages and units. And through frequent publicity of pictures, fire records, laws and regulations, safety knowledge, etc., it has effectively improved the people's fire safety awareness and fire legal awareness.

3. Establish a fire brigade and actively play the role of the voluntary fire brigade

In the fire protection work, we conscientiously implement the policy of "safety first, prevention first", combined with this The actual situation of the town has continued to push the firefighting work in-depth. First of all, we have established a group prevention and treatment team throughout the town and strive to build a "networked" fire prevention and control system.

Correspondingly, the voluntary fire brigades in 6 villages and communities were improved and a team of fire safety officers was established. Currently, there are 90 volunteer firefighters in the town. In order to give full play to the role of the mass prevention and control teams, the town government and police stations often conduct training in batches for the voluntary fire brigade of villages, enterprises and institutions to enhance their practical capabilities and strive to achieve our town's "small fire does not leave the village" The fire prevention and control goals are "moderate fire does not leave the town, and large fire can be controlled".

IV. Carry out inspections and rectification, and strive to reduce fire safety accidents

Various existing enterprises in Huangzhong Town are in disrepair for a long time. Some enterprises did not set up fire warning signs.

5. Next steps

First, earnestly carry out fire prevention work in autumn.

The second is to continue to strengthen the investigation of fire safety hazards on a regular and irregular basis, improve relevant fire protection measures, and urge all units, enterprises and population gathering points to purchase fire extinguishers and equip emergency lights.

The third is to do a good job in forest fire prevention in the current autumn.

The fourth is to strengthen fire safety management in key areas such as hospitals, Internet cafes, and fireworks and firecracker operating points.

Fifth, use weekends to conduct professional training for volunteer firefighters from various units, villages (communities), and strive to improve their professional capabilities.

5. Self-examination report on fire safety work

In 20xx, the fire protection work of our bureau followed the fire protection work policy of “prevention first, combining prevention and firefighting”, and conscientiously implemented the " ** and the Fire Protection Law of the People's Republic of China", "Several Opinions of the Ministry of Public Security, the Ministry of Supervision, and the State Administration of Work Safety on Further Implementing the Fire Fighting Responsibility System" and "Opinions of the xx County People's Government on Implementing the Fire Safety Responsibility System", strictly Implementing the responsibility requirements of the "XX County Firefighting Target Responsibility System for 20xx", strengthening leadership, carefully organizing, and paying close attention to implementation, our bureau's firefighting work has achieved good results.

1. Effectively strengthen organizational leadership

Bureau leaders attach great importance to this work and include fire safety work as an important part of "Safe Daocheng". In March, a fire safety committee was established In the work leading group, Director Ding Zhennaji is the leader, Deputy Director Zhang Xiangdong and Discipline Inspection Team Leader Renqing Phuntsok are the deputy leaders, and Comrade Renqing Phuntsok is in charge of the work. There is an office under it, with Comrade Xu Dixuan as the director of the office, who is specifically responsible for the daily affairs of this work. Fire safety work organizations have been established respectively, headed by the person in charge of the unit, so that the top leader takes overall responsibility, and the leaders in charge are responsible for specific work, and effectively strengthen the leadership of fire protection work.

2. Carefully formulate a work plan

Formulate a 20xx annual fire protection work plan that is consistent with the economic development of our county, and supervise its implementation; every May Day and National Day New Year's Day and other major holidays also make timely arrangements and deployments to emphasize fire safety work, supervise rectifications and eliminate fire hazards, and ensure a safe celebration of the holidays.

3. Effectively implement the safety responsibility system

In accordance with the clear management responsibilities and division of labor in the "Opinions of the xx County People's Government on the Implementation of the Fire Safety Responsibility System", we must pay close attention to the fire safety responsibility system implementation, continuously improve the fire safety environment, effectively increase fire supervision, effectively prevent and suppress the occurrence of accidents, and create a good fire safety environment. Comparing the contents and requirements of the "xx County Water Conservancy Bureau's 20xx Fire Target Responsibility Letter" signed with the County People's Government, our bureau detailed and implemented the fire safety responsibilities. and conduct inspections and assessments on the accountability system. Earnestly perform the fire supervision and management responsibilities of this system. The organization is in place to conduct regular or irregular fire safety inspections of the system and supervise the implementation of rectification of fire hazards. 4. Establish and improve a sound management system.

