Joke Collection Website - Bulletin headlines - How to write a scaffolding contract
How to write a scaffolding contract
How to write a contract contract? Let us learn about it together:
The main contents of the contract contract include: 1. The names of the issuing party and the contractor should be written clearly. and residence; 2. State clearly the contents of the contracted project; 3. State clearly the time limit and specific requirements for the performance of the contract; 4. State clearly the amount of the price and method of payment; 5. State clearly the liability for breach of contract, etc.
Scaffolding project contract sample 1
Contractor: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the provisions of the "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China" and other relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness and good faith, after Party A and Party B *** After negotiation, Party A agreed to outsource the Huyu City Phase II scaffolding project to Party B for construction. Based on the specific conditions of this project, the two parties reached the following agreement to facilitate ***'s compliance and implementation.
1. Project Overview
1. Project name: Muya Plaza Project.
2. Construction area: 101390.56 square meters.
3. Structural levels: frame shear wall structure, Building 1: 26/3, Building 2: 5/3, Building 3: 28/3.
4. Project address: Jiefang Street, Yajiang County.
2. Content and scope of the contract
1. Party B’s contract scope:
1) All interior and exterior wall scaffolding erection and dismantling, safety protection facilities, The protective erection and dismantling of safety passages and all edge openings (including but not limited to the erection and dismantling of exterior wall scaffolding; the pre-embedding, erection, and dismantling of scaffolding rows; the erection and dismantling of various safety protection sheds; the edge Installation and dismantling of hole protection; erection of stair handrails; installation and dismantling of scaffolding, isolation, and protective doors in elevator shafts; erection and dismantling of passenger and cargo elevator and derrick entrance protection, platforms, and enclosures, scaffolding footboards, and soft and hard isolation of scaffolding wait).
2) All materials used on the construction site (including but not limited to scaffolding, steel sheds, carpentry sheds, various protective sheds, safety passages, safety nets, etc.)
2. Contracting method : Contracted work and materials.
3. Construction period: October 20_ to January 20_. 4. Project quality standards: Scaffolding and other protective facilities comply with national JGJ59- 20_Standards and requirements of local safety supervision departments. Based on the Zhongxin Science and Technology City Talent Apartment Project
3. Contracting unit price and contracting method
1. Calculated based on building area. The area is based on the building area marked on the drawing, and this area will be calculated at the time of settlement.
2 per square meter. The contract unit price includes all the contents of Article 2 of the contract terms. In the future, if labor is required. Price increase factors or policy-based manual adjustments have nothing to do with this contract.
3. Party B will set up the safe passage, and all costs within 1,000m2 will be borne by Party B. Party A will bear the labor costs above 1,000m2. .
4. The comprehensive unit price includes all safety nets, painting and assembly and disassembly labor costs.
4. Assessment, acceptance, rewards and penalties
1. Project quality: Acceptance inspection shall be carried out in accordance with the national JGJ59-20_ standard. If the quality standard requirements are not met, Party A has the right to punish Party B. If Party B's construction errors occur due to quality and safety accidents, Party B shall bear all the losses.
2. Construction period: Party A shall provide the required materials in a timely manner according to Party B's progress plan. If Party A's failure to provide steel pipes, fasteners, etc. as planned affects Party A's construction period, Party A has the right to punish Party A. .
3. Safety in production: Party B shall carry out construction in accordance with the relevant safety operating procedures to ensure safe production. If any accident occurs due to Party B's failure to follow the safety operating procedures or its own reasons, Party A has nothing to do with it. , all responsibilities and expenses shall be borne by Party B, and if Party B’s reasons have a negative impact on Party A, Party A has the right to punish Party B.
4. Materials should be used rationally at the construction site and in a timely manner. Do a good job of clearing things up.
5. Payment method
1. Payment will be made monthly based on 70% of the project progress (including workers’ living expenses).
2. After all project structures are completed and accepted, Party A shall pay Party B 95% of the project cost, and the balance 5% shall be settled within one year after the project is completed and accepted.
6. Rights and obligations of Party A
1. Actively create necessary construction conditions for Party B.
2. When Party B makes racks, Party A will cooperate with Party B in equipping auxiliary equipment such as welding machines and electrical boxes.
