Emergency plan for water and power outage in conference room

Sample emergency plan for water and power outages in conference rooms (6 articles in common)

In daily study, work and life, sometimes unexpected accidents occur. In order to avoid things getting worse, Oops, usually a contingency plan needs to be prepared in advance. So how should we prepare an emergency plan? The following is a sample emergency plan for a water and power outage in a conference room that I have collected for you (generally 6 articles). You are welcome to share it.

Emergency plan for water and power outages in the conference room 1

1. Emergency treatment for sudden water outages

1. Engineering personnel on duty receive water outages from households or businesses. After notification, you must rush to the water outage site immediately to learn more about the scope of the water outage and related water outage situations.

2. The engineering personnel on duty immediately go to the main gate of the water outage area to check the valve. If the valve is closed, promptly understand the reason for the valve closing. After confirming that it can be opened, open the valve to restore water supply.

3 If the main valve in the area is not closed, contact the water company in time to learn the specific reasons for the water outage.

4. If the water supply is caused by the domestic water pump equipment, the following measures will be taken:

(1) If the valve is closed and the water is stopped, immediately understand the reason for the valve closing and take effective measures. Measures will be taken to restore water supply in a timely manner.

(2) If the water pump is shut down and causes a water outage, immediately find the cause of the shutdown, take effective measures to repair or replace parts, and restore water supply in a timely manner.

(3) If the water outage is caused by the municipal pipe network, immediately check whether the municipal pipe inlet gate valve is faulty or contact the water company to learn the reason for the water outage and the time to restore water supply. Promptly cooperate with the service center to provide relevant explanations to business owners.

2. Emergency treatment of sudden power outage

1. Sudden power outage of high-voltage ring main unit

(1) Engineering personnel on duty should contact the high-voltage line in time Power supply department, any operation is strictly prohibited before the cause of the fault is identified.

(2) If the fault point is not within the jurisdiction and it is estimated that the troubleshooting time will be long, the high-voltage operator of the power supply department can transfer to another high-voltage power supply line (if any) and suspend the switch that is strictly prohibited from being used together." "No closing" sign.

(3) After the fault is eliminated, the power supply department operators will restore the original power supply line.

2. The circuit breaker in the distribution room tripped and the power went out

(1) After receiving the power outage notice, the engineering duty personnel immediately rushed to the power outage site and switched the load switches of each branch under the circuit breaker. Disconnect, and hang a "Line Maintenance, No Closing" sign on the tripped circuit breaker.

(2) Use a megohmmeter to detect branch lines.

3) After the faulty line is identified, close other lines to restore power supply.

4) Hang a "Line Maintenance, No Closing" sign at the problematic branch circuit switch, conduct further maintenance on the line, eliminate faults, and restore power supply.

3. The household's room tripped

1) After receiving the power outage notice, the engineering personnel on duty immediately rushed to the power outage site. Before inspection and repair, they should know whether the household's electricity meter was used before tripping. other electrical appliances to quickly find the fault point.

2) If the fault is the indoor main switch, immediately turn off the main switch and other branch air switches, and then turn on the main switch.

3) If the main switch does not trip, then send the sub-switch. If one of the sub-switches cannot be sent, conduct segmental testing of the line until the fault is eliminated and the power supply is restored. Meeting room water and power outage emergency plan 2

Anticipated power outage:

1. When receiving a power outage notice, the service center should inform the power outage line, area, time, and elevator usage in advance As well as safety precautions and other conditions, use the community broadcast to notify each household and merchant, and issue a power outage notice at the main entrance and exit;

2. Notify the engineering department to do contingency work before the power outage, such as: shutting down the elevator , debugging backup diesel generators, etc.

Unpredicted power outage:

1. In the event of a sudden power outage without receiving any notification, the engineering department should immediately confirm whether it is an internal fault or an external power outage.

If the power outage is caused by an internal fault, someone should be sent immediately to find the cause and take measures to prevent the fault from expanding; if it is an external power outage, on the one hand, it is necessary to prevent accidents caused by sudden calls, on the other hand, call the power bureau to check the power outage situation, understand when the power supply will be restored, and Notify management of any information learned.

