Joke Collection Website - Bulletin headlines - 5 construction self-inspection reports

5 construction self-inspection reports

#report# Introduction A self-examination report is a self-examination report style in which a unit or department examines the problems existing in the execution of a certain work within a certain period of time. The following is a construction self-inspection report compiled by kao.com, welcome to read!

1. Construction self-inspection and self-inspection report

1. Establishment and implementation of safety production responsibility system and rules and regulations

According to the "People's Republic of China and the In accordance with relevant laws and regulations such as the National Work Safety Law and the Regulations on Civilized Construction Site Construction of the South-to-North Water Diversion Project, combined with the construction characteristics of this project, our project department formulated the "Production Safety Responsibility System" and established a production safety organization. In accordance with the principles of "managing production must manage safety" and "safety production is everyone's responsibility", the project department clarified the safety responsibilities of leaders at all levels, functional departments and various personnel in construction and production activities, and signed them at all levels. Responsibility letters and regular assessments, evaluations, rewards and punishments.

Based on the characteristics of the project, the project department prepared guiding documents such as safety production operating procedures and safe operation instructions, and formed a compilation of safety production systems, including: safety production training system, regular meeting system, and labor protection supplies management system , internal accident investigation and handling system, safety production inspection system, safety production assessment system, etc. Various rules and regulations are sound and effectively implemented.

2. Monitoring of major hazard sources and investigation and management of hidden accident hazards

Based on the characteristics of this project, the project department will monitor the unsafe behavior of people during construction, the unsafe state of objects, and the operation A risk assessment has been conducted on unsafe factors in the environment, etc., and major hazard sources have been identified, and corresponding emergency plans or management plans have been formulated to prevent accidents. The major hazard sources identified in this project are:

①Working at height;

②Collapse;

③Mechanical injury;

④Fire;

⑤Flood;

⑥Food poisoning;

⑦Construction electricity.

The project department is equipped with qualified full-time safety officers who conduct daily inspections of key areas such as construction areas, living areas, foundation pit slopes, roads, and cofferdams, and strictly abide by the safety production inspection system. , conduct a major inspection at least once a month, and immediately rectify any safety hazards discovered during inspections or inspections. Construction will continue only after the rectifications are passed.

3. The formulation and implementation of winter construction safety measures

In order to ensure the steady and orderly advancement of winter construction and ensure construction quality and safe production, the project department has formulated the "Winter Construction Safety Technical Measures" and actively held a special meeting on winter construction to ensure the smooth progress of all winter construction work. The project department mainly deploys work from the following aspects:

First, raise awareness, strengthen the organization and leadership of winter safety production work, fully implement the safety production responsibility system at all levels, and strengthen supervision of the implementation of safety responsibilities examine.

The second is to carry out safety production inspections and implement safety assurance measures. According to the characteristics of winter construction, carefully analyze the types and causes of accidents, find various hidden dangers of accidents and weak links in safety production management, truly know the sources of accident hazards and carry out key supervision.

The third is to highlight key points and strengthen safety management at construction sites. Carry out publicity, education and training on winter construction safety production knowledge to improve workers' self-prevention awareness and safe operation skills.

4. Safety management at the construction site

The project department strictly followed the safety production training system and conducted pre-job training for personnel entering the site, and conducted safety production operations for various types of work before construction. Technical briefing on procedures. Operators of various mechanical equipment must be certified to work.

Based on the current construction tasks, the project department takes various measures to ensure construction safety:

①Enclose the foundation pit, and have a dedicated person responsible for the safety around the foundation pit, and conduct daily inspections of the foundation pit. Inspect the pit slope and its surroundings to ensure the safety of the foundation pit.

② Various warning signs and signs have been set up at the construction site, and a special safety bulletin board has been set up in the project department to carry out long-term publicity and education to the majority of employees.

③Send dedicated personnel to maintain the construction cofferdams and roads to ensure safe operation during the construction period.

④ Full-time and part-time safety officers will conduct daily inspections of the construction area to rectify hidden dangers in a timely manner to ensure that accidents are nipped in the bud.