3. The 7-shaped tensile joints of each layer of the outer frame are provided by Party A from the scrap steel bars. The forming of I-beam hanging bars is provided by Party A, and Party B prepares its own raw materials. The toe boards and four-step-one-isolation partition boards are provided by the project department from the on-site waste wood pile.
4. Provide construction drawings and relevant technical information in a timely manner, and conduct disclosures on construction organization, quality and safety, standardization, civilized construction, and construction progress plans.
5. Party A provides Party B with dormitories, warehouse rooms, office rooms, etc. for security purposes at the construction site for a fee.
6. Pay project fees according to the progress plan.
7. Responsibilities and Obligations of Party B
1. Party B shall make disclosures according to Party A’s technical quality requirements and safety requirements, carefully organize the implementation of operations, and implement on-site construction safety production measures , do all the basic work well, and Party B will be responsible for any accidents caused by illegal operations.
2. Among the construction workers entering the construction site, Party B shall not privately recruit idle labor and blind migrants, and shall not use child labor under the age of 18. Otherwise, Party A has the right to remove such workers. In this regard All consequences caused by this shall be
3. Party B must carry out the construction carefully, and the product quality must comply with the requirements of the "Construction Acceptance Specifications for Building and Installation Projects" and relevant quality assessment standards. If Party B has quality problems caused by careless construction, In the event of an accident, Party B shall be responsible for all responsibilities and bear Party A's direct economic losses and indirect economic losses caused thereby.
4. During the construction process, Party B must abide by the laws and regulations, consciously abide by the rules and regulations of Party A's project department and the various agreements signed by Party A and Party B, and accept the supervision and inspection of Party A's various departments. , all rectification measures proposed by Party A should be completed in a timely manner. If Party B refuses to implement them, Party A has the right to impose corresponding penalties on Party B.
5. Party B must provide qualified materials in accordance with regulations. Steel pipes, fasteners and other materials must pass the inspection by a qualified testing unit before they can be used on site and provide a test report to Party A. Otherwise, Party B will be responsible for all consequences and liabilities arising from material quality problems and bear all costs.
6. Before construction, Party B must provide Party A with the construction plan or construction organization design for the erection of integral and split scaffolding. Construction can only be carried out after approval by the project leader and technical leader. In addition, Party B must provide the project department with valid special operations personnel certificates for all operators.
7. Party B must complete the construction tasks according to the progress requirements of the project department. If Party B cannot complete the construction tasks according to the progress requirements of the project department due to insufficient personnel, Party A has the right to invite other teams to clear the contract. During the construction, Party B will bear all the construction costs incurred, and the amount will be directly deducted from Party B's project payment without objection from Party B.
8. The relevant content of the rectification notice issued by the project department and the superior department must be completed within the time specified by Party A. If it is not completed within the time limit, Party A has the right to impose a fine.
9. Since this project is a provincial civilized construction site, all bamboo rafts and safety nets must use new materials, and steel pipes must be painted according to Party A’s requirements.
8. Production Safety
1. Other attachments or supplementary agreements other than this contract have the same legal effect as this contract.
2. Party B must strengthen its own safety awareness education, strictly abide by all safety operating regulations of Party A when entering the construction site, and take safety protection measures. If there is a safety accident caused by illegal operations caused by Party B, all parties will be held responsible. Party B shall be responsible for any losses incurred, and Party A shall not bear any responsibility.
3. Party B must conduct safety education for construction workers on a monthly basis. The content of the education and the list of educated persons should be reported to Party A for reference.
9. Liability for breach of contract
1. During the implementation process, if Party B fails to meet Party A’s quality, construction period, civilized construction and other indicators and requirements, and cannot make rectifications in a timely manner , Party B will be responsible for any losses caused by failure to ensure a civilized construction site due to Party B's reasons.
2. After Party B breaches the contract, Party A has the right to terminate the contract and require Party B to compensate Party A for all economic losses caused thereby in accordance with the law.
3. After this contract comes into effect after being stamped by both parties, both parties shall not breach the contract. If there is a breach of contract, it will be handled in accordance with the relevant national laws and regulations.
10. Others
1. This contract is made in two copies. Party A and Party B each hold one copy. It will take effect after Party A stamps it and Party B signs it. The project is completed and accepted and the project payment is settled. It will automatically expire later.
