Joke Collection Website - Bulletin headlines - Environmental protection emergency plan

Environmental protection emergency plan

Environmental protection emergency plans (5 general articles)

Accidents will inevitably occur in study, work, and life. In order to reduce the consequences of accidents, it is inevitable to prepare emergency plans in advance. Plan. How should we write an emergency plan? The following are relevant environmental protection emergency plans (5 general articles) that I have collected for everyone. They are for reference only. Let’s take a look.

Environmental Protection Emergency Plan 1

1. The purpose and significance of the activity plan

Environmental issues are one of the issues of common concern to countries around the world. Ecological damage and environmental pollution not only bring losses to economic development and people's lives, but more seriously endanger people's health and destroy the basic conditions for human beings to survive healthily and sustainably.

This activity hopes to raise and strengthen residents’ awareness of environmental protection with the cooperation of every resident, and encourage residents to take practical actions to improve the environment of the streets and even society, and shoulder the responsibilities of all residents. The responsibility to protect our homeland and protect the earth.

2. The scientific nature of the activity plan conception

Lin Jiabin, an expert from the Development Research Center of the State Council, believes that the ecological environment is an important public product, and this understanding should be used as a basis for formulating policies. important basis.

Experts believe that the ecological environment has important characteristics of public products such as non-competitiveness and non-exclusiveness of consumption. Therefore, when the ecological environment requires human investment to be managed and protected, it has the characteristics of a public product. **Product properties.

Therefore, "environmental protection" is a national issue, and government policies and measures are indispensable, but the most important thing is to raise citizens' awareness of "environmental protection". Therefore, this activity plan focuses on Starting from every family, starting from every small corner, we hope that through various activities, every citizen can truly take action and work together to protect the environment, a public property.

3. Planning content and implementation steps of the activity plan

(1) Street greening, everyone participates

1. Strengthen the publicity about "environmental protection and greening" Strengthen the efforts to allow people to pay full attention to it mentally and participate in environmental protection as a master. For example: posting posters and slogans; advertising; organizing street environmental protection publicity activities, etc.;

2. Street leaders can discuss with each household to discuss how to improve the ecological environment of the street, such as implementing "in front of the door"

3. The street leaders and neighborhood committees organize the masses to carry out some "greening" activities, such as organizing children from each family to participate in tree planting, Flower planting activities; raising funds to build "street greening communities" and "green belts"; selecting "excellent greening communities", "advanced environmentally friendly families/individuals", etc.

4. Activities and exchanges can be carried out between streets and streets, and construction in all aspects can be strengthened, thereby gradually expanding the influence of "street greening" to society.

(2) Let’s take action to put an end to “white pollution”

1. Strengthen publicity about “white pollution” so that the public’s understanding of this problem can be strengthened, so that Environmental protection activities go more smoothly;

2. Start with yourself. Not only should you reduce the use of "white pollution" items, but you must also supervise and assimilate the people around you to minimize "white pollution" ;

3. Recognize the "environmental label" and choose green products.

(3) Zero discharge of "hazardous waste"

"Hazardous waste" mainly includes used batteries, films, injection needles, leftover medicines, paints, etc.

1. The street will send special personnel to collect at the door, and the collectors will register the collected "hazardous waste" by category to minimize the loss of "hazardous waste";

2. Set up collection boxes in stores, pharmacies, etc. After collection, these garbage will be sent to designated agencies for centralized processing.

(4) "Saving" Action

1. Take pride in saving water - turn off the faucet at any time and don't let the water flow empty;

2. Stop dripping - The streets regularly inspect and repair water pipes and faucets;

3. Turn off the lights - save one kilowatt hour of electricity and reduce pollution;

4. Support green lighting - everyone uses energy-saving lamps ;

5. Control noise pollution—let us supervise each other.

4. Budget plan of the activity plan

Because this plan focuses on families, the funds required will not be too much. The main funds can be allocated as follows:

1. Purchase some peel boxes, cleaning trucks, etc. (about 800 yuan);

2. Purchase some saplings, flower seedlings, flower pots, etc. (about 500 yuan);

3. Funds required for environmental protection activities and selection (about 1,500 yuan). Environmental Protection Emergency Plan 2

1. Purpose

To promptly and accurately respond to possible hazardous waste disaster accidents, organize implementation and rescue quickly and effectively, prevent the spread and expansion of the accident, and maximize the To reduce casualties, property losses and environmental hazards, this emergency plan is formulated in accordance with the "Work Safety Law of the People's Republic of China" and "Regulations on the Safety Management of Hazardous Chemicals" and combined with the company's actual situation.