5. Maintenance and repair status of equipment and facilities

The main construction equipment currently in use for this project include concrete mixing stations, tower cranes, excavators, loaders, and dump trucks. In order to do a good job To carry out winter protection work such as seasonal maintenance, wind protection and anti-freezing of mechanical equipment to ensure the safety of mechanical equipment construction in winter, the project department mainly takes the following measures:

First, arrange inspections in advance and implement and arrange maintenance items, repair parts and Plan the maintenance time, carefully connect all tasks in an orderly manner, and ensure that the work is busy but not chaotic.

Second, in accordance with the winter maintenance regulations for mechanical equipment, seasonal maintenance of mechanical equipment was carried out. All construction machinery, especially large mechanical equipment, should replace winter lubricating oil, antifreeze, and check engine preheating in advance as required. system etc. According to weather changes, replace diesel oil in time and fill the water tank with antifreeze. If the water tank is not filled with antifreeze, drain the water in time after stopping use. When the oil in the tank freezes, it is strictly forbidden to bake it with an open flame. Use hot water and steam. thaw.

The third is to organize mechanical equipment management, operation and driving personnel to learn winter protection, maintenance and safe operation knowledge of mechanical equipment at regular safety meetings, analyze the characteristics of winter mechanical construction and the causes, hazards and preventive measures of accidents, and carefully Summarize experiences and lessons and improve the ability to prevent accidents.

6. Establishment of safety accident emergency plans

The project department has formulated special emergency plans for fire, explosion, food poisoning, flood control, etc., as well as a comprehensive emergency plan for safety accidents, and the rescue procedures in the plan and rescue measures are perfect, and the plans are coordinated and closely connected with each other. The project department conducted training and drills on various plans, and ensured that relevant personnel should be aware of and master them proficiently.

At present, all the work of the project department has been carried out smoothly and on track according to the winter construction organization plan. All safety measures for winter construction have been put in place, laying the foundation for completing construction and production tasks with high quality and efficiency.

2. Construction self-inspection report

According to document (20xx) No. 102 issued by the Office of Safety Production Committee of xxx Economic and Technological Development Zone and the spirit of the meeting, combined with the actual safety production work of our company , organized this major inspection of hidden dangers in production safety, and now report the relevant inspection work as follows.

1. Implement the responsibilities for the inspection of safety hazards

A leading group for the inspection of safety hazards has been established, led by manager xxx as the team leader, and safety director xxx as the deputy leader ; Deputy project manager xxx, safety officers xxx, xxx, and foreman of each building are members, responsible for the investigation and management of hidden safety hazards at the construction site under construction of our company. Responsibilities were clarified and implemented at all levels to ensure the smooth progress of work related to the investigation and management of potential safety hazards.

2. Hidden Hazard Investigation

According to the spirit of the provincial video and telephone conference on production safety and the spirit of the national construction safety production video and telephone conference and the spirit of the documents, our company, on the basis of the major inspection, Each construction project and team leader led their respective workers to inspect their respective work areas. Judging from the inspection, we can basically comply with municipal and district laws, regulations and standards regarding production safety. We have also formulated systems and measures for production safety and adopted financial penalties. The level of production safety at the construction site has improved. Improvement, habitual illegal operations such as Sanbao, Sikou, Wulinbian, high-altitude operations, and scaffolding have been improved, and the safety awareness of employees has been significantly improved compared with the previous stage.

For some projects with greater risks, the special safety construction plan shall be compiled by on-site professional engineering and technical personnel based on the actual situation of the project, and then reviewed by professional and technical personnel from the technical department of the construction enterprise and professional supervision engineers from the supervision unit. If the review is successful, the program shall be approved by Signed by the technical person in charge of the construction company and the chief engineer of the supervision unit, the specific inspection and implementation status is as follows:

(1) Scaffolding removal

Removal of cantilevered fastener steel pipe scaffolding and floor-standing scaffolding , comply with the specifications of the Ministry of Construction and the design requirements of the construction organization. Before dismantling, comprehensively check whether the fastener connections, connecting wall rods, and support systems of the scaffolding meet the safety requirements; during the construction, the project department managers shall perform their duties and strictly follow the technical measures specified in the plan. , inspect and supervise the work of construction workers. The demolition sequence should be carried out layer by layer from top to bottom. It is strictly forbidden to work up and down at the same time. All wall-connecting parts are dismantled layer by layer along with the scaffolding. It is strictly forbidden to dismantle the wall-connecting parts first and then dismantle the scaffolding. When dismantling the cantilevered scaffolding, fences and warning signs should be set up on the ground, and special personnel should be assigned to guard the site. Non-operators are strictly prohibited from entering. Strictly implement safety technical briefings, strengthen the safety awareness of construction workers, detect hidden dangers, plug loopholes, and avoid accidents.

