Joke Collection Website - Bulletin headlines - House demolition construction safety responsibility letter

House demolition construction safety responsibility letter

Safety responsibility letter for house demolition construction (general 3 articles)

The safety responsibility letter is the content specification for the enterprise to implement the safety production responsibility system. The leaders at all levels of the enterprise, functional departments, and related projects Technical personnel and production workers have their own safety responsibilities during the production process. Below is a house demolition construction safety responsibility letter that I compiled for reference.

House Demolition Construction Safety Responsibility Letter 1

Party A:

Party B:

In order to clarify the safety management responsibilities of both parties and the measures that should be taken Safety measures, conscientiously implement the work safety policy of "safety first, prevention first", prevent major accidents from occurring, and safeguard the safety of people's lives and property. According to the "Work Safety Law of the People's Republic of China" and "Construction Project Safety" Production Management Regulations and other relevant laws and regulations, the following agreement has been reached on safety construction matters for the demolition of old office buildings:

1. Party A’s responsibilities

(1) Timely communication and notification of relevant matters The functional departments shall issue important instructions and requirements on production safety and urge Party B to implement the safety construction work.

(2) Violations of safety production operating standards shall be reported to relevant functional departments for investigation and punishment in a timely manner.

(3) If a safety accident occurs, in addition to reporting to the police in time, it must be reported to the relevant functional departments as soon as possible, and the accident must not be delayed or concealed. At the same time, protect the scene, maintain order, and organize forces to cooperate with relevant departments to handle the situation.

(4) Party A shall educate Party B on safety knowledge and urge Party B to inspect the houses to be demolished for potential safety hazards.

(5) The cost of demolishing houses and cleaning up construction waste is *** yuan (RMB: ), which will be paid to Party B after Party A raises the funds in place.

2. Responsibilities of Party B

(1) Party B conscientiously implements the "Work Safety Law of the People's Republic of China", "Regulations on Production Safety Management of Construction Projects" and other relevant safety production regulations and policies.

(2) Party B is responsible for house demolition, building demolition, garbage removal, etc.

(3) When Party B is responsible for the dismantling process, the operating personnel must wear safety helmets, fasten seat belts, and take effective preventive measures.

(4) Before demolishing an old house, the power supply should be cut off and the natural gas should be turned off. When the building is demolished, protective frames and protective nets should be erected. Construction workers should wear safety helmets and hang safety ropes in accordance with regulations. They should be effective Control dust, noise and vibration during the construction process, transport construction materials, and dispose of construction debris and various wastes in accordance with relevant regulations.

(5) Party B shall not engage in the following behaviors during house demolition construction: throwing waste materials at high altitudes; backfilling toxic and hazardous wastes with earth; discharging slurry water directly into urban drainage facilities or rivers without treatment; failing to comply with regulations Install and melt asphalt at the construction site or burn linoleum, paint and other substances that produce toxic and harmful smoke, dust and gas; no office, living or non-operational stay in buildings to be demolished; other behaviors that should be prohibited.

(6) Strengthen construction site management and improve various safety protection facilities. If a safety accident occurs, rescue forces must be organized immediately to minimize casualties, and the accident shall be reported in a timely manner without delay or concealment of the accident report. After a safety accident occurs, it is necessary to protect the scene, actively cooperate with relevant departments in investigation and evidence collection, and handle the aftermath in accordance with responsibilities and relevant regulations to eliminate safety hazards. If a safety accident occurs, Party B shall bear all responsibilities. Party A does not assume any responsibility.

(7) Party B must purchase insurance for the workers before demolishing the house.

3. Others

(1) This letter of responsibility is made in duplicate, with Party A and Party B each holding one copy.

(2) This agreement will take effect from the date of signing. Party B will abolish it after cleaning up the construction waste from the demolition of the old house.

Party A (official seal):

Signature of the representative:

Party B (signature and fingerprint):

Year 20xx Japan House Demolition Construction Safety Responsibility Letter 2

In order to strengthen the safety construction management of house demolition, conscientiously implement the safety production work policy of "safety first, prevention first", prevent safety accidents from occurring, and protect people's lives and property Safety, in accordance with the "Production Safety Law of the People's Republic of China", the "Regulations on Safety Production Management of Construction Projects" and other relevant laws and regulations, Party A entrusts Party B to conduct inspections on the east side of the Ring River to the north of Xiangyang Road and south of Weixu South Road. 28 two-story houses (the specific location is designated by Party A) will be demolished. After negotiation between the two parties, a letter of responsibility for the safety construction of the house demolition will be signed.

1. Conscientiously implement laws and policies related to production safety such as the Production Safety Law of the People's Republic of China and the Regulations on Production Safety Management of Construction Projects.

2. The safety production system should be improved, a responsibility system with the legal representative as the first responsible person should be established, emergency rescue measures should be improved, and safe construction should be ensured, so that "the organization is guaranteed, the tasks are required, and the work is completed Check and take preventive measures.”

3. Clarify the safety production responsibilities for house demolition, and sign a safe and civilized construction responsibility letter with the project leader. Containment facilities and warning signs will be set up around the construction site. Fire protection facilities should be kept in good standby condition. Temporary facilities, machinery and equipment, and building materials should be stacked according to the general construction plan to ensure that the entrances and exits and the site are smooth and tidy.