2. Scope

It is applicable to the emergency response work of general accidents during the company's hazardous waste disposal process and the preliminary handling work of general or above accidents.

3. Overview of hazardous waste

(1) Laboratory waste liquid

Characteristics and hazards: Containing fluoride, nitrate, sulfate, lead, chromium , iron, etc.

It is irritating, corrosive, toxic, etc., which is directly harmful to the human body. If it flows into the environment, it will also cause serious pollution to the environment.

Safety handling measures: Seal and package in plastic buckets, and entrust relevant qualified parties to dispose of them legally.

IV. Conditions for initiating the emergency plan

Whenever a hazardous waste incident occurs within the company that meets one of the following conditions, this emergency plan will be activated immediately.

1. Explosion and combustion accidents occur in major hazardous sources of hazardous waste;

2. Large amounts of toxic gases, flammable and explosive gases and other dangerous chemicals leak out, and the situation is critical or imminent. Critical to public safety;

3. Others that may cause serious social impact and adverse consequences.

5. Conditions for termination of the plan

The people or objects in danger at the place where the hazardous waste accident occurred are out of danger, the hazardous waste accident has been effectively controlled or eliminated, and the environment meets relevant standards, resulting in secondary , the potential risks of derivative accidents are eliminated.

6. Principles of emergency rescue

1. Personnel first, safety first;

2. Unified command, hierarchical responsibility;

3. While ensuring the safety of personnel, mobilize all available forces to participate in accident rescue work.

7. Organizational Structure and Responsibilities

(1) Emergency Rescue Leading Group

Team Leader: (Mobile Phone)

Deputy Team Leader : (Mobile phone)

Member: (Mobile phone)

(Mobile phone)

(Mobile phone)

Emergency Rescue Office: located in the office

(2) Responsibilities of the emergency rescue leadership group

1. Implement measures related to hazardous waste accident prevention and emergency rescue.

2. Organize and train hazardous waste accident emergency rescue teams and relevant units in key accident areas to carry out joint prevention and rescue work.

3. Promote hazardous waste accident emergency rescue knowledge and environmental education to employees.

4. Inspect, supervise and effectively prepare preventive measures for hazardous waste accidents and emergency rescue preparations.

5. Work with relevant departments to supervise the management and use of accident emergency rescue equipment, equipment and materials.

6. Organize emergency rescue for hazardous waste accidents.

7. Investigate, analyze, and handle accidents, put forward rectification suggestions, and report and notify accidents in a timely manner.

(3) Responsibilities and division of labor of emergency rescue team members

When a hazardous waste accident occurs, the leader of the leadership team shall issue and release emergency rescue orders and signals; (when the team leader is absent, The deputy team leader organizes and directs the implementation), organizes and directs the rescue team to implement rescue operations, sends rescue requests to relevant units when necessary, organizes accident investigations, and summarizes emergency rescue experiences and lessons.

1. Team leader: the overall commander of the entire emergency rescue process.

2. Deputy team leader: Assist the team leader to be responsible for specific command work during the emergency rescue process.

3. Members: Responsible for emergency rescue work in hazardous waste accidents. To prevent the situation from escalating, obey the unified deployment of the team leader and deputy team leader.

