Emergency plans and measures for flood control (5 articles are preferred)
Emergency plans and measures for flood control (5 items are preferred) (1) In order to strengthen the flood control work in schools, effectively prevent floods, reduce the losses caused by floods to schools, ensure the safety of state property and the lives of teachers and students, and maintain the normal teaching order in schools, this plan is formulated in combination with the actual situation of our school.
First, the flood control emergency leading group
Team leader: xxx
Deputy leader: xxx
Team members:
Second, the main responsibilities
1, strengthen leadership, improve organization, strengthen job responsibilities, strengthen research on flood control and flood fighting, and improve the formulation of various emergency plans and the implementation of various measures.
2. Make full use of various channels to publicize and educate flood control and flood fighting knowledge, organize and guide all teachers and students to carry out flood control and flood fighting knowledge popularization education, extensively carry out flood control and flood fighting self-help and mutual rescue training, and continuously improve teachers and students' awareness and basic skills of flood control and flood fighting. Strengthen the ideological guidance for teachers and students, do not cause unnecessary panic, and ensure the normal teaching order.
3, earnestly do a good job in material security, actively raise reserves in strict accordance with the requirements of the plan, implement food and drinking water, antifreeze and rainproof, teaching AIDS, emergency equipment and other materials, strengthen management, so that it always maintains a good state of combat readiness.
4. Take all necessary measures to organize all forces to carry out flood control and flood fighting in an all-round way to minimize the losses caused by flood control and flood fighting.
5. Seriously implement relevant policies and regulations. In accordance with the requirements of flood control, a daily weather monitoring system must be established, and the development of disasters should be reported at any time, and supervision and inspection by the competent leaders should be accepted to prevent sudden flood disasters. Dangerous walls, toilets, dangerous buildings and other important parts should be set up warning signs and timely maintenance; Clear ditches in time to keep the water flowing smoothly.
6. Effectively implement flood control measures. The school leading group for flood control and disaster reduction should get in touch with the higher authorities in time, predict the risk of school flood disaster, and make an assessment and prediction on the degree of risk. During the rainstorm, large-scale teacher-student gatherings and activities should be avoided as far as possible; Take preventive measures during the examination to ensure the smooth progress of the examination. Once a disaster happens, it should be reported in time, and the emergency plan for flood control should be started as soon as possible to minimize casualties and property losses.
7, to carry out school buildings, the surrounding landscape survey, scientific flood control measures. Under the unified leadership of the school leading group for flood control and disaster reduction, all departments should cooperate closely, and Qi Xin should work together to exchange information, ensure the smooth flow of information, and report the situation step by step to keep abreast of the weather conditions. It is necessary to implement disaster prevention plan and collective plan prevention network according to the identified danger points and hidden dangers, so as to provide correct basis for formulating flood control and water disaster prevention measures.
8. Improve various systems and enhance emergency response capabilities. It is necessary to further improve the duty system, the danger inspection system and the disaster quick report system. All departments should implement the duty shift system, patrol and inspect dangerous areas, implement preventive measures, and change passive disaster prevention into active disaster prevention.
9, mobilize all positive factors, quickly restore the order of education and teaching, and comprehensively guarantee and promote social security and stability.
Three. Emergency measures for flood control and disaster relief:
1. After receiving the flood control and flood prevention forecast from the superior, start this plan quickly, and the members of the flood control leading group and the flood control rescue team will be in place quickly, and evacuate to safety in an organized and orderly manner. The leading group immediately entered the wartime state, issued relevant news and early warning according to law, and comprehensively organized various flood control and flood fighting work.
2, organize relevant personnel to conduct a comprehensive inspection of buildings, blockade and close dangerous places, stop all indoor large-scale activities.
3. During flood control, the members of the leading group and the emergency rescue team will protect the school property to the maximum extent and transfer valuable materials and equipment to a safe place on the premise of ensuring the safety of teachers and students.
4. Strengthen the management of inflammable and explosive materials, toxic and harmful chemicals, and strengthen the protection of important places such as gatehouse and computer room to ensure the smooth progress of flood control and disaster reduction.
5, strengthen the publicity and education of teachers and students, do a good job of ideological stability of teachers, students and parents. The person in charge, the class teacher and the classroom teacher should take good care of the students, and it is strictly forbidden for them to run around and ensure their safety.
6, timely notify the health and epidemic prevention departments to the school to do a good job of rescue and epidemic prevention.
7, strengthen all kinds of duty on duty, keep communication smooth, keep abreast of all kinds of situations, and spare no effort to maintain normal teaching and work order.
8, according to the plan to carry out the material preparation work.
9, quickly carry out on-site rescue work with ambulance personnel as the main content, and timely transfer the injured to a nearby ambulance station for rescue.