2. The Order Maintenance Department and the Engineering Department immediately sent people to each floor to check the operation of the elevator. If a person was found trapped in the elevator, he immediately rescued the person in accordance with the emergency plan for trapped people in the elevator.

3. The management department will immediately notify important merchants in the community by phone of the power outage. If a backup generator is activated, community broadcast notifications can be used. If the power outage lasts for a long time, a power outage notice needs to be posted at the main entrance and exit.

5. If there is a sudden power outage when the shopping mall is open at night, the security department should assist the shopping mall to maintain good order, guide merchants to use emergency lighting, candles and other backup lighting, evacuate customers, and pay attention to fire prevention. Prevent fires and assist shopping mall management in safety precautions.

6. When necessary, arrange employees to go to the main entrances and exits of the community and the elevator hall to maintain order. The Order Maintenance Department should strengthen security measures to prevent anyone from causing chaos and fishing in troubled waters, and close the door when necessary.

7. Assign people to guard the office and duty room, patiently receive inquiries from residents and merchants, and provide explanations and guidance to prevent conflicts with residents and merchants.

8. The engineering department records in detail the start and end time of the power outage, its causes, countermeasures and the losses caused.

9. Preventive measures for sudden power outages:

1) The engineering department should frequently check the emergency lighting and emergency broadcasting systems to ensure normal operation.

2) The management department should remind office building residents and merchants to prepare some emergency lighting or candles to prevent power outages.

3) In addition to flashlights for patrol and maintenance, the order maintenance department and engineering department should also be equipped with portable emergency lighting, which should be charged and maintained regularly to keep it in good condition.

10. If the power outage lasts too long, ask the relevant leaders of the management office whether to turn on the backup power supply system if necessary.

11. When confirming the length of the power outage, residents and merchants should be notified and pay attention to water storage to avoid normal water supply due to paralysis of the secondary water supply system.

12. In the event of abnormal external power outage or power supply, all elevators in the community except the office building must be stopped to prevent the elevators from shutting down people, and staff should be arranged to stay at the operating elevators until power is supplied. normal.

Predicting water outage:

1. After receiving the notice of water cutoff from the water supply company, the service center should immediately conduct community broadcasts in advance and post a water cutoff notice on the bulletin board of each corridor.

2. The content of the water outage notice must include: the reasons for the water outage, the estimated water outage and water supply time, reminding residents and shops to do a good job in water storage, and pay attention to closing all indoor faucets or main valves.

3. If the community has a domestic reservoir and uses a secondary pressurization system, the timed water supply method can be flexibly adopted.

Unpredicted water outage:

After receiving a consultation call from residents or discovering a water outage, immediately arrange for engineering personnel to check the cause, whether it is an equipment failure or the water inlet pipe is out of water. In case of equipment failure, the cause should be immediately identified, and the cause that can be eliminated should be dealt with immediately. If it takes a long time to repair, the service center should be notified immediately, a notice should be posted, and the notice should be broadcast in the community. If there is no water in the water supply pipeline, you should contact the water supply company immediately to understand the situation and conduct a community broadcast. If the water outage lasts for a long time, a water outage notice needs to be posted. Emergency plan for water and power outage in the conference room 3

1. Power outage

(1) The logistics management office receives a notice of power outage and water outage from relevant departments, and must inquire about the time of power outage and water outage;

(2) The logistics management office should promptly notify the person in charge of each canteen and stall;

(3) The logistics management office should report to the leadership in a timely manner.

2. Power generation

The logistics electrician immediately used the generator to generate electricity to ensure the normal use of electricity in the canteen.

3. Post warm chime reminders to inform teachers and students of water and power outages, and remind teachers and students to bring change for meals.

4. Canteen food processing.

If there is a planned power outage or water outage:

(1) Power outage or water outage for breakfast:

(1) Prepare water in a container the night before and make steamed buns. Steam it with a diesel stove the next morning;

(2) Provide fried noodles, fried rice, boiled noodles, and porridge as much as possible;

(3) Provide eggs and milk.

(2) Power outage during lunch and dinner:

(1) Rice: Cook the rice in advance;

(2) Dishes: According to the generator power generation time , arrange cooking; use gas stove or briquette stove for cooking.

