As long as the floor layout requirements of the construction site meet the construction and production conditions, all requirements for civilized construction shall be fully taken into account. No random construction is allowed without permission. On-site production layout shall be carried out strictly in accordance with the approved general construction plan. And it must be managed uniformly to basically achieve the "six modernization" goals

1) Standardization measures for construction site fences:

(1) All construction sites will implement closed construction: except for the entrance and exit of personnel and vehicles Outside, the perimeter must be built with sand and ash to build an 18cm thick wall with a height of more than 2.2m and a top. The wall must be equipped with brick columns attached to the wall (the distance between columns shall not exceed 3m). The fence must be strong, safe and clean, and the exterior wall must be plastered and whitewashed to achieve a beautiful effect. The construction site and living area must be separated by walls (the distance between the living area and the construction site must be >30m).

(2) The total width of the construction site gate shall not be less than 5m, the gate pillars shall be beautiful and elegant, and slogans shall be added to the outer door fans.

(3) The following signs and columns are set up outside the gate of the construction site:

Construction signs:

The names of each unit are marked on the right fence outside the gate:

p>

(4) The following "five signs and two pictures" are set up inside the gate of the construction site;

Project overview sign, safety production counting sign, and safety production prohibition sign (including: ten safety technologies Measures, ten inaccuracies in on-site construction, ten disciplines of safe production, ten prohibitions on safe production, construction site fire prevention instructions); company quality policy publicity board, company action oral publicity board; construction site floor plan, construction site sanitation responsibility area, floor plan.

2) Construction site

The construction site must be laid out and managed according to the construction layout plan in the construction organization design (or plan) to avoid being dirty, messy, and poor. .

(1) At the car entrance and exit of the construction site, set up a car wash site and sedimentation tank, and configure faucets for flushing.

(2) The main passages at the construction site must be unobstructed. The construction site must implement hard bottoming, and concrete pouring is required for the internal and external passages at the construction site gate, the material storage yard, processing yard, and warehouse floors in temporary facilities.

(3) After load design and installation of lines according to the temporary power construction plan. The temporary line erection height is 3m and the approval procedures must be completed.

(3) Building materials must be classified and stacked in fixed locations within the designated range according to the construction floor plan.

(4) The construction site must be leveled, the site must be properly drained, and the drainage system must be kept smooth. Mud and sewage must be settled in sedimentation tanks before entering the sewer.

(5) Construction waste at the construction site should be piled up in a centralized manner and cleaned up in time.

(6) Set up safety slogans, signs and warning signs at the construction site in a timely manner.

At the entrance of the construction site, safety slogans and signs such as "A safety helmet must be worn when entering the construction site", "Slippers and high heels are strictly prohibited to enter the construction site", and "Beware of falling objects" are hung. Fences, covers and safety signs will be installed at the construction site in pits, wells, deep trenches, reserved holes on each floor, around transformers and near high-voltage lines. Protective railings and safety shelters must be installed at stairwells, elevator shafts, floor steel derrick entrances and exits, and passage entrances and exits. Red light warning lights should be set up at night in pits and deep trenches.

3) Temporary facilities

(1) Construction projects located on both sides of the road, starting from the second floor, must use flame-retardant dense-mesh new safety construction materials with a mesh size of not less than 2000 cm2 and 100cm2. The network is fully enclosed for construction.

(2) The offices, dormitories, kitchens, toilets, temporary water and electricity facilities and warehouses on the construction site must be arranged in strict accordance with the construction floor plan in the construction organization design (or plan).

(3) Production and living facilities at the construction site must be marked and kept clean and hygienic at all times.

(4) The on-site offices and conference rooms must be reasonably laid out and neatly furnished, and the wall pictures and tables must be arranged in an orderly manner. Each picture and table must be on the wall:

(5) Construction On-site dormitories should be ventilated and light-transmissive, and reasonably separated. Doors must be marked with signs to distinguish between teams.

(6) The construction site should set up a staff canteen in accordance with the regulations and requirements of the health and epidemic prevention department, and it is strictly prohibited to set up stoves in separate teams.

(7) Construction site toilets are required to be ventilated and clean. Automatic flushing equipment is installed in the toilets, and dedicated personnel are designated to clean them.

4) Management of site appearance

(1) The content of publicity slogans, blackboard newspapers and newspaper reading columns at the construction site should be changed regularly.

(2) Various health systems formulated by governments at all levels and competent departments must be strictly implemented, and on-site health responsibility areas must be implemented.

(3) The place where workers operate must be “clean after work and underfoot after work”.

(4) The "three wastes" emissions from construction must be properly handled in accordance with relevant regulations to prevent flying dust, mud leakage, sewage outflow, and noise disturbing residents.

(5) The mechanical equipment used at the construction site shall be uniformly yellow in color. Construction elevators, tower cranes, high-speed cages, and steel derricks are all painted dark red. The equipment settings in the construction electrical switch box should comply with regulations. The oil in the box shell should be dark green, and the "electrical hazard" warning should be marked.

(6) Materials must be stored in zones and categories according to the general layout of the construction site.

(7) It is strictly prohibited to pile materials and debris on gratings, platforms and walking bridges. Debris on the safety net and inclined baffles should be cleaned regularly. Protective facilities must be tightly sealed to prevent falling objects from injuring people.

(8) Enforce the regulations on the use of safety helmet colors and wearing work cards at the construction site.

(9) Various protective facilities, warning signs and safety signs at the construction site are not allowed to be dismantled or moved at will.

5) Construction site canteen

(1) Strictly abide by the "Food Hygiene Law" and do not sell rotten, spoiled or smelly food.

(2) The sanitation system must be sound, with responsibilities assigned to each person and a clear division of labor;

(3) The canteen must be kept hygienic and clean at all times; the kitchen must ensure the "six no's", that is, : No ants, no flies, no rats, no cockroaches, no odor, no insects;

(4) Regular disinfection of cooking utensils and tableware, pay attention to food hygiene, and prevent food poisoning accidents;

(5) Cooking staff should pay attention to personal hygiene and go to the epidemic prevention department for regular physical examinations. They must wear white clothes, white hats, and white masks when working.

6) Construction site dormitories

(1) Management of construction site dormitories must be strengthened and a sound dormitory management system must be established.

(2) Actively organize and carry out activities to create civilized dormitories, establish a new trend of living in harmony, mutual respect and accommodation, resist the erosion of various decadent ideas, and ensure that there is no mental pollution in the dormitory area.

(3) Carry out safety and fire prevention work in the dormitory, control fire sources and kindling, and prevent fire accidents.