Joke Collection Website - Bulletin headlines - River length system work plan
River length system work plan
Time goes by, never stops, and our work has entered a new stage. In order to grow better in our work, let's make a plan for our future work. So do you really know how to write a good plan? The following is the work plan of the river length system that I have compiled for you, for reference only, hoping to help you. Work plan of river length system 1
1. Guiding ideology
Guided by the spirit of the 19th National Congress, firmly establish the concept of "Lucid waters and lush mountains are invaluable assets", aim at building a "beautiful and charming West River", adhere to scientific water control, water control according to law, water control by the whole people, thoroughly implement the river length system, and conscientiously implement the river according to the principles of "unified deployment, division of responsibilities, territorial implementation and long-term management".
II. Work Objectives
According to the relevant requirements of "River Length System", the water environment management of the town (Xihe River) section will be solidly promoted. By the end of xxxx, there will be no water hyacinth, no floating objects, no dry branches on both sides of the river, white garbage and no direct domestic water in the drainage ditch, the river environment will be significantly improved, the total discharge of major water pollutants will be significantly reduced, the environmental quality of surface water will remain excellent, and the river water will feel good.
III. Tasks
In xxxx, our town's river length system actively promoted the policy of "treating both the waterfront and the shore, building and managing simultaneously, combining supervision and the whole people's participation", and comprehensively strengthened the environmental protection and pollution control of the water system from the three aspects of "engineering water control, management water control and social water control", and took measures against illegal behaviors such as coastal operation and production, direct sewage discharge from livestock and poultry breeding, and illegal buildings (structures). The focus of monitoring is to strictly enforce the environmental access system and strengthen the supervision and management of water-related environmental pollution law enforcement. The key point of management is to strengthen the management and protection of water environmental sanitation, control the generation of new pollution from the source, and improve the long-term mechanism of "Five Rivers". The key point of participation is to increase the publicity of water environment improvement through publicity and various activities, create an atmosphere of public opinion, arouse public concern, form a strong trend of social supervision and participation of the whole people, and guide units, groups and individuals to fulfill their social responsibilities.
iv. working measures
in xxxx, in order to achieve the goal of water control, our town carried out the work of river length system in accordance with the idea of "unified planning, highlighting key points and implementing step by step", carried out pollution control of livestock and poultry breeding, and treated domestic sewage in coastal rural areas, which further improved the water quality of Xihe River (section).
1. Livestock and poultry breeding pollution remediation project. Solidly investigate and rectify the pollution of livestock and poultry breeding on both sides of the river, promote the transformation and upgrading of animal husbandry, and complete the pollution control work of aquaculture along the Xihe River (section).
2. Rural domestic sewage treatment project. Choose the suitable domestic sewage treatment mode according to local conditions to improve the treatment efficiency and coverage of rural domestic sewage.
3. Strengthen the management of street domestic sewage facilities. Accelerate the construction of sewage treatment plants, ensure that sewage treatment plants are put into operation early, do a good job in the supervision of street sewage treatment facilities, and give full play to the beneficial operation of sewage treatment plants.
4. strengthen the daily management of the pit water system, and find out the damage and violation in time. We will do a good job in the special rectification action of "removing illegal construction and illegal occupation of rivers", strengthen the enforcement of river management, resolutely ban illegal sand mining, strengthen the daily management and maintenance of rivers and coasts according to their functions, improve the long-term management mechanism, improve the daily inspection mechanism, investigate and deal with illegal occupation of rivers, and timely discover and deal with facilities damage and illegal construction.
5. Strengthen coastal environmental sanitation management and create a clean water system environment. Do a good job in the creation of "clean villages", improve the supervision and assessment plan, inspect the river on time, and remove the water hyacinth, floating objects on the water surface, white garbage and dry branches on time.
