Joke Collection Website - Bulletin headlines - Minutes of the special meeting on discipline and safety?
Minutes of the special meeting on discipline and safety?
one
Topic: emphasize the post-holiday work, convey the spirit of the special meeting of the Municipal Administration of Work Safety 65438+1October 28th, and deploy the post-holiday safety management of the company.
Time: 20xx65438+1October 29th.
Venue: conference room on the second floor of the company's production building
Participants: the person in charge of safety work in XXXXX production plant, the person in charge of vehicle management in the safety department, the safety director of the group company, the minister of safety and environmental protection, and all members of the safety and environmental protection department.
Moderator: XXXXX
Recorder: XXXXX
Main contents:
Mu Xingkai:
First, summarize the safety work during the festival.
1, during the holiday, the company's production was stable, all units strictly implemented the relevant requirements of the safety and environmental protection regular meeting before 1+8, maintained good labor discipline, improved the management of various special operations, and the duty personnel of various manufacturers and workshops were able to arrive at their posts on time, thus ensuring production safety.
2.65438 On June 26th, * * * the fourth day of the first month * * * The Safety and Environmental Protection Department inspected 36 important devices, key positions and various shift records of nine branches of the company, put forward specific requirements for the problems found in the inspection, and issued a notice through the company's OA network. All units should return to the announcement and rectify the contents related to their own units.
Second, convey the contents of the special meeting of 65438+1October 28th on post-holiday safety work of the Municipal Administration of Work Safety.
1, during the festival, there were two traffic accidents in our city, one of which was a big accident, because two cars collided, causing five deaths; In addition, there was a rollover accident, causing two people to die on the spot;
2. In view of the above accidents, the Municipal Safety Supervision Bureau put forward three requirements for the main production enterprises in our city: First, strengthen post-holiday work, strictly implement the system of leading cadres in enterprises to ensure safe production; Secondly, it is necessary to strengthen the investigation and management of hidden dangers of enterprises. In particular, Heihua Group is a large-scale dangerous chemical production enterprise in our city, and it is necessary to persist in the investigation of hidden dangers and implement them to people. The third is to strengthen the management of labor discipline in enterprises, put an end to all disciplinary acts such as taking up posts after drinking, and carry out in-depth and lasting work to crack down on "three violations".
Third, put forward specific work requirements for each production unit.
1. After the meeting, each branch factory should organize a post-holiday care meeting, and take the post-holiday care work of the branch factory, workshop and team as the focus of recent work, and convey it to every employee.
2, each unit * * * factory, workshop * * to continue to implement and strengthen the leadership shift, duty system, shift leader on duty at night to attend the shift handover meeting, in order to fully control the night shift production.
3. In the first month of the lunar calendar, all special operations of all units will continue to be upgraded and managed. The Safety and Environmental Protection Department will assign a special person to be on duty 24 hours a day, and all units should report the special operation in time to ensure that there is a special person to follow up the service at the job site.
4, strengthen the safety management of outdoor work and inspection route, ensure the safety lighting in good condition at night; Every day, the accumulated ice in each pipe gallery, pipe rack, pipeline and device, and operation area must be removed; Can not be removed daily, protective measures must be taken, and set up warning lights;
5, strengthen post-holiday labor discipline, put an end to all drunken mount guard, off-duty, post leakage phenomenon;
6. Strengthen team safety management, hold a good handover meeting, require each team to ensure the quality of the meeting, fill in a complete handover record according to the requirements of "ten handover" and "five no handover" of the handover system, and the leaders of branches and workshops or safety personnel will check and sign it regularly;
7, each branch to strengthen the investigation of hidden dangers, to ensure that the safety inspection once a day, the security department at least twice a week to check the whole company, to ensure that key equipment and key positions in place, leaving no dead ends;
8. The company conducts a safety training for drivers of various motor vehicles, focusing on seven prohibitions;
9. Strengthen the warehouse management of hazardous chemicals and toxic and harmful substances, and the loading management of hazardous chemicals, focusing on ammonia warehouse, alcohol warehouse, ammonium nitrate warehouse, hydrogen peroxide, coke oil tank area, etc. It is necessary to implement the person in charge of safety and ensure the safety management of various operations and finished products in the reservoir area.
10. Strengthen the management of hoisting operation in the company. The crane operation at night must be reported to the safety and environmental protection department to ensure full service and guidance by special personnel.
two
Subject: xx Department Acceptance Meeting
Meeting time: xx 16: 00- 17: 00.
Meeting place: xx department office
Participants:
Moderator:
Meeting minutes:
Meeting contents:
A, xx department annual task analysis, detailed monthly key tasks:
The main * * * landscape project, Baihua Garden landscape project, wetland landscape project, 10 small club and the landscape project around the conference hall started. Garden maintenance
Company establishment approval process. Before the start of the landscape engineering of the project, make preparations for the landscape engineering in advance, arrange the monthly work in a planned way, and implement the soft and hard landscape work of the landscape engineering to everyone.
Second, xxx is responsible for the soft scene work of the landscape engineering of this project:
Garden project starts, responsible for all the work of garden soft landscape, quality control of planting soil, backfilling of planting soil in place, acceptance of seedlings entering the site, whether the varieties, quality and specifications of seedlings are qualified, whether the planting position of seedlings is correct, and the supervision of pre-planting preparation * * * includes the size and depth of digging holes, pruning of seedlings before planting, supervision of water conservation after planting, and control of the time schedule of garden project.
Three. Xxx is responsible for the hard landscape project of this project;
Hard scene materials enter the site for acceptance, supervise the quality requirements of hard scene foundation and pavement, and control the time schedule of landscape engineering.