Establish and improve various rules and regulations and safety operating procedures for fire safety in the unit, establish and improve fire safety quality standards for each link and position, standardize the fire safety behavior of unit personnel, strengthen the construction of firefighting teams, and actively improve firefighting facilities, and gradually established an internal fire safety management mechanism of "management autonomy, self-elimination of hidden dangers, and self-responsibility". Extensively mobilize cadres and workers to actively carry out fire prevention and control activities.

5. Actively carry out publicity and education

Under the guidance of the county public security fire department, volunteer fire brigade will be organized regularly or irregularly to carry out fire-fighting drills. We organized all cadres and employees to participate in the fire drill of the “11.9” Fire Safety Day, visited the exhibition of fire vehicles and equipment, and fire case pictures, and listened to lectures on fire laws and regulations and fire safety knowledge. At the same time, cadres and employees were organized to listen to some good experiences and practices in firefighting work and reports on advanced deeds of enthusiastic firefighting and courageous acts of justice, and positively guided cadres and employees to consciously abide by firefighting laws, regulations and rules, and vigorously created an environment where everyone is responsible for firefighting work. Good vibes. By receiving solid and effective fire safety training and publicity and education, the fire protection knowledge and fire safety awareness of our bureau cadres and employees have been improved, and their comprehensive ability to resist fires has been enhanced.

6. Increase investment in fire protection

First, increase investment in funds to ensure the normal development of fire protection work. The second is to strengthen the construction of fire protection facilities. In 20xx, *** had 1 fire hydrant, 2 fire extinguishers, and 2 fire emergency lights.

Existing shortcomings and next work plan:

In 20xx, although our bureau’s fire safety work has achieved certain results, there are still certain shortcomings, mainly reflected in the following: Aspects: First, despite extensive publicity and education, there are still a small number of cadres and employees who do not have strong awareness of fire prevention and do not know much about fire safety knowledge; second, due to financial and other reasons, there is still insufficient funds for fire protection equipment and infrastructure construction. In view of the existing problems and deficiencies, we will take practical and effective measures to seriously solve them in the next step of work.

1. Further improve the fire safety work responsibility system.

First, continue to include fire protection work in the annual water affairs work plan and include it on the important agenda, and effectively strengthen organizational leadership, supervision and inspection.

The second is to further clarify the fire safety responsibilities of our county’s water affairs system and ensure that responsibilities are implemented in place.

The third is to strengthen fire safety management, establish and improve the fire safety responsible person system, and strictly implement the fire safety responsibility system and the post fire safety responsibility system.

2. Effectively implement the construction of fire protection facilities. The first is to increase investment in fire protection facilities and ensure that funds for the construction and maintenance of fire protection facilities are in place.

3. Strengthen fire protection publicity and education and improve the comprehensive ability to resist fires. Adhere to the principle of mass prevention and mass treatment, and allow the majority of cadres and workers to actively participate in firefighting work. Everyone has the responsibility.

4. Carry out in-depth fire safety inspection and management.

First, organize regular fire safety inspections to promptly discover and eliminate fire hazards. Those that do not meet fire safety requirements will be resolutely ordered to make rectifications to prevent the occurrence of fires.

The second is to carry out in-depth special fire safety management activities focusing on water plants, sewage treatment plants, water conservancy construction material warehouses, bureau comprehensive archives, etc.

Strengthening fire safety management is related to the safety of people’s lives and property, economic development and social stability. Our bureau further searches for gaps, overcomes difficulties, pioneers and innovates, works hard, strives to create a good fire safety environment, and creates favorable conditions for the sound development of water conservancy work.