2. After the signing of this contract, Party A will appoint a comrade, and Party B will appoint a comrade responsible for the execution of the terms of this contract and its attachments.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): ________Legal representative (signature): _________
_________year____month__________year____month____day
Scaffolding project contract sample 2
Party A (full name) (hereinafter referred to as Party A)
Party B (full name): (hereinafter referred to as Party B)
In order to clarify the rights and obligations of both parties, in accordance with the Construction Law of the People's Republic of China ", "Contract Law of the People's Republic of China" and "Construction and Installation Project Contract Regulations" and the relevant provisions of the scaffolding project, combined with the specific conditions of this project, and after negotiation between the two parties, this subcontract was signed. Both parties agree to abide by and accept the supervision and inspection of the contract management agency. 1: Project Introduction
1. Project name: Zichen Pearl Building 3-2#
2. Project location: No. 140 Cizi Road, Yanting County
2. Scope of contract: Provide construction scaffolding erection, dismantling and daily maintenance for this project.
1. The scope of scaffolding used in the construction of this project includes: scaffolding on the facade of the main project, protection (steel sheds, carpentry sheds, mixer sheds, etc.), protective passages, tower crane protective railings, and tower crane structures. Erection, disassembly and maintenance of scaffolding such as platforms, four-port and five-edge closures, operating platforms, vertical isolation, ramps, passages, stairwell railings, etc.
2. Installation and dismantling of cantilever steel and production, installation, dismantling and maintenance of embedded parts; including welding, cutting, etc.
3. Installation, removal, and maintenance of safety nets, pick nets, isolation nets, bamboo sheets, and foot guards.
4. Paint the scaffolding materials, steel sections and toe boards provided by Party A for this project.
5. In order to ensure the establishment of a civilized construction site, the scaffolding construction provided by Party B must meet the requirements for the establishment of civilized construction of the project.
6. The outer frame has been erected on the 1st to 14th floors. If there is any rectification, it will be charged separately.
3. Determination and settlement of contract price:
1. The amount of work undertaken by Party B is calculated based on the above-ground construction area settled between Party A and the project department.
2. This contract is a fixed unit price contract, and the unit price is based on each square meter of the construction area above 15 floors.
3. Before the Spring Festival, labor wages will be paid based on 70% of the outer frame area erected. After the Spring Festival, a progress payment of 70 will be paid for every six floors. After the main body is capped, 70 of the total project payment will be paid within one month. The remaining balance will be paid after the outer frame of the project is completely dismantled, and all outer frame materials are collected and stacked in categories. , settle all remaining balances within one month.
4. The operating frame in the elevator shaft shall be determined according to the site requirements. If it is necessary to erect each floor unit, the construction of the elevator operating platform and protective frame will not be within the scope of the contract.
5. After the total contract price is determined, it will be used as the basis for final settlement. If Party B fails to perform according to the agreement midway, the amount of construction work will no longer be settled to Party B as compensation for breach of contract.
IV. Quality requirements:
l. Strictly comply with the current national "Safety Technical Specifications for Fastener Steel Pipe Scaffolding in Construction" (JGJl30-20_) and construction standards and regulations. Conduct project quality inspection and evaluation in the spirit of the document, follow the construction operating procedures, and carry out erection according to specification requirements.
2. Complete the shelf erection work in strict accordance with the quota regulations and construction plan requirements. Party B’s erection items shall be inspected by Party A according to JGJ59-99 standards, and the quality shall meet the requirements.
3. Party B must obey the supervision of Party A’s management personnel.
5. Construction period and progress:
1. Party B of this scaffolding project must organize reasonable personnel, and the construction period shall be as scheduled in accordance with the requirements of the project department. If the construction period is limited, Party A has the right to order Party B to increase personnel in a timely manner. If Party B is unable to increase the number of personnel, Party A has the right to increase the number on its own, and all costs will be deducted from Party B's project payment.
2. Party B shall make careful arrangements and allocate sufficient materials and personnel according to the construction progress plan determined by Party A. If Party B affects Party A's construction progress requirements due to personnel reasons, Party A will be responsible for the delay of one day if the progress is delayed. Party B shall be fined 20_yuan/day·building.
VI. Material management:
1. The materials required by Party B must be notified to Party A 48 hours in advance. Party A must deliver the materials within 30 hours after receiving the notice from Party B. transported to the construction site.
2. The materials used for construction shall be collected in a relatively concentrated place after construction every day, and stacked neatly according to Party A’s requirements, and the fasteners shall be taken back to the fastener shed. Party B has the right to impose corresponding penalties based on the size of the loss due to Party B's disorderly stacking of materials causing losses to Party A.
