Joke Collection Website - Bulletin headlines - Tianjin national day light show 20 19 time and address+Tianjin traffic control+? Architectural part
Tianjin national day light show 20 19 time and address+Tianjin traffic control+? Architectural part
Light show: the night light show of the whole city
Opening and closing time: September 29th to1October 8th, every night 19: 30 to 23: 30.
Night lighting facilities along the Haihe River in the central city, key lines and the Olympic Sports Center, including bridges, water systems, landscape buildings, tower landscape platforms, commercial plaques and outdoor advertisements.
Connect the lighting landscape of points, lines, groups and films in series to show the dazzling night lighting in Tianjin.
The Olympic Sports Center and the banks of Haihe River jointly performed a lighting group, re-edited and played the slogan picture with the characteristics of the National Day celebration, and synchronously scrolled along the electronic big screen along the street.
Ancient Culture Street Peking Opera Light Show
I still remember the Peking Opera Light Show staged at the Guwen Street Opera House during the World Expo on September 6, and it appeared again during the National Day.
Specific performance date: 65438+ 10/0/-6.
Ancient Culture Street Opera House is located directly opposite Tianhou Palace. The opera house that people see now was rebuilt in 1985. The original Opera House is only 5 meters away from Tianhou Palace, and it is the earliest open-air stage in Tianjin. It is also the earliest place for Tianjin people to entertain themselves. The existing theater is12m high,10m wide and1/0.5m deep. The stage is located on the second floor, connected back and forth.
Due to the heavy passenger flow during the Double Eleven period, all performances from June 65438+1 October1to June 6 will be held in the theater. Although the venue is limited, the performance quality remains the same.
Fant UAV light show
65438+1At 20: 50 on October 2 nd to 7 th, there will be a drone performance over Tianjin Fangte Castle.
This drone performance will combine lighting, sound effects and other elements to present "Dove of Peace and Me? China and other different patterns and characters.
In addition, the lovely designs of Xiong Da, Xiong Er and Logger Vick will also shine over the castle, presenting children with different childlike colors.
The real-life modeling article takes Tianjin Auditorium as the center, decorating the surrounding roads, running through the east, west, north and south, and the rendering center is bright; Light-box national flags are set up on Friendship North, Friendship Road, Friendship South and Waterway; Rod-type national flags are set up on Zijinshan Road, Meijiang Road, Machang Road, Waterfront West Road and Hotel West Road.
More than 65.438 million large-scale real-life sculptures, such as Yinhe Square, the intersection of Youyi South Road and Meijiang Road, the square in front of East Station, Nanjing Road Earthquake Monument, Minyuan Square, Friendship Park and Youyi Road, Hedong Park, Shizilin Street, around the Olympic Sports Center, Xigu Park, Yangliuqing Square and Meijiang Convention and Exhibition Center, will be unveiled.
The garden department has arranged more than 200 flower beds around key parks, scenic spots, road nodes and Olympic Sports Center in the city, including 65.438 million fine flower beds with an area of 65.438 million square meters. The area of grass flowers in the city has reached more than 60,000 square meters, with more than 60 kinds of flowers and more than 2.6 million plants.
Before the National Day, two comprehensive parks in the urban area will be decorated with large-scale flower viewing spots, such as the water park with two large flower beds at Dongmen and Northwest Gate, as well as the zoo, Nancuiping Park, Shuixi Park, Changhong Park, Xigu Park, People's Park and Hedong Park.
Heping District is mainly composed of three-dimensional flower walls and flower beds. There are three intersections of Jiefang North Road and Harbin Road, Baoding Road and Datong Road, and two intersections of Chengdu Road and Hebei Road and Nanjing Road, and flower beds are arranged in the area of Fifth Avenue. Heping District also has two three-dimensional flower walls at the intersection of Tai 'an Road and Hubei Road, just opposite the Peace Hotel in Dali Road.
In Hexi District, flower beds, flower styles and flower stands are arranged at the key nodes of Friendship Road, Waterfront West Road, Friendship Park and Cultural Park, and at the intersection of Dikou and Friendship Road.
Nankai District has set up a flower combination scenic spot around the Olympic Sports Center, the Drum Tower, the intersection of Hongqi Road and huanghe road, and the Haihe River hydrophilic platform.
Nankai District, Hedong District and Hebei District have all arranged flower beds and flower borders along the Haihe River. There are many groups of flower borders in Yifeng District, Hebei Province.
On both sides of Tianjin Avenue, several groups of flower borders are arranged by using perennial flowers, ornamental grass and grass flowers.
In Beichen District, flower beds are arranged in Beichen Park, Beijing-Tianjin Highway and Beichen Road, and 12 flowers are placed. Other districts also arranged flower beds, flower borders and styles to celebrate the National Day.
In terms of plant selection, red and yellow are the main colors, making full use of suitable flowers in Tianjin, choosing flowers with long flowering period, and choosing ornamental grass and foliage plants to make landscapes.