8. Environmental accident prevention measures:

Accidents: mainly skin contact, eye contact, accidental ingestion, and leakage;

(1) Emergency measures for accidents:

1. Inhalation: If a large amount is inhaled, immediately move to a place with sufficient fresh air;

2. Ingestion: Under the guidance of medical staff, do not induce vomiting. Give food to unconscious people;

3. Skin contact: If contact occurs, rinse immediately with soap and plenty of water for at least 15 minutes;

4. Eye contact: If contact occurs with eyes , rinse immediately with clean water for at least 15 minutes;

5. Leakage emergency treatment: Leakage treatment generally includes two parts: leakage source control and leakage disposal.

A. When a leak occurs, first extinguish all open flames, isolate all fire sources, and prevent combustion and explosion;

B. On-site handlers must wear protective masks and meet the requirements. Protective equipment; it is strictly prohibited to act alone, a guardian is required, and water cannons are used for cover when necessary;

C. Use sand and soil to enclose the embankment on site and recycle materials to avoid flowing into closed systems such as sewers;

D , Do not wash the ground with water to prevent the expansion of the contaminated area.

E. The spillage or leakage of hazardous waste can be eliminated by controlling the leakage source;

F. On-site leakage should be covered, contained, and diluted in a timely manner to ensure that the leakage is safe and reliable. treatment to prevent secondary accidents.

(2) Preventive measures and emergency plans:

1. Accident prevention measures: Environmental protection personnel conduct inspections on time and deal with problems found in a timely manner.

2. Accident emergency measures: activate emergency plans if necessary.

9. Emergency Plan

(1) Basic tasks of emergency rescue

Timely control the sources of danger caused by hazardous waste accidents to prevent the accident from continuing to expand; rescue Victims; guide employees to protect themselves, organize employees to evacuate, and clean up the site.

(2) Emergency rescue organization and response

1. Preliminary disposal

After a hazardous waste accident occurs, the person in charge of the unit where the accident occurred or the on-site personnel should remain calm , actively take effective measures, make every effort to organize self-rescue, carry out early treatment, deal with what can be dealt with first, and strictly protect the accident scene.

2. Start the plan

The person in charge of the incident unit shall report to the emergency rescue team, and the leadership team will provide unified command. The on-site commanders and rescue personnel will quickly arrive at the designated positions and take corresponding measures. Rescue and control measures.

3. Rescue procedures

3.1 Set up a warning area.

After the commander arrives at the scene, he immediately understands the scene situation and the nature of the accident, determines the warning area and specific implementation plan for accident control, and arranges the tasks of each rescue team.

Seal the site, establish a warning zone based on the leakage and spread of hazardous waste or the scope of flame radiation, and implement traffic control on the main roads leading to the accident site. Warning signs should be set up at the boundary of the warning area and there should be dedicated personnel to guard. Except for fire fighters, emergency response personnel and those who must stick to their posts, other personnel are prohibited from entering the warning area. When the leaked and overflowed hazardous waste is flammable, fires are strictly prohibited in the area.

3.2 Organize emergency evacuation.

After arriving at the scene, each rescue team should obey the instructions of the on-site commander and quickly evacuate personnel unrelated to the emergency response in the warning area and contaminated area to reduce unnecessary casualties.

Strictly implement the relevant regulations for emergency rescue personnel entering and leaving the accident scene. During emergency evacuation, they should pay attention to carrying professional protective equipment as needed, take safety protection measures, and carry out rescue and rescue work according to their respective divisions of labor.

Should move to the direction of the upwind;

Make it clear that dedicated personnel will guide and escort evacuees to safe areas, and set up sentry posts on the evacuation or evacuation routes to indicate the direction, and do not stay in low-lying areas. . Check to see if anyone remains in the contaminated area or fire area.

In order for the evacuation work to proceed smoothly, there should be at least two unobstructed exits at the site with obvious signs.

3.3 After the accident is brought under control, the scene will be cleaned up, and relevant units will organize an investigation into the accident.

4. On-site command

The on-site commander is responsible for directing all rescue personnel involved in the emergency, unified command of the emergency response work of the on-site rescue teams, and timely reporting of accidents and disasters to the command center. development and rescue situations.