If there is a sudden power outage:

(1) Breakfast power outage:

(1) Make the buns by hand and use a diesel stove to cook them;

(2) Provide fried noodles, fried rice, boiled noodles, and porridge as much as possible;

(3) Provide eggs and milk.

(2) Power outage during lunch and dinner:

(1) Rice: Arrange steamed rice in time after the generator generates electricity;

(2) Dishes: Wait After the generator generates electricity, promptly arrange cooking or use a gas stove or briquette stove for cooking.

5. Food sales. Teachers and students can purchase meals with cash. Emergency plan for water and power outages in conference rooms 4

In order to effectively protect the safety of teachers and students in the school, effectively deal with sudden power outages that may occur in the school, and prevent accidents caused by water and power outages, according to the superior authorities In the spirit of relevant documents, the school has made a study and decision to formulate an emergency plan for water and power outages.

Safety Leadership Group

Team Leader:

Deputy Team Leader:

Members: Class Teachers and Support Staff.

1. Main responsibilities:

Keep abreast of information about water and power outages, master the school's equipment configuration to prevent sudden water and power outages, and propose preventive countermeasures and measures based on the actual situation of the school. Measures should be taken to strengthen safety education for school teachers and students, and improve teachers and students' awareness and ability of protection.

2. Work measures:

1. Strengthen school safety education and publicity work, make full use of publicity positions such as bulletin boards, blackboards, and campus radio, and use themed class meetings, radio stations, etc. Promote education and training on the prevention of water and power outages to all teachers and students in the school, so that students will not panic once a water or power outage occurs.

2. Strengthen the maintenance and installation of facilities to prevent water and power outages. The school will invest funds according to the actual situation to install some related equipment to prevent sudden water and power outages, such as: on the stairs of dormitories and teaching buildings. There should be emergency lights and safety exit signs to ensure that stairs are unobstructed and guardrails are secure. When water or power outages occur, class teachers and classroom teachers can organize the safe evacuation of students.

3. Report and response:

1. For water and power outages notified in advance, all teachers and students will be notified to prepare for the outage after contacting each department to explain the situation. Water and power outage preparations.

2. Temporary water and power outages without prior notice:

(1) The administrative personnel on duty should immediately report the situation to the water and power outage safety leading group, and the leader The groups divided up to arrange relevant work.

(2) Members of the leadership team should immediately call all important functional departments, such as: notify the canteen to arrange meals and temporary lighting equipment, notify the Education Department to arrange for head teachers and classroom teachers to maintain maintenance in the corridors and stairs of each building. order.

(3) The General Affairs Office is responsible for organizing water and electricity maintenance personnel to find out the reasons for water and power outages, and promptly contact and coordinate with the local water supply and electricity departments to eliminate faults as soon as possible.

3. Water and power outages during evening self-study period:

(1) School duty personnel should promptly notify on-duty electricians and maintenance personnel by phone.

(2) After a water or power outage occurs, each teacher on duty should immediately go to the designated floor to organize students into the classroom to maintain order and evacuate in an organized and planned manner. Emergency plan for water and power outage in conference room 5

Medical safety is the center and focus of hospital medical work. Water, electricity and other support systems are key links to ensure medical safety. In order to ensure medical safety, respond to emergencies According to the requirements of the Municipal Health Bureau's "Safety Production Year" activities and the actual situation of our hospital, this plan is specially formulated.

1. Organizational Leadership

(1) In order to strengthen the leadership of emergency response to power outages and water outages, a leading group for emergency response to power outages, water outages and other emergencies in the hospital was established. , the dean in charge of logistics was determined to be the commander-in-chief, responsible for the overall command during power outages and water outages. When the commander-in-chief is not in the hospital during a power outage or water outage, the deputy commander will serve as the commander-in-chief.

(2) The deputy commander on duty for power outages and water outages is responsible for the specific rescue work on site under the leadership of the commander-in-chief; the heads of each department serve as on-site commanders.

(3) The commander-in-chief, deputy commander and on-site commander should rush to the scene as soon as possible after receiving a power outage or water outage.

2. Precautions against power outages, water outages and other emergencies

(1) Equipped with dual power supplies: If one of them suddenly loses power, activate the other immediately.

