Construction project application report

Application report of construction project (6 general remarks)

With the continuous progress of society, we will inevitably come into contact with the report, and the technical terms involved in the report should be explained clearly. On hearing the report, it delayed the recurrence of lazy cancer. The following is the construction project application report that I collected and sorted out. Welcome everyone to refer to it, I hope it will help you.

Construction Project Application Report 1 County Development and Reform Commission:

The mining machinery trading market project implemented by our town was approved by the Provincial Department of Land and Resources for 20xx-5 batches 1. 1657 hectares, sold through public listing 1. 1045 hectares, leaving 0. 06 12 hectare (6 meters wide and 0/02 meters long). Due to the offset of coordinate points, land cannot be provided. The plot is located between Wan 'an machinery trading market and the planned gas station, which is limited by the plot and is not easy to be listed for sale. Therefore, on July 15, 20XX, the town party committee decided to apply to the county government for adjusting this 0. 06 12 hectare has been allocated to Fengjing Town People's Government for municipal road construction, with a total investment of about 654.38 million yuan. Please approve this project now.

I hereby ask for instructions.

Fengjing Town People's Government

20XX July 3 1

2 Jiangshan City Development and Reform Bureau construction project application report:

Building 1 #- 10 #, a state-owned land in the community of Dongtangshan, Shangyu, has been auctioned in the early stage and all the houses have been completed. The application report of road construction project has also been completed in the previous sewage and drainage project. In order to improve the infrastructure construction, Shangyu Town plans to harden the roads in this plot. The project requirements are as follows:

1. Project name: Tangshan Road Hardening Project in Shangyu Town, Jiangshan City

2. Project construction address: Dongtangshan, Shangyu Town, Jiangshan City

3. Project Owner: Shangyu Town People's Government

Four. Land, content and scale of the project construction: the project implementation area is about 4000 square meters, and the project construction contents include: road hardening and parking lot site hardening.

Verb (abbreviation of verb) Project construction period: 20XX from April to June.

Investment estimation and financing scheme of intransitive verb project: the total investment of the project is estimated to be 650,000 yuan, and the funds needed for construction are raised by Shangyu Town People's Government. I sincerely hope that your bureau can set up a project in time.

I hereby ask for instructions, please reply.

Shangyu Town People's Government

XXXX,XXXX,XX,XX

3 changge city Development and Reform Commission construction project application report:

The total length from Wangzhuang to Dama Road in Shigu Town is 5,500m, which runs through seven administrative villages, including Wangzhuang, Huayuan, Xiangfuliang, Hezhaili, Nanzhangzhuang, Chaoyang and Dama, and directly serves the population 120xx. It is an important township road in Shigu and is of great significance to the economic development of Shigu. In recent years, due to the rapid development of economy, roads can no longer meet the needs of people's traffic, and the width of road pits is not enough to apply for the report of road construction projects.

In order to promote the sound and rapid development of Shigu economy and create a good living environment for Shigu people, our town decided to upgrade the road to county road. The standards are: concrete pavement with a width of 7 meters and a thickness of 20 centimeters, and green belts with a width of 2 meters on both sides of the road, in which the renovation cost of the original carriageway is 1.87 million yuan (the renovation area of the original carriageway is 220xx square meters, and the cost is 85 yuan per square meter). The newly widened carriageway is 2.23 million yuan (the newly widened carriageway covers an area of 1.65 million square meters, and the cost is 1.35 yuan per square meter), and the side ditch and green belt project (excluding greening) is 660,000 yuan, with a total investment of 5.29 million yuan. This project is an investment project in our town, which conforms to the overall land use planning and town planning.

If not, please reply.

Shigu Town People's Government

20XX August 2nd

4 xx City Land and Resources Bureau Industrial City Construction Project Application Report:

Our unit is responsible for the introduction and construction of xxx project, and has completed the relevant preliminary work. We hereby declare the pre-examination of land for construction projects. The relevant information of this project is reported as follows:

1.xx qiangneng new wall materials co., ltd. is an investment project of the city tea culture festival, specializing in the research, development, production and sales of new wall materials, with an annual output of 250,000 cubic meters of aerated concrete blocks. .