7. Logistics and safety management:
1. Party B’s construction personnel entering the site must accept the requirements and regulations of the on-site construction management personnel. Party B shall provide employee employment certificates, operation certificates, photos, and copies of ID cards when entering the site. Party A will cooperate in applying for temporary residence permit, arranging accommodation and dining in the canteen.
2. Party B shall provide safety information to employees in their daily lives and before construction. If a safety accident occurs, Party B will be responsible for the cost within 3,000 yuan. Anything beyond the scope will be borne by Party A.
3. During the period when the scaffolding has been accepted and delivered to project operators and put into construction, Party B must strengthen use inspection, perform regular maintenance, discover safety hazards and make timely rectifications to ensure that the scaffolding is in a safe and stable state.
4. Party B’s construction workers are not allowed to dismantle the scaffolding components without authorization, and are not allowed to change their uses at will or overload them.
5. Party B shall hang up safe and civilized construction slogans and signs in different parts according to the requirements of the project department to create a safe and civilized construction atmosphere.
6. If there are any logistics or other problems, Party A will fully cooperate with Party B to solve them.
8. Civilized construction management:
1. Party B must implement the construction plan and image progress of the project department, and strictly implement the standards and operating procedures currently issued by the country.
2. In order to ensure the physical and mental health of employees, Party B’s workers must strictly abide by the relevant life management rules and regulations of the project department.
3. Do a good job of on-site cleaning, so that everyone can clear the site and all materials are used up. After Party B's construction tasks are completed, the used steel pipes, fasteners, bamboo chips and other materials must be cleaned up and stacked neatly in the location designated by Party A. If there is any disorder, penalties will be imposed depending on the severity of the case. The fines incurred by Party B and its subordinate construction workers shall be borne by Party B. The construction site must be kept clean and intact.
4. Party B recruits workers on its own, signs labor agreements with workers on its own, manages the lives of its subordinates, and correctly handles the payment of labor remuneration: Party B is responsible for any failure in management or improper performance of obligations. The resulting liability shall be borne by Party B.
9. Responsibilities and obligations of Party A and Party B:
Party B shall be solely responsible for Party A. During the performance of the contract, whether Party B fails to perform or fails to properly perform its obligations under the contract ( Party A may fine or claim compensation from Party B for any losses caused to Party A due to work stoppage, personnel organization, insufficient labor force, etc.
1. Party A’s responsibilities and obligations:
(1) Party A appoints Party A to fully perform Party A’s rights and obligations and ensure construction quality, safety management, construction progress, and achievement protection , process handover, civilized construction, and full performance of the contract.
(2) Party A will cooperate with Party B to explain the approved scaffolding erection and disassembly plan before construction.
(3) During the construction process, Party A cooperates with the project department to reasonably formulate the construction operation cycle and timely submit project progress plan materials to facilitate Party B to make full preparations for labor reserve arrangements.
(4) Party A will cooperate with Party B to provide necessary construction conditions according to the construction, and be responsible for quality and safety management and supervision.
(5). Conduct quality inspection and acceptance of the subcontracted projects constructed by Party B. The project department has the right to put forward suggestions for rectification of quality and safety problems that occur during Party B's construction, and Party B will make rectifications within a time limit. If Party B refuses to make rectifications or fails to complete rectifications on time, Party A has the right to impose financial penalties on Party B until Party B is removed from the job.
(6) Party A has the right to inspect the quality of Party B’s construction content and whether the construction is carried out in accordance with the plan at any time. Party A may request Party B to make rectifications if any areas that do not meet the requirements are found.
2. Party B’s responsibilities and obligations:
(1) Party B appoints Party B to fully perform Party B’s rights and obligations, ensuring construction quality, safety management, construction progress, achievement protection, and process handover , civilized construction, erection of exterior frames and safety protection, and full performance of the contract.
(2) During construction, materials must be stacked according to the location designated by Party A, and materials for scaffolding removal must be stacked according to Party A’s requirements.
(4) Party B must accept the safety technical explanation of the project department’s completed construction content.
(5) Party B must carry out the erection and disassembly construction in strict accordance with the formulated construction operation plan. After the erection is completed, it must be accepted by the relevant departments and a qualified acceptance sign must be hung before it can be put into use. It is strictly prohibited to use it without a qualified acceptance sign. Otherwise whoever uses it is responsible.
