Piling construction worker internship summary
Internship Summary of Piling Construction Engineers
Time is fleeting and the meaningful internship life is over. We must have absorbed many new ideas. Let us summarize it and write a summary. Let’s summarize the internship. But I believe many people are clueless. The following is a summary of the piling construction workers’ internship that I have collected. You are welcome to share it.
Under the arrangement of the school, we have to go to the construction site for internship work and become a civil construction worker. During the internship process, we learned a lot of things, which will be It has been growing with us and become our stepping stone. The internship period was from December 20xx to June 20xx. Hubei Tianxia Hongtu Real Estate Co., Ltd. reported that it arranged an internship at Century City, Jianghan Plaza, Tianmen, Hubei, and mainly went to the site with the construction workers to participate in construction practice. Since joining this project in December, I have been working as an on-site construction worker. Let’s start with the on-site responsible engineer. This is a job that attaches great importance to on-site management and communication. Since I just came to the project and was not familiar with the entire project work, and the communication with the construction team was not in place, the work at the beginning was very passive. The ambitions I had when I first arrived were suddenly shattered by reality. At this critical moment, it was the project leader and colleagues who communicated with me in a timely manner and helped me understand my situation and the difficulties I faced. With everyone's help, my work as a constructor has slowly and smoothly begun. The construction area of ??the construction site is 68685, 1m2. The construction site is located on the bank of the Han River. The geology is silt, silt, and silty soil. The bearing capacity of the foundation is low. The main pile foundation framework is The structure adopts a shear wall load-bearing structure; the buildings in the community include E1-4 shopping malls, kindergartens and living buildings, of which D1-D2-D3 living buildings are 11-story buildings, and the rest B1-1~4, B2-1~ 4. C1-1~4 and C2-1~4 are 6-story buildings, and also include some public facilities such as garbage recycling stations, underground parking lots, underground civil air defense facilities, basketball courts, leisure and entertainment areas, etc.
When I went to the construction site, the main body had already completed the decoration stage and approved the minor municipal drainage project drawings, including B1-1~4, B2-1~4, C1-1~4, C2-1 ~4 has already entered into interior decoration and exterior wall tiling, D1-D2 have indoor brickwork and exterior wall plastering, and D3’s main floor has reached the 9th floor.
During my work internship, my senior taught me what structural form is. Modern buildings mainly use frame structures and frame shear wall structures. My predecessors told me about frame shear wall structures. This structure arranges a certain number of shear walls in the frame structure to form a flexible and free space. . This method is really good. It can meet the requirements of different building functions and also has considerable stiffness. The stress characteristics of the frame-shear structure are composed of two different lateral force-resistant structures: frame and shear wall structure. New form of force. This is why framed shear wall structures are so popular and are now used by many builders.
As a qualified constructor, under the leadership of the project manager and construction leader, he is responsible for the construction organization arrangements and construction management work within the operation area and section. (In other words, keep an eye on the site!) Coordinate construction, manage construction quality, on-site data, track construction progress, report material consumption, report required materials, coordinate supervision, make design changes, confirm on-site non-contract work quantities, etc.
First of all, you must read and understand the drawings, have a plan in mind for the implementation of the project, and then rely on the drawings to construct according to the drawings. Secondly, you must master the construction technology at each stage of the construction, control the construction quality and progress, and coordinate with good people. On-site management of materials, machinery and equipment. During on-site construction work, I am mainly responsible for construction technology, construction quality, construction progress, construction safety, cooperating with material testing, and cooperating with professional supervisors for on-site management. Here is a brief introduction to the work:
1. In the on-site construction process, I know that the general construction procedures of workers are:
1) First underground, then above ground, first the main body, Organize construction based on the principles of enclosing later, rough decoration first and then fine decoration, conduct structural acceptance in a timely manner, form a working surface as early as possible, and organize cross-body operations, which will help shorten the construction period. The configuration of column and wall formwork should be considered for use 5-6 times. In particular, the construction of roof concrete is required to leave no construction joints.
2) During the construction of the project, it is necessary to arrange the overlapping of each process and make all the necessary resources in place according to the needs of the process.
3) During the earth excavation stage, promptly organize enough labor to repair the slope to ensure that the slope of the foundation pit does not collapse. If the acceptance of the foundation pit trench is not restricted by relevant conditions, the construction of foundation earthwork and concrete cushion layer shall adopt cross-cutting operations. Each area shall clear the soil, inspect the trench, and pour the concrete cushion layer to ensure that the base soil of the bearing layer is not soaked or disturbed by rainwater. Or human disturbance.