(2) Key department equipment is equipped with UPS to prevent equipment failure or file loss caused by sudden power outage.

3) The passages on each floor of the ward are equipped with power outage emergency lights to ensure the safety of pedestrian passages after a sudden power outage.

(4) Self-provided generator sets, dedicated lines for operating rooms, MICU, NICU, emergency rooms and other key departments to ensure power supply.

3. Reporting procedures for power outages, water outages, gas outages and other emergencies

(1) When a power outage or water outage occurs, relevant personnel should immediately report to the plumber on duty. The electricians and plumbers on duty must rush to the scene immediately after receiving the report. In the event of a power outage or water outage that may last more than 5 minutes, the person on duty must immediately report to the deputy commander.

(2) After receiving the report, the deputy commander should immediately rush to the relevant location to assist in processing. If there is a power outage or water outage that may last more than 15 minutes, a report must be made to the commander-in-chief.

(3) When there is a power outage or water outage in key departments such as the emergency department, ward, operating room, laboratory department, radiology department, functional department, and computer center, the personnel on duty must report to the department director immediately. The department director must rush to the department immediately after receiving the report to prevent accidents among critically ill patients. If a critically ill patient is being rescued, he should immediately report to the medical department or deputy commander. After receiving the report, the medical department should rush to the scene immediately, organize the entire hospital to carry out rescue, and report to the commander-in-chief at the same time.

(4) After receiving the report, the deputy commander should promptly understand the situation, study solutions, and report the vicious power outage and water outage to the commander-in-chief.

4. Measures for handling power outages, water outages, and gas outages

(1) Basic management

1. Main departments must be equipped with emergency lights, and key departments must be equipped with energy storage devices. Water vessel.

2. The heads of each department should regularly check the circuits and waterways to identify safety hazards. If problems are discovered, report them to the deputy commander promptly and make repairs in a timely manner. It is necessary to regularly check whether the rescue equipment in each department, such as ECG monitors, electrocardiographs, defibrillators and other equipment, is in a charged state.

3 The Infrastructure Office should regularly organize electricians and plumbers to inspect and maintain the circuits, waterways, and gas lines of the entire hospital.

4. After power outages, water outages and other emergencies occur, all departments must promptly report them according to procedures and actively handle them.

(2) Implementation of responsibilities

1 Medical staff

After emergencies such as power outages and water outages. They should immediately report to the electrician and plumber on duty. If there are critically ill patients in the ward, they should also report immediately to the department director and the general on-duty officer. Provide explanations to patients and their families to eliminate patients' panic.

2 Clinical Departments

After receiving the report, the head of the clinical department must rush to the department immediately to strengthen the monitoring of critically ill patients. If you encounter a critically ill patient, you should report to the medical department immediately.

If a power outage suddenly occurs during the operation, the medical staff should immediately report to the department head, who should immediately rush to the scene to organize the treatment and report to the medical department. Use emergency lighting, handle it properly, wait for a call, and ask the deputy commander to transfer to a hospital for treatment if emergency surgery is necessary.

3 Medical Technology Department

After a power outage, the laboratory department will send dedicated personnel to send specimens to other hospitals for examination of emergency biochemical and routine examination items. For emergencies that require imaging examinations such as radiography and ultrasound, the patients will be transferred to other hospitals for examination by dedicated personnel from the department.

On the premise of ensuring medical safety, all medical technology departments should protect the safety of equipment and promptly protect relevant equipment according to operating procedures.

4 Infrastructure Office

A. Regularly organize business training for electricians and plumbers to improve emergency response capabilities.

B. Install emergency lights and fire hydrants in the emergency rooms, stairs and passages of the medical area in all wards of the hospital.

C. Organize regular safety inspections of electricity and waterways to identify potential safety hazards and repair problems in a timely manner.

D. When receiving a report of a power outage or water outage, organize personnel to rush to the scene and carry out repairs immediately. If a power outage or water outage is likely to occur for more than 15 minutes, report to the deputy commander in a timely manner. When the water supply is cut off, the faucets in non-key areas should be closed immediately, and key departments should be notified to strictly control the use of water. According to the situation, manpower and material resources should be actively organized to collect water from nearby water sources that meet drinking standards.