(2) Temporary power consumption on site

Each project construction adopts TN-S system, and each project department conducts wiring and power distribution based on the actual needs of on-site construction electricity. The "Special Plan for Safe Electricity Use in Construction" prepared by each project department includes the calculation of electricity load at each stage, the burial of distribution lines, the setting of main distribution boxes and distribution boxes, lighting electricity, and on-site electricity safety protection measures. and on-site construction personnel's explanation of construction electricity consumption, etc. The electricity used in the construction of each project implements "three-level power distribution and two-level protection". The large and small distribution boxes and switch boxes all meet the standards. The switch boxes are set up according to the requirements of "one machine, one gate, one leakage and one box", and the power boxes are all protected. Rain measures should be taken and electrical box maintenance should be carried out in a timely manner and electrician maintenance records should be kept.

(3) Tower cranes and construction elevators

The tower cranes and construction elevators used in each project all formulate detailed construction plans in accordance with the instructions and combined with the operating conditions; after testing and research by Deyang City special equipment The hospital passed the test and issued a license. Installation and disassembly personnel have been trained and assessed and obtained certificates of qualification; each jacking operation must be signed and documented; drivers and commanders also conducted safety briefings before targeted operations.

(4) Fire safety

Fire safety responsibility letters were signed for each team and the construction site was divided into fire protection post responsibility areas. Publicity boards, banners, slogans, etc. were also used to vigorously publicize each fire safety responsibility letter. Fire safety knowledge, accident prevention methods and self-protection related knowledge. Fire extinguishers are placed at safe passages and locations prone to open flames; when there is a fire during construction, effective protective measures are taken and dedicated personnel are assigned to watch the fire.

(5) Civilized construction on site

The construction site will be cleaned every day, and the road surface will be paved with hard covering. Before leaving the vehicle, use high-pressure water cannons to wash the vehicle body to prevent sediment from being taken away from the site and contaminating the road. There are complete warning signs on site. There are dedicated personnel responsible for cleaning the site, and sewage and garbage are discharged and transported out in a timely manner. Materials and components at the construction site are stacked according to type and specification; the on-site steel bar processing yard enclosure is divided according to the construction site area.

(6) Hygiene and fire prevention in office areas and living areas

The construction site is separated into three areas. A dormitory management system is set up at the entrance of the dormitory and fire extinguishers are hung in the aisles. Dormitories and toilets are hygienic. There is a dedicated person responsible for cleaning, timely discharge and transportation of domestic sewage and garbage; after the workers leave the dormitory, the electrician is responsible for turning off the power and shutting off the power. The use of flammable items such as "fast-heating" and "electric stoves" is strictly prohibited in the dormitory. Once discovered, they will be confiscated immediately and fined .

(7) Work with certificates

Construction site project managers, project directors, full-time safety production managers and special operations personnel must hold certificates to work. Our company will organize on-site inspections from time to time. The construction personnel participating in the construction work will be subject to random inspections on their performance of their duties with certificates, and their certificates will be strictly managed. The original certificates and copies must be retained by the relevant departments for storage and relevant records should be kept.

In response to the existing problems, our company requires all project departments to continue to carry out in-depth investigation of potential safety hazards, promptly adopt "four certain" measures for the identified safety hazards, and further strengthen publicity and education. Comprehensively raise awareness of the importance of the investigation of hidden dangers in production safety, and enhance the sense of urgency and responsibility; further systematically summarize the work in the previous stage, take active measures to existing problems and weak links, continue to further promote the investigation and management of hidden dangers, and strictly control violations of regulations , nip all unsafe factors in the bud.