The main plants are Begonia Seasons, Petunia, Scutellaria barbata, Corydalis, Lilac, Peacock Grass, Dutch Chrysanthemum, Canna, Chinese rose, a bunch of red flowers, triangular flowers, deciduous trees, banyan trees, five-colored grass, asparagus, etc., and the ornamental garden plants are particularly rich.
The garden department promoted the growth of the city flower rose, and controlled the flowering period by pruning, so that the city flower rose opened neatly at the end of September 65438+1early October.
The main flower viewing spots are Munan Park, Earthquake Monument, Hedong Park, Hedong Rose Garden, Qiao Yuan, People's Park, Changhong Park, Rose Garden on the Eighth Street of Development Zone, and Rose Garden in high-speed railway station of Development Zone.
Traffic Control In order to ensure the flag-raising ceremony to celebrate the 70th anniversary of the founding of New China in Tianjin, it is decided to take traffic restriction measures on some roads: from 8: 30 to 65: 438 on October 0, 201kloc-0, Friendship Road (from Binshui Road to Pingjiang Road) and Binshui Road (from Youyi Road to Hotel West Road) are closed to all vehicles and pedestrians.
Construction section 1. Due to road construction, from August 23rd, 20 19 to February 22nd, 20 19, the east half ring of Huayuan Road (Chengde South Road-Chengde North Road) and Dandong Road (Chifeng Road-Huayuan Road) in Heping District were closed to traffic. It is suggested that vehicles and pedestrians bypass Chifeng Road and Huayuan Road. Passing vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoiding. 2、
Due to road construction, Qi Jing Road (Beichang Road-Qiwei Road) was closed to motor vehicles from August 24, 20 19 to June, 20 19+02. Passing vehicles can bypass Liu Jing Road, Qiwei Road, Bajing Road, Beichang Road, Bawei Road, Jiuwei Road and Qi Jing Road. Vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoid.
3. Due to the construction of Youyi South Road Station of Metro 10, from August 2065438 17 to October 30, 2020/KLOC-0, the carriageway and sidewalk of Youyi South Road (intersection with Zhujiang Road) and Zhujiang Road (east and west sides of the intersection with Youyi South Road) were partially constructed. Vehicles and pedestrians passing through the construction section can pass through the newly-built guide roads on the west side of Youyi South Road and the south side of Zhujiang Road. During the construction period, motor vehicles are prohibited from going straight to Zhujiang Road and turning left into Youyi South Road at the east and west sections of the intersection of the leading auxiliary road of Zhujiang Road and the leading auxiliary road of Youyi South Road, and all motor vehicles are prohibited from turning right into Youyi South Road and bypassing Meijiang Road and Zuojiang Road. Vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoid.
4. Due to the delay in the construction of drainage pipelines and roads, from August 28th, 20 19 to October 28th, 2020 10, motor vehicles are prohibited from passing through Wuma Road (Huang Wei Road to Riwei Road), while motor vehicles bypass Yu Wei Road, Zhou Wei Road, Riwei Road, Sima Road, Sanma Road and Ermayina Road, and non-motor vehicles are pushed by sidewalks. Occupy part of Wuma Road (west of Huang Wei Road, Riwei Road to Lv Wei Road). When the road on the construction section becomes narrow, passing vehicles must pass according to traffic signals and slow down to avoid.
5. Due to the construction of drainage pipeline, the road at the intersection of Zhenli Road and Taixing Road was narrowed from August 20 19 to June 20 1 9 1 9, and vehicles were prohibited from turning left from east to south on Zhenli Road. Turn left and bypass Jingjiang Road, Jiangdu Road and Hongxing Road. Passing vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoiding.
6. Due to road widening and reconstruction, Jiangyuan Road (east of Tuanjie Road150m to west of Tuanjie Road150m) and Tuanjie Road (Jiangyuan Road to Tuanjie Ring Road) are closed to traffic from June 26th, 20 19 to October 25th. Vehicles and pedestrians can bypass Tuanjie Ring Road, Jiangyuan West Road, Jiangyuan East Road, Haiyuan Road, Xiqing Road, Xihengdi Expressway and Xianyang Road.
7. Due to the maintenance and construction of Jindong Road, from July 9, 2065438 to June 00, 2065438.
/kloc-At the end of 0/0, motor vehicles (except units and individuals in the construction area) are prohibited from passing through Jindong Road (Jintang Second Line to Jintang Highway), and motor vehicles can bypass Jintang Highway, Jintang Second Line, Hangang Highway, Outer Ring Road and other roads.
8. Due to road maintenance and construction, from September 5, 2065438 to October 20, 2065438/kloc-0, vehicles on the Jin-Han double track (Yubin Highway to Qinghe Second Bridge) were prohibited (except vehicles within the boundary). Vehicles can bypass Gangcheng Avenue, Beijing-Tianjin Expressway, Shen Chang Expressway, Kim Expressway, Han Cai Road, Dafeng Road, Siwei Road and Yubin Expressway.