2. Project Overview: It is planned to build a xxxxx store.

3. Project construction background: At present, the company has reached an intention with xx Company, and has submitted a franchise application to reach a consensus on matters related to project construction. After the project site selection is completed, someone will confirm the site selection in xx.

4. Construction site:

5. Main construction content and scale: xx

6. Product and engineering technical scheme: provided according to the requirements of xx.

7. Main equipment selection and supporting projects: provided according to the requirements of xx.

8. Investment scale and financing plan: 30 million yuan, raised by itself.

No, please instruct!

Xxx company limited

Xx year xx month xx day

5 county education and sports bureau construction project application report:

In order to further improve the level of running a school, improve the conditions of running a school, optimize educational resources, solve the problem of insufficient classrooms and teaching rooms caused by the continuous expansion of the school scale, and create a more harmonious, comfortable and beautiful educational environment for the education of our school, we hereby apply to the higher authorities for construction projects.

First, the status quo of the school

With the continuous progress of urbanization construction in a town, our school is located in the center of a town, serving three administrative villages, such as a village, a village and a mountain village. The population is relatively dense, with a service radius of about 3 kilometers and a radiation population of nearly 30,000. There are nearly 1500 school-age children in the jurisdiction, and the original teaching charity classroom will not meet the needs of people's children. The school covers an area of 10876 square meters, and the building area is about 1200 square meters. There are 16 classes, 65438 students +0 100, and 43 faculty members. It is a large-scale primary school.

At present, the school has two teaching buildings on the second floor, which can accommodate 18 classes, and the construction area is only about 1 100 square meters, one of which is a class C dangerous building, barely meeting the current teaching needs. At present, the teaching building is in general condition and has water leakage, which neither meets the requirements of running a school nor is conducive to students' study. At the same time, the standardization construction of schools, such as laboratories, instrument rooms, sports rooms, music rooms, libraries, etc. , are all mixed together in disorder. These problems urgently need the help of superior leaders.

Second, the necessity of project construction

1, education development plan

The number of students in our school is increasing year by year, and the scale of running a school is expanding year by year. With the expansion of scale and the development of education, the existing teaching conditions in our school have exceeded the saturation of normal running. In recent years, with the increase of school-age children year by year, it is planned that the total number of students in our school will reach 1300 in the second half of 20xx. According to the class size standard of standardized schools in our province, there will be 24 classes, far exceeding the current school limit. In this way, the contradiction between the further expansion of the school scale and the lack of hardware facilities will become increasingly prominent and become the most important factor affecting and restricting the development of the school.

2. Main problems.

Judging from the overall infrastructure construction, the current requirements of qualified schools and the expanding scale of running schools, there are still many difficulties and problems in the educational development of our school. Focus on:

First of all, there is a serious shortage of classrooms in schools.

Second, there is a serious shortage of auxiliary teaching rooms such as function rooms, which restricts the overall improvement of school-running level.

In view of this, our school urgently needs to build a new comprehensive teaching building. Please leaders to help solve as soon as possible.

Three. Project construction scale and budget

1, project construction scale

It is planned to build a new five-story teaching building with a total construction area of about 2250 square meters and 30 classrooms in the middle of the teaching building before and after the original school (60 meters long and 7.5 meters wide) to solve the problem of insufficient school buildings and teaching auxiliary rooms.

2. Budget

The comprehensive teaching building budget is 1200 yuan/m2, totaling 2.7 million yuan.

Fourth, the project benefits:

The school is a place to teach and educate people, and the perfection of the classroom is the premise of teaching and educating people in the school. After the project is completed, it will not only improve the conditions and level of running a school, but also provide a brand-new platform for students to study, live, communicate and grow. It is also conducive to the adjustment of school layout and the policy of centralized education, more conducive to the balanced development of education, and will greatly promote the development of education in our school.