5. Requirements for rescue work at the scene

5.1 Maintain good communication between the rescue teams at the scene;

5.2 Rescue vehicles should obey the dispatch of the on-site commander, and drive and park as required.

5.3 When there is a large leakage of flammable and explosive hazardous substances, explosion-proof tools and equipment should be used, emergency rescue personnel should strictly dress in regulations, and turn off mobile phones and other communication tools in dangerous areas.

5.4 When dealing with leaks of toxic substances, positive pressure self-contained gas masks must be used; when dealing with substances harmful to the skin, fully enclosed chemical protective suits and protective gloves must be worn.

5.5 When hazardous chemicals leak, try to block the leak or cut off the spread of the leak, and handle the leakage emergency measures according to the material's MSDS to avoid or reduce environmental pollution.

5.6 First aid measures

5.6.1 Inhalation: If a large amount is inhaled, immediately move to a place with sufficient fresh air.

5.6.2 Swallowing: Induce vomiting under the guidance of medical staff, and do not give food to unconscious people.

5.6.3 Skin contact: In case of contact, wash immediately with soap and plenty of water for at least 15 minutes.

5.6.4 Eye contact: Rinse immediately with water for at least 15 minutes.

5.7 Set up a warning area at the accident site and set up warning signs and precautions.

5.8 Personnel entering the accident scene for rescue should make unified signs and distinctions.

5.9 The accident unit shall unconditionally cooperate with the on-site command and provide necessary assistance.

5.10 Hazardous waste generated by the accident must be obtained from the environmental protection department to apply for a "Hazardous Waste Transfer Permit" and entrust a qualified disposal unit to handle it legally and safely.

5.11 After the waste disposal is completed, conduct environmental monitoring of the surrounding soil and water quality.

6. Emergency Termination

After emergency rescue and after confirming that the termination conditions are met, the emergency command center issues an emergency termination instruction.

10. Emergency Support

The emergency rescue leading group will take the lead, and the relevant departments will be responsible for their respective responsibilities. In accordance with the provisions of the plan, all aspects of guarantee and preparation for hazardous waste accidents will be fully prepared. , Improve the rapid response and handling capabilities of emergency response.

11. Accident aftermath handling

The aftermath handling work is coordinated by the leadership group, with the participation of all relevant departments, and the normal production and living order of the unit where the accident occurred is restored as soon as possible.

12. Supervision and Management

Rewards and accountability, plan drills, publicity and training, etc. all strictly follow the relevant provisions of the company's "Employee Handbook".

Thirteen. Training and exercises

1. Based on reality, organize a simulation exercise at least once a year for possible accidents involving hazardous waste.

2. Train the command organization and environmental rescue emergency team into a team with good thinking, sophisticated technology and hard work style. Once an accident occurs, the leader can command correctly and each rescue team can respond promptly and effectively according to their respective tasks. Queue up dangerous situations, control and eliminate accidents, rescue the injured, and effectively carry out emergency rescue work. Environmental Protection Emergency Plan 3

Municipal Government Emergency Office:

In order to further improve the construction of environmental emergency management organization system, emergency plan system and emergency platform system, strengthen the environmental emergency rescue linkage mechanism and emergency response speed response mechanism, and actively promote the overall planning of emergency management and the planning and construction of the emergency platform system. According to the spirit of the government emergency response document No. 4, our bureau will carry out team building, emergency response capabilities, prevention and early warning, and emergency plans from the 27th to the 14th of the year. Starting from the five aspects of emergency publicity and emergency publicity, we carefully organized the self-examination of the construction of the environmental emergency plan system. The situation is now reported as follows:

1. Strengthened the construction of the emergency team.

The Environmental Municipal Emergency Management Office has been established, standardized work procedures, and improved work systems; based on environmental monitoring, environmental supervision, and pollution control teams, an environmental protection internal emergency rescue team has been established and improved, with clear organization, Coordination and supervision responsibilities have brought emergency management work into a regular, standardized, scientific and institutionalized track.

