Analysis of night construction safety management regulations?

In recent years, there have been many safety accidents inside and outside the province, especially the boiler explosion accident in Xingping City, which caused 6 deaths 1 injury. My unit's falling accident on September 5th is a painful lesson. Therefore, the Safety Committee of Xinghua Group Company issued the Emergency Notice on Further Strengthening Work Safety in the Near Future, emphasizing the importance and necessity of work safety. Today, let's learn about the safety management regulations for night construction.

20 12, 10 year10.30, according to the spirit of (No.2012105 of Shanyou Anfa), the company formulated the implementation plan of Xinghua Group's "100-day safety production without accidents" activity. In order to actively respond to the company's activity plan, combined with the actual situation of the machinery factory, the following regulations are formulated for the night construction work of the machinery factory, and all units are expected to strictly implement them.

1. Conscientiously implement the spirit of emergency notice to further strengthen safety production in the near future. In principle, nine dangerous operations such as hot work, high altitude and lifting (hoisting) are not allowed after 22 o'clock at night. If production is needed, it is necessary to upgrade management and various operation tickets.

2, due to the need of construction work at night, must be approved by the construction unit to the production department. The person in charge of on-site construction is responsible for on-site safety production.

3, after 20 o' clock at night, it is forbidden to single person alone on-site operation, each operating point must assign personnel for safety monitoring, and implement safety protection measures. The necessary construction scheme should be practical and feasible.

4, production personnel on duty to make records of production safety, safety personnel to check the implementation of safety measures.

5. For construction at night, a hierarchical reporting system shall be implemented, which shall be reported to the deputy director of production before 22 o'clock and to the director after 22 o'clock.

6. After receiving the report of night construction, the director and the deputy director of production should carefully check the construction scheme and safety measures, and command and dispatch personnel, materials and equipment at any time to ensure the safety of night production and construction.

7. The production department should strengthen the safety management of night construction, report it according to the report level, earnestly implement the night construction plan and safety director, check the production duty record, and report the night construction to the factory director the next day.

I believe that after the above introduction, everyone has a certain understanding of the night construction safety management regulations. Welcome to Zhong Da for more information.