6. Strengthen media publicity and give full play to the guidance of public opinion. Towns and villages give full play to the guiding role of news and public opinion, and extensively and persistently carry out multi-level and multi-form publicity and education activities on ecological civilization construction through news media such as radio, blackboard newspaper, slogans and short messages, strengthen the summary and promotion of advanced models, and form a good atmosphere for * * * to enjoy ecological civilization construction.
7. Carry out various group activities and guide all sectors of society to participate. Villages (residential) and township-level departments in towns should carry out various forms of main activities around the target content of remediation work, guide the whole town people to fulfill their social responsibilities, consciously control pollution, promote clean production and life, give full play to the role of the masses, further improve the people's sense of responsibility and participation in water environmental governance, and form a good atmosphere for the whole society to care, support, participate and supervise water environmental governance. The work plan of the river length system 2
is deployed according to the arrangement of the municipal party committee and the municipal government, and the zhengxiang district Party Committee and the government attach great importance to it. It is clear that the secretary of the district party committee is the first river length, the district head is the chief river length, and the executive deputy district head and the deputy district head are the deputy river length. Seriously implementing the spirit of the superior river length system and giving full play to the main role of the local party committee and government is to implement the concept of green development and fully implement the river length system. The relevant situation is summarized as follows:
1. The working system of river length system is constructed.
At the end of March, Governor Gu Ping presided over a government standing committee to study and deploy the river length system. At the beginning of April, the whole region issued the Work Plan for Carrying out the River Length System in an All-round Way (Hengzheng Office [2xx] No.19), which detailed six tasks: strengthening the management of water resources, strengthening the management and protection of river and lake shoreline, strengthening the prevention and control of water pollution, strengthening the management of water environment, strengthening the restoration of water ecology and strengthening law enforcement and supervision. The responsibilities of each member unit of the river length system working Committee were clarified, and the river length system of district, town (street) and village was established. At the same time, the office of the zhengxiang district River System Working Committee of Hengyang City was set up in Room 817 of the government office building to ensure that the staff, funds, office space and working facilities of the River System Office were in place (2xx2 of Hengzheng River Committee and No.2xx25 of Hengzheng Weaving); In April, the Municipal Water Conservancy Bureau published a unified list of district-level river chiefs in Hengyang Daily. In August, the list of river chiefs at the town (street) and village levels was publicized at the district party and government stations. In October, six systems were established, including the zhengxiang district River Chief Meeting System and the zhengxiang district River Chief Work Assessment Method, which actively promoted the river chief work in our district.
second, the present situation of rivers and lakes was found out.
according to the working requirements of "one river, one file, one river, one policy" in provinces and cities, the District River Chief Office has comprehensively carried out the investigation and filing of the current situation of rivers and lakes, and comprehensively investigated the problems affecting the health of rivers by basin, industry and region. The implementation scope of the river length system covers the rivers in the whole region, and it is clearly stated in No.1 of the Hengzheng River Commission Office that "all rivers and lakes (including reservoirs) in zhengxiang district are subject to the river length system. After investigation, it is determined that there are 3 district-level rivers, namely, steamed water, Shanxu River and Shijing River, and 6 township-level rivers (2 Jiwoshan and Aopi River in Daiyingling Town, 3 Xiejiatai, Daibei River and Panlongqiao River in Yumushan Town, and 1 Xingfu River in Lianhe Street). It is clear that 3 district-level rivers are headed by district-level leaders and 6 township-level rivers are headed by township (street) principals. According to the principle of "grading responsibility and pilot first", in July, Shanxu River was identified as the pilot river of "one river and one policy" in our district. In September, the sewage outlets and drains of the river in Zhengxiang section of Shanxu River, farms, sand yards, garbage spots along the river within 5m, surrounding black and odorous water bodies, sluices along the river, bridges, pump houses, drainage stations and other buildings, first-class tributaries, river cleaning and cleaning were completed.
third, river management has been strengthened.