2. Strengthened the construction of emergency response capability system.

Actively strive for special funds and build an environmental pollution incident emergency command system consisting of environmental pollution incident response, information transmission and feedback, emergency decision-making and command, emergency material support information, and emergency technical support; attach great importance to environmental emergency equipment capabilities In addition to equipping emergency vehicles, protective equipment, monitoring instruments and other necessary equipment, it also strengthened the reserve of environmental safety emergency technology and emergency material information; established an emergency expert database for environmental emergencies and implemented dynamic management.

3. Pay close attention to the construction of the prevention and early warning system for environmental emergencies.

Implement source control, and if new, expanded or reconstructed construction projects fail to carry out environmental risk assessment or early warning monitoring measures, emergency response measures and emergency plans in accordance with regulations and do not meet the requirements after review, the construction will be resolutely refused to be approved Project; established a dynamic management system and risk source assessment system for environmental risk sources. This year, we organized efforts to conduct a comprehensive investigation of potential environmental risks in the city, and 1 potential environmental safety hazard was identified. For units with risk sources, we have adopted a deadline to improve environmental early warning monitoring measures, emergency response measures and emergency plans. For those that cannot be completed within the deadline or fail to pass the acceptance inspection, we will implement production restrictions or suspensions; improve and implement the environmental early warning monitoring system, in Xiangshan, Environmental risk early warning monitoring points have been set up at key nodes such as Shixihao and Laochi, and regular monitoring at the city and county (district) levels has been implemented.

4. The contingency plan system for environmental emergencies has been improved.

A pollution accident emergency response leading group was established with the main leaders of the bureau as the team leader, and on the basis of summarizing and sorting out the original emergency management system, the "Municipal Environmental Emergency Response Plan" was revised and improved , standardize emergency response procedures, responsibilities, contact information, etc., to ensure that emergency incidents are handled quickly and efficiently. At the same time, relying on the 12369 environmental protection reporting and complaint hotline, an emergency response platform for environmental emergencies has been established. The emergency response system will be activated immediately after receiving the alarm, and corresponding measures will be quickly taken to deal with it.

5. Increase the publicity of emergency response knowledge on environmental pollution incident prevention.

Carry out the publicity of emergency knowledge through various forms such as radio stations, newspapers, websites, and on-site lectures, and improve the public's environmental safety awareness and self-rescue and mutual rescue capabilities; increase the number of units where major hazard sources are located The technical guidance and training have improved the level of enterprises in carrying out rescue and self-protection.

6. Actively carried out emergency plan drills.

Actively carry out environmental emergency response training, combined with the emergency rescue plan for environmental emergencies, an emergency monitoring exercise for sudden environmental pollution accidents was organized in mid-month. Through the exercise, more comrades became familiar with Emergency response procedures and mastery of emergency response measures have greatly improved our bureau's rapid response capability and scientific handling level in responding to environmental emergencies.

7. Comprehensive preparations for emergency response.

Strengthen emergency duty and strictly enforce the leadership system to ensure smooth flow of information 24 hours a day.

Be able to respond to various environmental emergencies as soon as possible, and carry out emergency response work in strict accordance with the instructions of the municipal emergency headquarters to ensure the safety of the municipal environment. Environmental Protection Emergency Plan 4

In order to successfully complete the low-carbon life and environmental protection campus activities, ensure the personal safety of students, ensure the smooth progress of all work of this activity, and effectively reduce and control the hazards of safety accidents, Develop a special safety plan.

One: Establish a team specifically responsible for safety incidents.

2: Main Responsibilities

1. The person in charge is responsible for convening pre-departure safety meetings and arranging inspections of facility safety and other matters.

2. Each member is specifically responsible for emergency incident handling, monitoring and reporting, etc. And ensure smooth flow of instructions from the person in charge.

Three: Emergency Measures

1. Staff should abide by traffic rules when going to the event location, and the person in charge should provide safety education.

2. Arrange caretakers on the stairs to prevent students from climbing up. If they are found, staff will stop them immediately, evacuate them in time, and send the injured students to the hospital.

3. Prevent students from fighting during activities. If you are found making a loud noise, the staff will stop it immediately and ask you to leave the venue to mediate.

