Is Party A responsible or the construction unit responsible for the electricity consumption at the construction site?

The water and electricity costs before the handover of the project shall be provided by the owner; But the cost is paid by the construction party, and finally paid by the construction party to the construction party in the project payment.

The construction unit shall pay the water and electricity fee to the water supply and power supply unit. As a cost, it will be calculated together with the employer (the construction unit) in the completion settlement (specifically reflected in the construction water and electricity costs included in the application quota project). ?

This is reflected in the quota, and the water and electricity consumption of all processes includes certain consumption; For example, when pouring concrete, the prices of water, electricity and corresponding machinery have been included in the corresponding quota; The cost of erecting hydropower facilities has been included in the cost of temporary measures on the construction site.

Extended data:

Site safety and civilized construction management system

1, the construction unit should strictly abide by the national and local government issued by the safety construction, civilized construction and other norms and regulations, comply with the site management regulations of the construction unit. The construction unit will invite relevant departments for inspection from time to time according to the requirements of "Standard for Inspection and Evaluation of Civilized Construction on Site of XXX Construction Project". Can not meet the standards of civilized construction site, the construction unit can be ordered to stop work for rectification.

2. The construction site must be equipped with "five maps and one card" as required, and the content and form of the card must meet the requirements of relevant regulations.

3, the construction site should have appropriate slogans and safety warning signs. Slogans and signs shall be drawn up by the construction unit and implemented after being examined and approved by the on-site representative of Party A.. Do not scribble, post or hang at will.

4, the construction site closed management, the construction unit to develop the corresponding past management system and strictly enforced, the construction site management personnel, construction personnel must wear identification cards in and out, non-construction personnel shall not enter the construction site without authorization. The content and format of the card shall be drawn up by the construction unit and implemented after being examined and approved by Party A. ..

5. The construction site of this project takes the red line of the general plane of this project and the temporary leased land as the construction site. Before construction, the construction unit must arrange temporary facilities in the area designated by Party A, and submit the general plan to Party A for approval before implementation.