E. The leading group for emergencies such as power outages and water outages organizes and leads the handling of emergencies such as power outages and water outages throughout the hospital, coordinates relationships with sister hospitals, power supply, water supply and other departments, and determines Principles and procedures for handling emergencies such as power outages and water outages, and reporting to superior departments and governments when necessary.

5. Accountability and rewards for emergencies such as power outages, water outages, gas outages, etc.

(1) The hospital's emergency response leading group investigates serious power outages, water outages and other emergencies in the hospital, and determines the responsibility for ineffective handling of power outages, water outages and other emergencies. Personnel shall be punished accordingly according to the degree of responsibility and in accordance with relevant regulations of superiors and the "Hospital Assessment Rules" and other relevant regulations.

(2) Rewards will be given to those who promptly discover and take active measures to avoid or mitigate the consequences of damage caused by power outages, water outages and other emergencies. Emergency plan for water and power outages in the conference room 6

1. The composition and responsibilities of the deputy general manager of emergency rescue

<1>Leadership organization

General commander: day shift; Night shift: duty cadre

Deputy commander:

Team members:

<2>Responsibilities

1. Commander-in-chief: Responsible for organization Direct the emergency rescue of the entire factory;

2. Deputy commander-in-chief: Responsible for assisting the commander-in-chief in the specific command of emergency rescue;

3. Team members: unified command at the headquarters The responsibilities of each section chief in accident emergency rescue are:

1. Steelmaking foreman: Responsible for on-site command of the steelmaking section;

3. Continuous caster Chief: Responsible for the on-site command of the continuous casting section;

4. Mechanical foreman: Assist the general commander in the on-site command of emergency repair work;

5. Electrical repair foreman: Assist the general commander The commander is responsible for the on-site command of the emergency repair work;

6. Peripheral foreman: assists the general commander in the on-site command of the emergency repair work;

7. Engineer: is responsible for the technical guidance of the emergency repair site ;

2. Emergency communications:

When dealing with an accident, all rescue and repair personnel must keep communication open. If the signal is found to be unstable or interrupted, they should use it immediately. Contact the commander-in-chief promptly via a fixed phone or mobile phone in the factory and clearly indicate his location.

3. Accident handling plan:

1. When a power outage occurs, the water pump owner should not panic but stay calm. The South District Safety Water Tower can provide about 15 minutes of water source, during this period, the main controller can completely restart the water pump after sending power;

2. In the North District, under normal circumstances, the diesel engine can start automatically after a power outage, and the main controller of the water pump only needs to go to the control Press the clutch button on the box operation panel, and then press and hold the speed increase button until the speed displayed on the speed meter can no longer rise;

3. If the diesel engine does not start automatically, you can first Press the reset button once. If it still doesn't work, put the transfer switch in the manual position. At this time, as long as you press the start button with your finger, the diesel engine can start

4. After the diesel pump is successfully started, the water pump homeowner controller should immediately turn on the diesel engine. Report the situation to the shift dispatcher and notify the converter main control room and continuous casting main control room.

5. After receiving the alarm call from the water pump room, the converter main control room should immediately raise the gun to stop smelting, and immediately notify the dispatcher on duty of the situation, and the dispatcher on duty will report to the superior.

6. After receiving the alarm call from the water pump room, the continuous casting main control room should pay close attention to the amount of secondary cold water and try to finish pulling out the molten steel in the ladle if conditions permit.

7. After the diesel engine is started, the owner of the water pump can appropriately adjust the manual valve at the inlet to increase or decrease the water pressure to achieve the safe water required by the equipment.

IV. Preventive measures and assessment

1. The water pump house controller should closely monitor the water level of the safety water tower during daily work, and report any abnormality immediately to the on-duty dispatcher Long, easy to handle in time to eliminate hidden dangers;

2. The manual valve of the outlet pipe of the safety water tower must be observed at all times to prevent someone from accidentally operating it;

3. Each shift of personnel must inspect The indications of the switches and indicator lights on the diesel engine operating box panel. For example: the selector switch should be in the automatic position; the key switch of the power supply should be turned on; whether the float charging indicator light is on, whether the alarm light is on, and if so, it should be reset in time. ;