4. Before demolishing a house or structure, the power supply and natural gas should be cut off. Protective racks and protective nets should be erected when demolishing buildings. Construction workers should wear safety helmets and hang safety ropes in accordance with regulations. They should be effective Control dust, noise and vibration during construction, transport construction materials, and dispose of construction debris and various wastes in accordance with relevant regulations.

5. Party B shall not engage in the following behaviors during house demolition construction: throwing waste materials at high altitudes; backfilling toxic and hazardous wastes with earth; discharging slurry water directly into urban drainage facilities or rivers without treatment; and not having devices that comply with regulations Melting asphalt or burning linoleum, paint and other substances that produce toxic and harmful smoke, dust and gas at the construction site; staying in buildings that should be demolished for office, living or non-operational purposes; other behaviors that should be prohibited.

6. Actively cooperate with the supervision, inspection and guidance of relevant departments. For existing problems, formulate rectification plans such as rectification measures, funding guarantees, and completion dates, and take effective measures in a timely manner to eliminate safety hazards and comply with regulations. Submit written materials on the safety inspection and rectification status within the specified time, and report the rectification status to Party A. House Demolition Construction Safety Responsibility Letter 3

Party A:

Party B:

In order to strengthen the construction safety management of the house demolition project on the Old People's Hospital land, strengthen the construction personnel To ensure that the house is demolished safely and without accidents, Party A and Party B have signed the following safety construction responsibility letter:

1. Safety management objectives

Party B contracts the house on the land of the Old People's Hospital in the county. The demolition project must be completed on time, with high quality and quantity, and to ensure that there are no casualties, serious injuries, and zero mortality during the house demolition construction.

2. Party A’s safety management responsibilities

1. Conscientiously implement relevant national and local safety management regulations, and urge Party B to organize plans and measures for house demolition safety construction before demolition construction Report to the County Housing and Urban-Rural Development Bureau Safety Supervision Station for review and filing, and handle safety procedures such as personal accident insurance for construction workers and surrounding pedestrians in accordance with the requirements of the Safety Supervision Station.

2. Entrust the safety management personnel of the supervision unit to supervise the safety construction management of the entire process of house demolition, and promptly put forward rectification suggestions and supervise rectification when hidden dangers are discovered to ensure that the house demolition is safe and accident-free.

3. Party A has the right to go to the site to check the safety inspection diary of the safety management personnel from time to time, and urge Party B to implement the rectification opinions put forward by the safety officer.

4. Before the house demolition construction, Party A shall notify the power supply, water supply, telecommunications and other relevant departments to carry out the relocation of all lines to ensure the safe and smooth progress of Party B's house demolition construction.

3. Party B’s safety management responsibilities:

1. The safety management personnel of the house demolition construction unit must hold a certificate to work. The construction personnel must undergo safety technical training before taking up their posts. The construction process Construction must be organized strictly in accordance with the established and approved house demolition safety construction technical organization and implementation plan.

2. In addition to insuring personal accident insurance for all construction workers who demolish the house, Party B also needs to insure personal accident insurance for surrounding pedestrians, and submit the insurance policy to Party A and Party A before the house is demolished. Filing at the safety supervision station.

3. Party B pays Party A a construction safety performance bond of RMB 200,000 as promised. The house demolition contract shall be handed over to Party A within three working days after the signing of the house demolition contract. It will be refunded (without interest) if the house is demolished and the residue is cleared and the acceptance is passed (without interest). If no safety accidents occur, the full amount will be refunded (without interest). interest).

4. At the house demolition site, the full-time safety managers assigned by Party B must communicate with the safety managers of the supervision unit entrusted by Party A, and promptly rectify the rectification opinions put forward by the safety managers.

5. Warning signs should be set up at the construction site, and safety protection facilities should be set up at public passages in downtown areas. Railings and other isolation devices should be installed on the ground. At stairwells, floor edges, and passage entrances, When working on the balcony, protective measures such as isolation railings and scaffolding must be installed.

6. House demolition contractors must carry out civilized work. Relevant warning signs and slogans must be hung at the house demolition site; measures must be taken to control and evacuate pedestrians and vehicles in the aisles; effective measures must be taken to deal with dust and noise. Control methods should be adopted to try not to affect the daily lives of residents.

7. After signing the house demolition contract, Party B will bear all medical expenses and compensation expenses for all casualties and injuries that occur during the house demolition construction process. At the same time, Party A will deduct 50% to 100% of Party B's compensation depending on the severity of the accident. % of the safety construction performance bond.

8. This letter of responsibility is made in five copies. Party A keeps one copy, Party A has one for finance, Party B has one for filing, one copy is sent to the County Housing and Urban-Rural Development Bureau Safety Supervision Station for filing, and one copy is sent to the entrusted supervision unit. This responsibility letter shall take effect from the date of signing.

Party A (seal): Party B (seal):

Legal representative: Legal representative

Leader in charge: Person in charge: Leader in charge: < /p>

Person in charge:

Time of conclusion: year, month and day;