3. Construction self-inspection report

According to the requirements of the superior authorities and the supervision department, our company has conducted inspections on each construction site, namely Tulou Village, Zhangtou Village, and Beixiaoying Village. , Tucheng Village, and Beizhuanghu Village solar bathroom projects, we carefully conducted self-examination and rectification, which lasted 10 days from December 20 to 31, 20xx. Relevant personnel were organized to conduct key inspections of the above-mentioned projects. The inspection status is now reported as follows.

1. Basic situation of inspection

Our company has undertaken *** five solar bathrooms in Tulou Village, Zhangtou Village, Beixiaoying Village, Tucheng Village and Beizhuanghu Village The project has a total construction area of ??1700m2. Through careful inspection of each construction site, it was found that all construction projects had quality and safety problems of varying degrees. To this end, our company dealt with the five construction projects accordingly, issued five time-limited rectification notices, and issued inspections Record and submit five rectification opinions.

2. Existing problems

(1) Management:

1. The projects under construction are numerous and scattered, coupled with insufficient manpower, there is insufficient supervision. in place phenomenon. There is less regular work, and the outstanding work is only superficial, making safety production work important in talking about and secondary in doing.

2. The project department has just been established and has poor coordination with each construction site. Sometimes the instruction cannot be reached, or the instruction cannot be executed. For example, during the construction of Tulou Village, the project department arranged for positioning and trenching. As a result, when the technical person in charge arrived at the site, the construction site opened the trenches on its own. Due to unfavorable protective measures, landslides occurred. Because the positioning of Beizhuanghu Village was not well negotiated with the village government, the phenomenon of three positionings occurred.

3. There is poor coordination between each construction site and the local village government, resulting in uneven construction progress at each construction site.

4. Some construction sites ignore the overall situation and do not understand the general situation. They only care about the interests of the department, resulting in late procrastination.

(2) Construction site aspects:

1. The construction site is chaotic, with building materials piled up and disorganized. Especially in Beizhuanghu Village, closed construction is not implemented, and paddock operations and The installation of safety and other protective facilities was not done well.

2. The electrodes used for construction are not standardized, and the principle of "one machine, one gate, one leakage, one box" for power distribution is not strictly implemented. The distribution lines are chaotic, and there are even direct connections between * wires. This problem exists in all five construction sites.

3. The erection of construction supports is not standardized and the distance between poles is too large. The erection of construction supports failed to meet the requirements, causing instability and instability, leaving potential safety hazards. The edge protection measures are ineffective and the construction is ineffective.

4. There are overturned nail boards at the construction site that were not cleaned up in time, causing safety hazards.

5. The construction scaffolding is not erected in a standardized manner, the distance between the outer frames and the crossbars is too large, and there is no guardrail on the working surface.

(3) Construction technology:

1. The inspection measures for building materials were not strict, and the cement, sand and stone inspection reports were not retrieved in time.

2. The stirrup spacing in the structural columns is insufficient and the binding is not tight, and the connecting bars between the structural columns of the wall at some construction sites are irregular. At the Beizhuanghu construction site, the main and secondary reinforcements were used backwards. There are fewer stirrups between the double-layer steel bars on the roof, resulting in a smaller spacing between the two-layer steel bars.

3. The construction of brick masonry did not strictly follow the "16" operating procedures, the mortar was not full, and the corner overlaps were not embedded. Bricks are arranged unevenly on some construction sites, resulting in uneven gaps.

4. The winter construction work was not done well, especially the wall mortar. Except for hot water being heated in Tucheng Village, the remaining four construction sites did not have heating measures.

3. Next work plan

(1) Strengthen the supervision of each construction site and coordinate with each village.

(2) Organize training, run night schools for migrant workers, strictly control the "access" system, and ensure the qualifications of employees.

(3) Strengthen internal work coordination, further straighten out working relationships, and strictly prohibit illegal operations and illegal command.

(4) Supervise all construction units to rectify the detected problems as soon as possible, and the project department organizes professional inspections until the rectification requirements are met.

(5) Strengthen the "three members" work of construction enterprises and enhance their sense of work responsibility and on-site control capabilities. Further strengthen the arrangement awareness of construction workers and improve their self-protection capabilities.

(6) Further establish and improve corporate credit files and strictly honor rewards and punishments.