4. When making handicrafts, staff should be careful to prevent students from injuring themselves and others.

5. Before the activity, the staff will check the lines at the activity location and coordinate with the teacher in a timely manner if any are discovered.

6. Pay attention to your tone when interacting with classmates to prevent conflicts and chaos in the venue. Staff control the venue and must be friendly.

7. Assign various departments to cooperate closely.

8. Staff must be familiar with the location of the exit of the venue and provide correct guidance for evacuating students. Environmental protection emergency plan 5

In order to ensure the mixing quality of concrete and the orderly progress of construction and production, in the event of unexpected situations such as heavy rain, unexpected water outage, power outage or mechanical equipment failure, in order to ensure that the concrete is normal Supply and mixing stations are operating normally, and this emergency plan for the mixing station is specially formulated. When the following situations occur, emergency plans should be activated immediately.

Personnel composition

Establish an emergency leadership group

Team leader: Station manager

Deputy team leader: Chief dispatcher

< p>Team members: All managers of the mixing station

The office of the leadership team is located in the dispatching room, and the personnel on duty in the dispatching room on that day are responsible for directing the emergency plan work on that day.

1. When there is a sudden heavy rain during normal production, activate the rainstorm emergency plan

① The dispatcher on duty shall promptly communicate and negotiate with the construction site on the heavy rain situation to handle the on-site processing work, and inspect the materials Whether the color steel tiles of the warehouse and hopper are intact, and whether there is leakage or rain everywhere;

② During the quality inspection on duty, pay attention to the slump, workability, etc. of each plate of concrete coming out of the machine. The concrete tank truck waiting to receive ash should arrive at the discharge port and drain the water again before receiving ash, and check the hopper of the transport vehicle and install the rainproof cloth;

③The tester should re-test the coarse and fine aggregate in a timely manner Moisture content, and adjust the mix ratio in time according to changes in moisture content;

④ The mixing driver pays attention to the monitor to observe whether there is leakage of rainwater from the ground silo, and changes in the sand and gravel materials on the inclined belt during the feeding process , the changes in the slump of the out-machine concrete;

⑤The safety officer promptly checks whether the lightning protection equipment of the mixing station is intact;

⑥The station manager inspects and inspects the entire mixing station in a timely manner Everyone is responsible for the operation of the machinery and stick to their jobs;

⑦The general dispatcher coordinates with the person in charge of the construction site in a timely manner on the situation inside and outside the station to ensure that all work is carried out in an orderly manner.

2. In case of continuous rainy days, activate the emergency plan for rainy days

①The station manager inspects the entire mixing station, and personnel in each position are responsible for their respective responsibilities to ensure that all work is carried out in an orderly manner. The mixing station is operating normally;

② The material collector in the weighbridge room ensures that the feeding and transporting vehicles are cleaned before entering the site to prevent soil and other pollutants from being brought in;

③The laboratory technician randomly checks the moisture content of coarse and fine aggregates at any time, and adjusts the mix ratio in time to ensure the mixing quality of concrete.

④ During the quality inspection on duty, pay attention to the slump and workability of each concrete plate coming out of the machine. If necessary, check the concrete mixed in the tank each time;

⑤ The mixing driver should pay attention to inspect whether there is water leakage in the ground silo, changes in the sand and gravel on the inclined belt during the loading process, and changes in the slump of the out-machine concrete;

3. Sudden stoppage of normal production When there is water, activate the water outage emergency plan

(1) The two production lines are equipped with an underground water storage tank that can store 70t of water, and a backup water storage tank that can store 200t of water. Before production, the water storage tanks and backup water storage tanks of the mixing station are controlled by the automatic control system, and the water tanks are in a full state; at the same time, when the two water tanks are pumped or the rated water storage level changes, the control system starts to work. Store water intermittently until the water tank is full.