9. Due to road construction, from August 20 to August 20, 20 19 10, 20/0, the still water road in Xiqing District (Jingang Highway to Li Shuang Highway) was closed to motor vehicles (except those within the boundary). Please bypass Jingang Highway, Li Shuang Highway and other roads for passing vehicles, and follow the traffic signals.
10. Due to the construction of Shuanggang Station in the second phase of Metro Line 6, from June 2065438 17 to June 2022 16, Weishan South Road, Jinnan District (234 meters north of Beijing Street to 190 meters south of Beijing Street, including the intersection of Beijing Street). During the construction period, a guide road with a length of 342 meters and a width of 4 meters will be built on the east side of the closed construction area of Weishan South Road, which is only for non-motor vehicles and pedestrians, and motor vehicles are prohibited from passing through this section.
1 1. Due to bridge and road construction, vehicles were prohibited from passing through LG Road in Beichen District from July 3, 20 19 to June 30, 20 19. Vehicles and pedestrians can bypass Jinwei Highway, Outer Ring Road, Beicang Extension Line and Jiafeng Road. The road of Jinwei Highway (Dynasty Winery-Yixing Fuqiao) becomes narrower, so vehicles and pedestrians must follow the traffic signal, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoid it.
12. Due to road maintenance and construction, trucks are prohibited from passing Guangming Avenue (Hongqi Road to Innovation Road) from August 26th to June 30th, 20 19. Freight vehicles can bypass roads such as Innovation Road, Jinqi Highway, Maxi Road and Hongqi Road. When the road surface of the construction section becomes narrow, passing vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles on the construction section is 30 km/h), and pay attention to avoiding.
13. Due to bridge construction, from July 2 to June 30, 2020, motor vehicles were banned from Hangzhou Road (Dongjiang Road to Shaoshan Road) in Binhai New Area. Please bypass Shaoshan Road, Wangda Street, Hebei Road, Jintang Highway, Guangzhou Road and Dongjiang Road for passing motor vehicles. Motor vehicles in Shaoshan Beili Community will enter and exit at Wanda Street on the right.
14. Due to road overhaul construction, vehicles are prohibited from passing through Beidugang Road (Haijing Avenue to Haiphong Road) in Dagang from July 20 19 to February 3 1 9 (except vehicles and pedestrians within the boundary). Passing vehicles and pedestrians can bypass Jinqi Highway, Haijing Avenue, Textile Avenue, Central Avenue, Haiphong Road and other roads.
15, 20 19 July 27 to 20 119, Yiwei Road (Jin-Han double track1)
Hangu Bridge is closed to all vehicles except those within the boundary. Passing vehicles bypass Binhe Road, Xinkai North Road, Wenhua Street, Zhaishang Bridge, Yubin Highway, Sijing Road, Sanwei Road, Wujing Road, Sanjing Road, Erjing Road and Yijing Road.
16, due to the bridge emergency repair construction, vehicles and pedestrians were banned from July 7 to June 6, 20120 19 in wuqing district Wuxiang Highway. Vehicles and pedestrians should bypass Lini Line, 605 County Road, Heda Road and other roads, and follow the traffic signal instructions.
17. Due to road construction, vehicles were banned from wuqing district Shengli Road (Yongyang East Road to Da Qiao Road) and Changde Street (Yongyang East Road to Da Qiao Road) from July 2, 2065438 to July 4, 2065438/kloc-0.
18, due to wuqing district Gaowang Lufeng Hexi Sub-bridge, vehicles and pedestrians were prohibited from passing through Gaowang Lufeng Hexi Sub-bridge from July 29th to June 28th, 2065438, but vehicles and pedestrians can bypass Tanglang Highway, Beijing-Tianjin Highway and Heda Highway.
19, reconstruction project of Yinsha Expressway, August 2065438 to August 2065438.
From June 365438 to1October 3 1 day, vehicles (except units and individuals in the construction area) are prohibited from passing on Gaosha Road (Wanghe Branch Road to Fenggang Road), and vehicles can bypass Wanghe Branch Road, Gaowang Road, Fenggang Road and other roads.
20. Due to road maintenance and construction, from August 27th, 2065438 to February 30th, 2065438, Jing Qing Highway (from Tangguantun Tunnel to Hebei Province) was closed to motor vehicles (except domestic motor vehicles). In the past, motor vehicles could bypass Tiancheng Line, Tuantang Highway, New National Highway 104, Tuanda Highway, Jing Qing Highway (under construction) and other roads.
- Previous article:Is Qingdao Huatong awesome?
- Next article:Dreaming of being with a blind date.
- Related articles
- Kindergarten Year of the Tiger eight-character slogan banner
- Shijiazhuang government work report: the city has expanded to four key areas.
- Will the court have a holiday on Women’s Day?
- The slogan of uniting the masses
- What is the content of the short message sent when the judgment condition of ICBC's "precious metal price reminder" is the price ceiling?
- What should you pay attention to when visiting a Buddhist temple?
- How many people are there in a class of the army?
- Brief introduction and slogan of Weifang tourism
- Hospital creates civilized city slogan
- What about Garden Primary School in Baodi District, Tianjin?