Therefore, I hereby apply to the higher authorities for approval.

Sincerely present

Xx county, xx town, xx school

20xx x month xx day

Construction project application report 6 I. General situation of the project:

1, project name:

2. Project location:

3. Building area and number of floors:

4. Quality objective: achieve the qualified objective stipulated in the contract.

5, the construction unit:

6, supervision unit:

7. Design unit:

8. Geological exploration unit:

9, the construction unit:

10. Engineering features: the number of engineering floors, structural form, structural safety grade and structural design service life are all years. The fortification intensity in this area is less than 6 degrees. As this project is a building, seismic design is carried out according to the key fortification categories, and seismic Class C treatment is carried out. The concrete strength grade of this project: hole pile C30, ground beam C30, column C30 of one to three floors, beams, slabs and stairs C30 of each floor. The project will be launched and submitted for acceptance.

Second, the project completion profile:

According to the contents of the contract agreed by all parties involved in the construction, the project design and construction will complete the task according to the required project and meet the quality grade requirements stipulated in the contract. During the design and construction of this project, all laws and regulations, quality assurance materials, construction management and ex-factory inspection reports of building materials, components and equipment will be strictly implemented and kept complete and effective. According to the contents agreed in the construction drawing, the completion review is as follows:

1. Completed design projects: foundation, main body, indoor and outdoor decoration works; Water supply and drainage engineering, fire fighting engineering; Building electrical installation project; Roofing engineering; famous book

Review basic engineering, main engineering, indoor and outdoor decoration engineering and roofing engineering; Water supply and drainage works are qualified; Building electrical engineering is qualified; Fire engineering is qualified.

2. Technical files and construction management materials: technical files such as pre-construction and construction drawing design review are complete after review; Supervision technical files and management information are complete; Construction technical files and management information are complete.

3. Test report: the test report of main building materials (steel, cement, brick, sand, stone, waterproof materials, electrical materials, etc.) after examination. ) is complete and meets the requirements.

4. Project quality guarantee: the project quality guarantee has been signed, and the quality guarantee and the house use manual have been compiled.

Three. Supervision and rectification:

In the process of each division and sub-project, the construction, design, supervision, construction and other units cooperated closely, and the inspection work of each project was well completed. During the inspection, the quality is strictly controlled, and where rectification is needed, the rectification will be made as soon as the convenience of construction is put forward. After the rectification, the supervisor will re-examine and accept, and the next working procedure can only be carried out after it meets the standard requirements.

In the process of construction, the supervision unit carried out the construction in strict accordance with the requirements of national engineering quality standards, and cooperated with the contractors to complete the construction supervision task of this project. Every working procedure in the process of engineering construction is carried out in strict accordance with the supervision outline and procedures, which ensures the engineering quality.

Four, the acceptance unit:

According to the requirements of the Interim Provisions of the Ministry of Construction on the Completion Acceptance of Housing Construction Projects and Municipal Infrastructure Projects, the construction unit organized the preliminary inspection and formal acceptance of the completed projects in 20xx, and the construction, design, survey, supervision, construction unit and supervision station that participated in the completion acceptance met the requirements.

Verb (abbreviation of verb) acceptance and rectification:

When the project is accepted, the construction, supervision, construction, design and other units put forward acceptance opinions. In view of the problems raised in the acceptance, the construction unit has completed the rectification, and the relevant units have passed the re-inspection. The project also carries out safety tests such as indoor environment test and equipotential test. The test report is provided by the quality supervision department, and the test result is qualified.

VI. Overall evaluation of the project:

Through the close cooperation of construction, design, supervision, construction and supervision units, the project was successfully completed. Meet the completion acceptance conditions, and now formally organize the completion acceptance.

Project leader of the construction unit: (seal)

;