(6) Party B shall obey the arrangements of Party A during construction. If Party B fails to meet the specification requirements during the erection process, Party B shall bear all losses incurred.
(7) Party B must strictly implement the regulations of the project department.
10. Dispute Resolution:
l. Any disputes arising during the performance of this contract shall be settled through friendly negotiation between the parties. If the dispute cannot be resolved through negotiation, it will be resolved in accordance with the law in the local people's court where Party A is located, and all costs incurred due to litigation will be borne by the responsible party.
2. Failure to perform the contract or fail to perform the contract in a timely manner due to force majeure shall be governed by Articles 117 and 118 of the Contract Law of the People's Republic of China.
11. Other matters
1. Any situation not stipulated in the contract shall be resolved through negotiation between the two parties.
2. Matters not covered shall be governed by contract law.
12. This Agreement is made in duplicate. Party A and Party B each hold one copy. This agreement takes effect on the date of signature and has legal effect. It will become invalid after the project payment is settled.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): ________Legal representative (signature): _________
_________year____month__________year____month____day
Scaffolding project contract sample 3
Party A:
p>Party B:
Based on the needs of the project, Party A now entrusts Party B to organize and complete the external scaffolding work of the project by itself. In order to clarify the responsibilities of both parties, follow the principle of equality, voluntariness and consensus through consultation. In principle, in accordance with the provisions of relevant laws and administrative regulations, the following treaties are specially formulated for both parties to abide by and implement. 1. Project location and project name: Haohualing Road, City Center District, Dongguan City: Hongfa Building Project
2. Contract Content:
Exterior scaffolding erection of all-steel structure (steel pipe vertical The pole is 1.3m and the crossbar is 0.9m), maintenance and dismantling materials are removed from the site.
Party B will undertake the work, materials, safety, civilized construction, steel pipes, safety nets, etc. Strictly implement the rules and regulations of the company and relevant superior departments. The grates are erected according to the existing scaffolding standards, and the flat bridges are erected with bamboo boards.
1. Quality: Party B shall organize a construction team with excellent technology and high ideological quality to enter the site based on the external scaffolding construction plan prepared by Party A. The scaffolding erected strictly complies with the existing national quality standards and safe and civilized construction regulations. The products must meet the quality requirements of Party A's construction plan and meet the regulatory standards. If the construction plan requirements are not met and rework is necessary, Party B will be responsible for all costs caused by the rework. According to the actual conditions on site, the external scaffolding is erected with double rows of steel pipes.
2. Safety: During Party B’s operation, the operators must abide by the laws and regulations, conscientiously implement the various construction systems formulated by Party A and the superior department, and ensure the safety of their own team, as well as the safety of Party A’s operations. safety of personnel and other personnel.
3. Civilized construction: In addition to doing your job well, Party A’s on-site civilized construction requirements should be followed to ensure that all materials are cleared after the work is completed, and no redundant scaffolding pipes and any other materials are left on site. Stacking should be done at a designated location. At the same time, personnel are not allowed to get drunk, cause trouble, or fight at the construction site.
3. Duration of use: months. (i.e. 20_year month day to 20_year month day). If it is overdue, Party A must additionally replenish Party B with the extension fee every month, calculated on a per square meter basis per month, or on a daily basis for less than one month.
IV. Contracting unit price (the following items all include one installation and disassembly, including maintenance)
Double-row scaffolding
1-20th floor (pay for additional two-story basement) Floor area) Calculation: Comprehensive unit price: Yuan/square meter (Calculated based on the length of the exterior wall side line [plus four large corners × 1.2 meters equal to the perimeter], multiplied by the height) (Height is based on the top of the parapet) Stair construction height: Yuan/ Square meter (calculated based on the actual installed area) Safety baffle: Yuan/square (calculated based on the actual installed area) Hoisting platform: Yuan/square (calculated based on the perimeter multiplied by the height) Staircase enclosure: Yuan/square (calculated based on the actual installed area Calculation) Rack enclosure: Yuan/square (calculated based on actual construction area)
V. Project cost calculation
1. Double-row scaffolding: based on the length of the outer edge of the building ( The dimensions of the concave and convex positions) plus the expansion of each sun angle of the pavilion by 1 meter. Calculate the total circumference multiplied by the height of the grating to obtain the grating engineering quantity. The total project quantity is multiplied by the unit price to obtain the project payment. The additional project quantity shall be subject to the contract unit price. And it will be included in the fence construction cost and paid according to the progress.