first, strengthen work publicity. On March 15th, our district launched the theme activity of "Guangan fully implements the river length system, and * * * cares for Yanxiangmei". The district head personally attended the activity, led a team to inspect the Zhengshui River, and announced the full launch of the river length system in the whole district. So far, 48 public signs have been set up. The second is to strengthen river management. Intensify river regulation, resolutely implement the prohibition of sand mining in urban rivers, supervise and coordinate towns to conscientiously implement river sand mining regulation and ban illegal sand yards. Vigorously promote river cleaning work and fully implement the strictest water resources management work. The third is to strengthen river regulation. Since March, the river cleaning and salvage team in our district has dispatched 14 times to salvage the garbage on the surface of the steamed water area in the whole region, cleared up nearly 13 tons of garbage on the river bank and river surface within the scope of river management, and handled 3 cases of littering, dumping and littering within the river area according to law.
Fourth, the next stage of work is planned to be
2xx years. In order to fully promote the river length system and ensure the successful completion of the river length system, our district will focus on the following aspects.
first, the responsibility of compaction. In order to promote the implementation of the river length system, river chiefs at all levels carry out comprehensive river patrol, inspection and supervision, find problems in time, rectify them in time, effectively protect the water quality of rivers and lakes and maintain a good water ecological environment.
the second is to strengthen job security. Clarify the investment mechanism, method and amount of funds for the full implementation of the river length system at the district, township and village levels, and increase support for the river length system in townships and administrative villages by means of awards instead of subsidies.
the third is to unite the work force. District, town (street) river long committee member units coordinated linkage working mechanism, according to the river long system "six" supporting system, condensed all levels and departments to fully promote the work of the river long system. Compacting the work to the river length, to the member units and to the villages and towns. At the same time, it is necessary to increase the publicity of the river length system, mobilize and give play to the enthusiasm of the public and the people along the river and lake, and unite the joint efforts of the whole society to protect rivers and lakes and protect ecology. Work plan of river length system 3
Since the county started the work of river length system, under the strong leadership of the county party committee and the county government, and under the guidance of the county-level river length system office, our town has responded positively and carried out all the work of river length system in time, making efforts to ensure our town to achieve the management and protection objectives of "clear water, green shore, smooth river and beautiful scenery" and achieved certain results. The work of 2xx river length system in our town is summarized as follows:
1. Leaders attach great importance to it and the work is deployed in place
Since the implementation of the river length system, the leading bodies of our town party committee and government have attached great importance to it. First, the town's river length system work deployment meeting and promotion meeting will be held in time, and the relevant work documents and work requirements of the river length system of higher authorities will be conveyed in time, and all work will be actively deployed in combination with the actual situation of our town. Second, a series of schemes and work systems were issued in combination with the actual situation, such as the Notice on Printing and Distributing the Work Plan for Comprehensively Implementing the River Length System in XX Town (Chang Fa [2xx] No.57), the Notice on Establishing the Leading Group for the River Length System in XX Town (Chang Fa [2xx] No.58) and the Notice on Printing and Distributing the Relevant Work Systems of the River Length System in XX Town (Chang Fa [2xx] No.62) The third is to set up a river-length office to ensure that the river-length work has office space and staff.
Second, the work has achieved phased results
First, strengthen the publicity of the river length system. Posters were posted in conspicuous places in XX Street and the gathering places of people in various villages to let the masses know the significance and requirements of the river length system, and strive to make the river length work a household name and deeply rooted in the hearts of the people. Second, our town promptly organized staff to conduct a comprehensive survey of all the rivers in the town and master first-hand information. After verification, there are 2 rivers with an area of over 5 square kilometers and 75 rivers with an area of less than 5 square kilometers in our town. At present, according to the actual situation, town-level river chiefs and village-level river chiefs have been set up for each river, ensuring that every river is patrolled and managed, and problems found are solved in time. The third is to formulate a river patrol system, requiring township river chiefs to patrol the river at least four times a month and at least once every ten days, and make a record of river patrol. The fourth is to set up a publicity card for the river chief. Placing the publicity board of the river chief in a conspicuous place by the river, indicating the county-level river chief, the town-level river chief and the village-level river chief, stating the responsibilities of the river chief, publicizing the contact telephone number of the river chief, and consciously accepting the supervision of people from all walks of life. Fifth, our town combined with the work of beautiful towns and villages to jointly carry out river cleaning, and strive to make the river clean and smooth, and the banks are shaded by trees.