(2) The water consumption per cubic meter of concrete is about 140kg. The two production lines operate at the same time. The normal production volume is about 126m3/h, and the water consumption per hour is about 17.6t. If a water failure occurs suddenly during construction, the water storage in the mixing station pool and the backup water tank can approximately produce 1900m3 of concrete, which can ensure a day of normal production and the time required for emergency repairs to eliminate the water failure.

4. In case of sudden power outage during normal production, activate the backup power emergency plan

(1) If there is a sudden power outage during normal production, the relevant person in charge must immediately contact the production dispatcher or on-site duty Contact the electrician. The electrician on duty should rush to the substation and distribution room as soon as possible to find out the cause of the power outage (at the same time, the electromechanical shift should arrange for the generator driver to be in place to make preparations for power generation), and distinguish whether it is a power outage from the external power grid or a failure of the distribution facilities. If so, In the event of an external power outage, the production scheduler will arrange to activate the backup power supply within 15 minutes.

(2) The backup power supply in the station is two diesel generators with an installed power of 200KW, which can provide power to the concrete mixing station during a power outage. In order to ensure production, temporary power supply is generally not provided to the office and living areas.

(3) Before activating the backup power supply, the electrician must first cut off the main isolation switch in the main distribution cabinet. The generator driver must check again whether all parts of the generator set are normal. After confirming that they are correct, press the generator operation The procedure starts normally. At this time, after the generator driver and electrician check that the parameters of each part are normal, and when the conditions for power transmission are met, the electrician performs a switching operation to send power out.

(4) In order to ensure the normal and reliable operation of the backup power supply at any time, the equipment department has formulated a relevant backup power management system, implemented a strict fixed machine and personnel management system for the generator set, and required the custodian driver to conduct inspections once a week During running-in maintenance, keep abreast of the working condition of the generator at any time. If there are any abnormalities, eliminate them promptly and never run them sick. In addition, before filling the bridge every day, the maintenance driver must start the generator one hour in advance and run it for 15 minutes to confirm whether the generator is normal.

(5) The electromechanical team will monitor the maintenance and repair of generator sets and concrete mixing stations every month, and make plans for purchasing various accessories every quarter to ensure the storage of wearing parts.

5. In the event of sudden failure of key production equipment, activate the emergency plan for backup equipment

(1) The key equipment in the concrete production process in the mixing station mainly refers to the forced concrete mixer. Other mechanical equipment has large spare reserves and is easily repairable.

(2) There are two sets of production lines. One set is started when concrete is poured, and one set can be used as a backup. When an unexpected mechanical failure occurs during the production process, the backup equipment is started.

(3) Do a good job in the maintenance of key mechanical equipment on a daily basis. The equipment department should make monthly plans for the purchase of various accessories based on the maintenance and repair status of the equipment to ensure the storage of wearing parts. , when equipment shuts down due to failure, it must be repaired in time.

6. Activation of emergency plan for sudden fire

After a fire accident, under the unified leadership of the emergency leading group, measures must be taken according to the scale of the fire, the degree of harm and the different stages of the fire. Different disposal methods and strategies. Preliminary treatment: In the early stage of a fire, when the scale is small, it is necessary to quickly organize forces and rush to the scene to carry out fire fighting. At the same time, the fire size, situation, hazards, on-site fire fighting situation, personnel and materials and other basic conditions should be immediately reported to the leadership group. According to the fire situation, promptly dial the fire alarm 119 number and contact the power department and hospital to do a good job in transmitting intelligence information.

In the initial stage, it is necessary to use the strength of on-site personnel to carry out fire fighting in a timely manner and strive to eliminate the fire accident in the initial stage.

7. Emergency plan for mixing station dust and additive leakage

1. During the production of the mixing station, if an abnormal increase in dust is found compared to normal production. Immediately check whether the dust removal equipment is damaged or the packaging part is damaged and leaked, and deal with it in time. If the amount of dust is large, spray dust reduction measures can be used.

2. After the admixture causes leakage due to aging, the admixture should be replaced in time and the leakage site should be plugged. The leaked additives are diluted with water and directed to the sewage sedimentation tank. Prevent additives from causing secondary pollution to the environment. ;