VI. Payment method: Party B shall pay the progress payment at 50% of the total price of the actual completed external scaffolding work each month, and 80% of the total price after the external scaffolding is capped, and the balance will be paid after the external scaffolding is dismantled. The remaining balance must be paid within one month after the scaffolding and materials are withdrawn.
7. Responsibilities of both parties:
Party A’s responsibilities:
1. Complete the positive and negative leveling of the construction site before starting construction, and at the same time be responsible for providing construction services to Party B Drawings, dormitories for Party B’s workers, water and electricity (the cost of water and electricity is based on 5 kilowatt hours of electricity per person per month, Party A is responsible for the cost of water within 2 tons, and Party B is responsible for the excess. The excess cost will be deducted from this month’s progress payment). Material storage area, coordinate the relationship between various teams. Party A shall not dismantle the external scaffolding that Party B has completed without authorization, or use it with excessive weight. Party B will not be responsible for the consequences if this occurs.
2. If a tower crane is installed on site, the existing tower crane must be provided to transport Party B’s scaffolding materials. Otherwise, Party A will compensate Party B for the vertical transportation costs incurred due to the lack of machinery.
Party B’s responsibilities:
1. Obey the instructions of the company’s construction workers, construct according to the requirements of the construction plan drawings and meet Party A’s construction requirements, and entrust management personnel to the construction site to be responsible for the management of safety, Quality, progress,
2. Workers must wear safety helmets and safety belts during suspended construction. They are not allowed to wear slippers to work. It is strictly prohibited to work after drinking. Party B is responsible for all safety accidents during construction.
3. During the use of scaffolding, it must be inspected, repaired and reinforced frequently to ensure that it meets the construction requirements.
4. Party B must implement worker attendance in accordance with Party A’s attendance system for on and off work, and submit attendance sheets to Party A every month.
5. Party B must provide Party A with a salary schedule every month and pay wages under the supervision of Party A. The salary schedule must be signed and fingerprinted by the payee.
8. During the implementation of the contract, both parties adhere to the principles of project responsibility, sincere unity, and close cooperation. ?9. Liability for breach of contract: If Party B fails to meet Party A's progress and schedule requirements, Party A has the right to order Party B to withdraw from the site and settle the project payment at 70%. If Party A breaches the contract: Party B who fails to pay the progress payment or pays insufficient payment has the right to take any action caused by the suspension of work. Party B will not be responsible for any consequences.
10. This contract is made in four copies, with Party A and Party B each holding two copies. It will become legally effective immediately after being signed by both parties. This contract will be finalized after all the work is completed and the settlement is confirmed by both parties and Party A pays off the money to Party B. Natural termination.
11. Matters not covered in this contract shall be resolved through separate negotiation between the two parties.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): ________Legal representative (signature): _________
_________year____month__________year____month____day
Scaffolding project contract sample 4
Party A: _______________
Party B: _______________
Party A will contract the scaffolding sub-projects of the _______________ project to Party B. The following agreement has been reached in accordance with relevant regulations and on the principle of equality and mutual benefit.
1. Project contracting content:
The main contents of Party B’s construction of all scaffolding, safety protection, and unloading platform are as follows.
1. Assemble and dismantle the outer frame and lift the floor frame until the main body is completed.
2. The safety passage within the outer frame, the dismantling of the platform frame, the protective frame body required for safety, the platform and other erection work scope.
3. Erection and dismantling of safety nets, dense mesh nets and surrounding platforms.
4. Build and dismantle each layer of the unloading platform.
5. Horizontal and vertical transportation of steel pipes, fasteners, etc., and on-site stacking.
6. Erection and disassembly of the reinforcement frame of the post-cast belt.
7. As well as steel sheds at construction sites, carpentry sheds and electrical box protection, etc.
2. Subcontracting method: _______________.
3. Subcontracting unit price:
1. The subcontracting unit price is _______ yuan per building square meter.
2. The area of ??the mezzanine is not calculated based on the square meters of the building as shown in the drawings.
3. Floor protection, opening protection, elevator shaft and edge protection, and hard protection of each layer of horizontal pocket nets on each second floor are not separately charged, including reinforcement of each layer's post-pouring tape, etc.