4. This project is a high-rise building, and intermediate structural acceptance of the structural project can be considered. During structural construction, the process interleaving and the embedding of embedded parts should be reasonably arranged.
5. When water, electricity, equipment, etc. are reserved and pre-buried for installation, it is necessary to closely cooperate with the civil construction progress, actively organize interspersed operations, and do a good job in pre-burying and reserving water and electricity pipelines. During the decoration stage Do a good job in installation and debugging.
2. Construction quality management mainly focuses on some easy and often made mistakes, such as: uneven settlement of foundations. Since the quality of foundation soils varies greatly depending on the type, many of them are Weak soil and bad soil. Therefore, during project construction, we often encounter poor foundations, cracks between brick masonry and structural columns, roof leaks, leaks in kitchens and bathrooms, cracks in prefabricated reinforced concrete slabs, etc., which must be corrected and changed in a timely manner to ensure that the project The quality meets the standard. Safety management issues in construction project management have increasingly become an element that cannot be ignored in the construction industry, and construction safety management is an important part of construction enterprise management and is a comprehensive science. Quality and safety are often inseparable. Safety is the focus or main content of quality. It can even be said that quality is safety and safety is quality. During the construction site management process, we hang safety slogans and warning signs in eye-catching locations of the project, regularly promote safety knowledge to workers, carry out engineering safety education activities, and standardize the use of electricity for on-site construction: we attach great importance to the use of TN-S systems to ensure dedicated Protect the neutral line and the use of special backup power equipment, pay attention to "three-level power distribution and three-level protection" and implement "one machine, one gate, one leakage and one box", pay attention to the standardized setting of the main distribution room, and pay attention to the parameters of the leakage protection device match. Keep your equipment in good condition to increase its service life and efficiency. Strengthen and standardize civilized construction on site, pay attention to the promotion of civilized construction awareness, pay attention to site appearance, hardening, passages, material stacking, completion site cleaning, drainage system, and closed management, and attach great importance to and standardize living facilities. We attach great importance to the analysis of safety hazards, establish safety production responsibility systems at all levels, and actively adopt new processes and equipment to continuously improve project quality, so that workers have a better understanding of management. Develop reasonable construction safety management systems and control measures to pursue optimal project quality while ensuring construction safety.
3. In collaboration with material inspection, we mainly need to record the on-site inspection of materials and components, such as: among steel structure materials, "steel components, welding materials, connection fasteners and accessories, fire protection and anti-corrosion" Paint, welding (bolt) balls, sealing plates, cone heads, sleeves and metal plates, various masonry blocks, formwork, etc. must be prepared in the specifications and varieties of various materials and stacked at the construction site in a reasonable arrangement. At the same time, we cooperate with the material technicians to ensure that the inventory of various materials at the construction site is as high as possible, so that later construction will not be stopped due to material shortages, causing project losses and personnel delays. Keep abreast of the degree of wear and tear of various machinery on the construction site and prepare for repairs, so that the project can be successfully completed within the construction period.
4. A good construction manager is both a diligent and kind person. Cooperate with the supervision and management of project construction, understand the construction technology and construction methods during the construction, manage and supervise each construction team to complete the completed tasks in a timely manner, and clean up the construction fertilizer and domestic waste within the jurisdiction of each construction team during the on-site construction. Make the construction site more civilized, harmonious and people-oriented. We welcome inspections and guidance from relevant units so that the construction site can truly become a part of building a harmonious city. Wall masonry work:
After observing the construction site of Buildings D1-D2, the main frame has been completed and the indoor brick wall masonry has been completed on the 1st to 3rd floors, and the 4th floor is under construction. Steel mining derrick vertical lift transports materials. The wall is not load-bearing and is 24 mm thick. The brick wall material is composed of lime sand bricks and cement mortar.
Among them, the lime-sand bricks are of MU5 grade with a specification of 240x115x53. The quality requirements for the lime-sand bricks mainly meet the requirements of strength and durability.
The mix ratio of cement mortar is M7 and grade 5. The quality requirements of the mortar mainly meet the workability and no segregation phenomenon. ;
- Related articles
- Billboard slogans to protect small animals
- Tea factory slogan
- Excuse me, what places are there to go to go on road trip, Zunyi, Guizhou during the Eleventh Golden Week?
- We are in the same boat and we are united to fight against the epidemic. Essay collection
- What did the Centennial Manuscript say?
- Is it illegal to retire the August 1st military emblem sticker?
- When will the bank's year-end accounts close?
- Four-character idioms in divination
- Hotel fire drill plan
- Articles touching the epidemic situation _ 5 articles touching the epidemic situation in 2022