III. Difficulties and Problems
Although the river length system in our town has achieved certain results, there are still some difficulties and problems. For example, there are no special staff in the river length system office. At present, the staff of the water conservancy station take care of the daily work of the river length system and the poverty alleviation work in the village, so it is impossible to do everything, and the problem of heavy workload and few staff is outstanding. Second, there is no special work fund. Although the work of river length system has been carried out enthusiastically, the related work funds have been lacking, which has hindered the development of river length system to some extent. Third, the people's concept of environmental protection is weak. There are still some phenomena in people's life, such as littering, domestic sewage discharged into rivers, pesticide and fertilizer released, and crop management inadvertently flowing into rivers.
IV. Work Plan
In the 2xx river length system, we will mainly do the following: First, increase the publicity of the river length system, let the people fully participate in the river length system, and * * * safeguard their living environment. The second is to strengthen training, especially for township-level river chiefs, village-level river chiefs and village cadres, to ensure the implementation of various working systems of river chiefs in place and avoid becoming a mere formality. The third is to increase the intensity of river patrol to ensure that every river is patrolled and managed normally. Fourth, do a good job in river dredging and garbage cleaning during the flood season. Strive to achieve a livable environment with cleaner water, smoother rivers, greener shores and more beautiful scenery. Work plan of river length system 4
1. Perfecting system and mechanism
1. Compacting the responsibility of river length and lake length. Further tighten the responsibilities of river and lake chiefs at all levels, river and lake section chiefs and relevant departments, and ensure that the chief river and lake chief is the first responsible person for the management and protection of inland rivers and lakes in the jurisdiction, the highest river and lake chief is the first responsible person for the management and protection of rivers and lakes, and other river and lake section chiefs are the direct responsible persons for the management and protection of corresponding rivers and lakes, and the relevant departments are the responsible units for the management and protection of rivers and lakes, forming a working pattern in which the party and government take the lead, the departments cooperate, and the implementation is carried out at one level and at another. Further standardize the inspection of rivers and lakes, ensure the inspection frequency and quality, focus on finding problems, organize and solve problems, establish and improve the log of river patrol and lake patrol, and improve the "one river (lake) and one file".
2. Build a long-term mechanism. Improve the joint meeting system of river and lake chiefs, improve the management and protection system of rivers and lakes, and strengthen the comprehensive management of river basins; Local party committees at all levels should strengthen unified leadership over the long-term system of rivers and lakes, and improve the working mechanism of the long-term system of rivers and lakes with the integration of military and land and the linkage of departments. Refine the division of responsibilities of departments, clarify the work objectives and tasks, and promote the formation of joint efforts of all departments under the unified leadership of river and lake chiefs. The heads of rivers and lakes at all levels should do a good job in organization, coordination, sub-office and supervision, and implement the matters determined by the heads of rivers and lakes.
3. Implement the staff. In combination with institutional reform, we will implement the requirements of the Party committees of the Central Committee and the autonomous region, solve outstanding problems such as insufficient staff, weak technical strength and unfulfilled funds as soon as possible, and effectively guarantee the working strength of the long-term system of rivers and lakes.
4. Give full play to the river.
- Related articles
- What is the slogan of "One Helmet"?
- Establish family rules, preach family precepts, and build family style famous aphorisms.
- Is Crest's advertisement Youku video true?
- Escalator English
- Internal organs of Nanjing Local Taxation Bureau
- Classic short sentences that inherit red genes
- High school welcome slogan
- Slogan of volunteer activity center
- What are the clubs worth joining in Jiangxi College of Traditional Chinese Medicine?
- How to center the title in a WORD document?