IV. Payment method:
1. ____ will be allocated monthly from the foundation to the main ____ layer, and ____ project payment will be paid upon completion of the main body capping.
2. The frame erection progress payment is calculated based on ____ per square meter. The dismantling of the frame is calculated as ____ per square meter.
3The remaining ____ project payment will be paid within ____ months upon completion.
V. Project quality requirements:
1. It is required to be erected in strict accordance with relevant national standards and regulations, with horizontal and vertical levels, neat and standardized appearance, solid shelf laying, and no probe boards. , the materials are cleared after the work is completed.
2. The scaffolding erected by Party B must pass the acceptance inspection.
3. Party B needs to set up an unloading platform and an external transfer platform that must meet the acceptance criteria.
4. It is required to ensure that safety inspection and acceptance are up to standard.
5. The erection requirements shall be based on the technical explanation and construction plan.
6. During the main construction, lay 2 scaffolding boards on each operating layer around the outer edge of the frame.
7. Hard protection is provided at the bottom of the cantilevered scaffolding, and horizontal protection is laid on each layer.
6. Construction period requirements:
1. According to the main construction progress, the outer frame must be one step above the structural construction level.
2. The protective frame must meet the time requirements for safe construction, safe access, and safety protection. The floors where the main frame is removed must be protected in time.
7. Safety requirements:
1. Party B shall strictly abide by the various safety operating procedures formulated by Party A, the verification and assessment system for special operations personnel, the safety production position responsibility system, and the safety management system. Production reward and punishment system, safety education system, three-level education system, etc.
2. During the construction period, Party B assigns ______ to be responsible for the safety and fire prevention work of the project. Party A supervises, inspects and provides guidance. Party B must rectify the hidden dangers investigated and dealt with within a time limit. If rectification is not made after the expiration date, Party B will be charged each time. ____ yuan fine. Party B's construction site personnel must wear protective equipment correctly, and shelf workers must wear safety belts. If Party B violates the rules, Party B will be fined ____ yuan per person per time.
3. Party B’s personnel must carefully inspect the operating facilities, equipment, and tools in the construction area. If any hidden dangers are found, construction should be stopped immediately, and the relevant units must implement rectifications before construction can begin.
4. Party B shall operate in strict accordance with Party A’s safety technical briefings. Party B shall be responsible for any safety accidents caused by Party B’s brutal and unauthorized construction.
5. Party B’s personnel shall not dismantle or modify the scaffolding, various safety facilities, and safety warning signs at the construction site without authorization. If it is really necessary to dismantle it, it must be approved by the person in charge of the construction site and the safety management personnel assigned by Party A. Demolition can only be done after agreeing and taking necessary and reliable safety measures. The party B shall be held responsible for the consequences of unauthorized demolition by Party B's personnel, and Party B shall be responsible for any work-related injuries or accidents.
6. Party B must provide a list of on-site workers and relevant certificates.
7. If a safety accident occurs due to its own reasons, Party B will be responsible. If a safety accident occurs to other team members due to the team, Party B will bear the costs.
8. Civilized construction site requirements:
1. All materials used by Party B on site must be neatly stacked.
2. If violations of civilized construction occur, Party A will punish Party B by ____ yuan each time.
3. The construction site must be clean upon completion.
9. If there are any unanswered matters, both parties will separately supplement the contract and negotiate to resolve them.
10. If Party B disobeys on-site management or fails to meet the contract requirements, Party A has the right to terminate the contract.
Signature of Party A’s representative: ___________Signature of Party B’s representative:___________
Seal: ___________________Seal: ___________________
_______year______month_ _____day_______year______month______day
The above is what I shared today, I hope it can help everyone.
- Previous article:Introduce pandas in English
- Next article:Congratulatory message of Hangzhou Asian Games
- Related articles
- Preferential income tax policies for small and micro enterprises in 2022
- National day promotional advertising slogan daquan
- Father-in-law's birthday wishes
- Golden Mango Cultural Tourism Festival Promotional Slogan
- "ICBC = Aicun", what is Bank of Communications?
- Civilized public transportation slogans
- What is the population of Canada?
- What is the working principle of BMP series electronic belt weigher?
- The news you heard from others is 400 words.
- Work report of the community working team