Fourth, the analysis of the yellow crisis: the quality of planting soil is not up to standard, the backfilling of planting soil is not in place, the quality of seedlings is not up to standard, and seedlings die after planting; Solution: Report to the competent leader in advance when problems are found, put forward solutions, control the depth and quality of planting soil in strict accordance with the construction drawings of landscape engineering, check the specifications and quality of trees and shrubs, control the depth of planting trees and shrubs and prune them properly before planting, so as to improve the survival rate without affecting the appearance.
Garden project starts, responsible for all the work of garden soft landscape, quality control of planting soil, backfilling of planting soil in place, acceptance of seedlings entering the site, whether the varieties, quality and specifications of seedlings are qualified, whether the planting position of seedlings is correct, and the supervision of pre-planting preparation * * * includes the size and depth of digging holes, pruning of seedlings before planting, supervision of water conservation after planting, and control of the time schedule of garden project.
Head of intransitive verbs department: * * Standards and requirements * * *
1. I hope that in the new year, I will earnestly and actively do every job of the landscape department, carefully prepare and be familiar with the landscape engineering drawings before the landscape engineering starts, and control them in advance.
2. Learn the quality management and process management related to landscape engineering.
3. Learn soft scene professional knowledge.
4. Cooperate with the department heads.
5, in the landscaping work, do the best, on time, quality and quantity to complete the annual plan.
three
Time: February 9, 20XX 15:00
Venue: XXXXX Mine Meeting Room
Moderator: XXXXX
Participants; XXXXXXXX
Record: Zhang Jianwei
Meeting contents:
1. Wang Hongwei carried out the spirit of this morning's teleconference on safety production of Henan Coal Chemical Group Company. At the video conference, first of all, the member companies of each group company gave a brief report on the safety production work in January. Finally, Chen Xiangen, the general manager of the group company, made an important speech on the safety production during the Spring Festival and the two sessions, the major hidden dangers in mines recently discovered, the production and operation situation of the group company, the current grim situation and the requirements for the resumption of production in small coal mines with resource integration, and put forward hopes and requirements. The original text of the general manager's speech is attached with * * *, and he asked to do a good job of accepting the heart. All units, departments and offices are required to hold a warm-hearted meeting. In particular, it is necessary to do a good job in stabilizing the minds of those who return to work after the Spring Festival and those who are going back on the fifteenth day of the first month, so as to keep abreast of their ideological trends and avoid emotional fluctuations and potential safety hazards.
Secondly, according to the spirit of the morning teleconference, Director Zhu added that this morning's teleconference and afternoon's meeting in our mine were both safety production meetings and heart-warming meetings. According to the recent work practice in our mine, the arrangement is as follows:
1, all personnel in the mine should do a good job of accepting the heart, adjust their mentality from the state of holidays to the state of work, and do their jobs conscientiously.
2. Strictly implement the production responsibility system and post responsibility system of Ansheng at all levels, earnestly implement the shutdown measures before returning to work, strengthen the inspection of toxic and harmful gases at the wellhead, keep a close eye on illegal production, strengthen the inspection and security of mining areas, and do a good job in fire prevention and theft prevention. Finish all the work and tasks arranged by superior leaders and departments on time.
3, seriously implement the duty system. Stick to your post when you are on duty, answer the phone in time, and it is strictly forbidden to leave your post and drink alcohol without authorization.
4. Strictly abide by labor discipline, go to work on time, go out for leave and perform leave formalities according to regulations, and don't do anything unrelated to work during work.
5. Do a good job in organizing the internship of special types of work in No.2 Mine to ensure the safety and internship effect of interns during their internship in No.2 Mine. The personnel on duty should pay attention to their posts.
6. Although it is spring, but the weather is dry, it is necessary to do a good job of "three defenses in winter", especially fire hazards, eliminate ground fire hazards in time, sprinkle water on mining areas and industrial squares regularly, and it is strictly forbidden to burn garbage. Fireworks and firecrackers must be set off in designated areas. Check the ground fire-fighting equipment, and replace it in time if it is invalid or unqualified. Check and maintain the ground fire-fighting waterway to ensure normal use.
7. Conscientiously implement Henan Coal Chemical [20XX] 1 1 Notice on Doing a Good Job in Safety and Stability during the Spring Festival of 20XX and the National "Two Sessions", strengthen the sense of responsibility, urgency and mission in doing a good job in safety production according to the spirit of the document, and overcome paralysis, lax thinking and war-weariness with the spirit of being highly responsible to enterprises and employees. Understand the situation clearly, define the responsibilities, do a good job in safety production during the Spring Festival of 20XX and the National "Two Sessions" to ensure the safety production situation and the stability of the mining area.
8. Seriously prepare for the resumption of work and production.
- Previous article:The Structure of Chinese Sentences
- Next article:On which river is the Bund in Shanghai?
- Related articles
- Slogan to aid Xinjiang
- April 2nd International Children's Book Day theme slogan
- Contents of handwritten newspaper for legal protection of the Yangtze River
- Corporate Culture of China Petrochemical International Petroleum Exploration and Development Co., Ltd.
- CRRC construction slogan?
- Why do most men love beautiful women?
- How does PSP's track branch task prepare for charity activities?
- Publicity slogan to help epidemic prevention and control
- Article 17 Urban environmental sanitation cleaning and cleaning work shall be carried out in accordance with the following regulations: (1) Major urban roads and squares shall be responsible for envir
- Do you want tickets for the star concert of Donggang Seafood Festival in Liaoning Province?