4. Construction self-inspection and self-inspection report

Our unit has established a "self-inspection and self-inspection" safety inspection team to carry out the construction of the wind turbine foundation capping project of Daqing Aobao Wind Farm (48MW) Safety inspections are carried out to ensure the smooth development of production and other activities during the National Day.

Self-examination and self-examination team members:

Team leader: xxx.

Deputy team leader: xxx.

Team members: xxx.

1. Safety management inspection

1. Safety production responsibility system

A safety production responsibility system, various rules and regulations, and safety technical operating procedures have been established.

2. Special plan

The relevant special safety plan has been reviewed and approved by the supervision unit and has been implemented as required.

3. Technical disclosure of sub-projects

Written construction safety disclosure has been made to the construction personnel.

4. Safety inspection

Regular safety inspections are carried out and hidden dangers detected are rectified in a timely manner.

5. Safety education

Provide safety education to construction personnel and complete safety training on time.

2. Civilized construction inspection

1. On-site fencing

The fencing material is stable and clean, and is set up along the perimeter of the construction site, with a fencing height of 1.2 meters.

2. Stacking of construction materials

Materials should be stacked according to the plan layout, and the name, variety, specifications and other signs should be hung on the material piles.

3. On-site fire prevention

Fire protection measures and systems are in place, and fire extinguishers are provided.

3. On-site construction electricity inspection

Temporary power grounding during construction is set up in accordance with the specifications and reviewed. Relevant protective measures have been taken for external power protection. The switch box of the distribution box complies with the requirements. Three-level power distribution and two-level protection requirements are required. The power box has a door and is maintained and managed by a full-time electrician. The on-site lighting has loop and leakage protection.

IV. Safety protection inspection

Construction workers entering the site must wear safety helmets, which have been implemented as required.

5. Inspection of construction machinery

Circular saws, handheld power tools, welders, submersible pumps and other construction machinery are all protected from zero contact and leakage protection, and mechanical operations are equipped with operating procedures.

5. Construction self-inspection report

The No. 1 office building and No. 2 and No. 3 workshops of the new factory of Chengdu Detong Food Co., Ltd. undertaken by my unit have been since December 20xx. Since the start of construction on the 12th, the safety and quality of the project have met the specification requirements. The safety self-inspection status of the project is as follows:

1. Our construction unit regularly organizes personnel to conduct comprehensive inspections of construction site safety every week. When problems are discovered, personnel are immediately organized to rectify them.

2. All welders are certified to work. Welders wear protective clothing during operation. Arc welders wear protective masks. There are welder operating procedures and safety warning signs within the scope of the welding operation.

3. All safety warning signs at and around the construction site are correctly hung and complete.

4. The metal shells of all equipment for temporary power use on site are connected to the special protective neutral line. The special protective neutral line is led out from the neutral line terminal in the power distribution room. The unified signs of the protective neutral line are green and yellow. Two-color thread. Various mechanical equipment ensures "one machine, one box, one gate and one leakage protection"; all electrical equipment at the construction site, except for protective zero connection, are equipped with leakage protectors at the head end of the equipment load line.

5. On-site operation of pipelines.

6. Tower crane operators are all certified and assigned with dedicated personnel to direct operations. The operating procedures and safety warning signs around the tower crane are complete.

7. During the inspection, it was found that some workers were not wearing safety helmets. In response to this problem, the safety officers immediately educated them on safety knowledge. Now all workers at the construction site wear safety helmets, and do not wear safety helmets at high places or near the edges. All workers wear seat belts.

8. The erection and installation of the external frame and the binding are in compliance with the requirements of the regulations. The erectors are all certified and wear safety belts during the operation.

9. The protective shed erected at the entrance of the passage is firm and meets the requirements of the regulations; protective railings and flat nets are installed at the entrances of stairs and elevator shafts in accordance with the regulations, and the reserved openings are tightly protected.

10. Various materials and components should be stacked according to their varieties and specifications, and obvious signs should be set up. The cement warehouse is equipped with effective measures to prevent rain and moisture, and is stacked according to varieties and models.

11. The construction site is equipped with sufficient fire-fighting equipment, and the fire-fighting equipment is sensitive and effective.

12. There should be a sound security and security system and a public security and security leading group with security personnel.

13. If individual individuals are found to have private or indiscriminate connections, the security officer will immediately criticize and educate them.