10, strengthen campus duty and patrol to prevent all kinds of illegal and criminal activities. Strengthen public security work in the process of flood fighting and disaster relief, actively contact the police station, ensure the safety of teachers and students' lives and property and the safety of school property, severely crack down on illegal and criminal activities, and ensure the normal teaching and living order of the school.
165438+
12. In the emergency operation of flood control and flood fighting, all departments should cooperate closely and obey the command to ensure the smooth implementation of government decrees and all work.
This plan shall be implemented as of the date of formulation.
Emergency plans and measures for flood control (preferably five) (2) In order to ensure the normal life and work order of the owner and the safety of life and property, and ensure the normal operation of all equipment, all buildings, facilities and equipment will not be damaged during the safe flood control in summer.
One. area of application
limits of jurisdiction
The second is to supervise implementation.
Department of Safety and Environment
Three. Flood control emergency procedures
The first plan:
When the Meteorological Observatory issued a rainstorm warning, all members of the leading group for flood control work were in place. Timely summarize flood control information and report local conditions, water conditions and rain conditions. Office personnel should be on duty in accordance with their respective responsibilities, further check and implement various flood control emergency measures, set up flood control teams, and implement emergency supplies.
② The second plan:
When the rainstorm strikes or the relevant departments issue an emergency alarm, the leading group for flood control will immediately hold an emergency meeting or make emergency arrangements. The property office should take flood control as the primary task.
(3) the third plan:
When there is a sudden rainstorm, the rescue team quickly organizes personnel to check and dredge the drainage pipeline in time to ensure smooth drainage; Monitor the water accumulation in the community and basement, report the disaster situation in time, and organize enough temporary drainage equipment for forced drainage when necessary. Ensure the owner's normal life order and property safety.
All relevant departments of the above groups should fulfill their duties and spend the flood season safely to ensure the safety of the owner's life and property and public property. The more critical it is, the more organized and disciplined we should be. Be brave in critical moments and fearless in times of crisis. Always put the interests of the owners first. It is our bounden duty to reassure the head office leaders and satisfy the owners.
Emergency plans and measures for flood control (5 items are preferred) (3 items) 20xx On May 20th, our project department conducted a drill for emergency plans for flood control in Douhe, with the participation of project managers and scaffolding teams.
The main purpose of this drill is to educate all personnel to establish the first aid consciousness of "safety first, prevention first" ideologically; Rescue and treatment measures after the accident. Make personnel strictly follow the principle of "safety first, prevention first" in their work to avoid potential safety hazards. Save lives and protect property in a simple and effective way.
In flood season, due to precipitation and flood, in order to prevent the flood from causing loss of life and property. The flood fighting team organized by the project department went deep into the flood fighting front line, struggled with the flood, simulated drowning and rescue work, and finally protected the safety of life and property.
The drill process is as follows:
At 2 pm, the project department received the warning of Douhe flood, and the commander-in-chief Wang Guoping immediately arranged personnel to go to the scene to carry out flood control work, specifically under the command of Zheng Weikang. Due to the sudden flood, two workers, Wang and Li, unfortunately fell into the water and shouted for help. Zheng Weikang immediately called the lifebuoy tied with rope in advance, and the flood fighting team divided into two teams and threw lifebuoys at the two drowning people. Wang and Li struggled to catch the lifebuoy, and Qi Xin, a rescuer on the shore, helped to pull Wang and Li ashore. Since Wang was not breathing when he was rescued, rescuer Xiao Chuanlong immediately gave him artificial respiration and pressed his chest for cardiopulmonary resuscitation, and finally the rescue was successful.
This drill of flood control plan is going very smoothly, which has played an effective and practical role in the plan, and will certainly play a rescue role for people falling into the water when the flood strikes. The pre-plan exercise achieved the expected results, which enabled the participants to understand the basic knowledge of flood control, have some necessary rescue knowledge and know the importance of the pre-plan. In the future work, we should carry out more drills to ensure the safety of life and property at dangerous times and minimize losses as much as possible.
Emergency plans and measures for flood control (5 are preferred) (4) In order to prevent severe weather such as rainstorm and thunder and lightning, prevent possible floods and ensure the personal safety of teachers and students and campus property, this emergency plan is formulated in combination with the actual situation of our town school.
The first is to set up a leading group for storm prevention and flood control.
Group length: ZZ
Member: ZZZ
Second, the preparatory work
1. Before the rainstorm, all primary and secondary schools should carefully check the condition of school buildings, check whether the roof leaks and the walls are damp, and clean up drainage facilities such as sewer pipes and ditches, and repair them in time if there are any problems;
2. Educate teachers and students about the safety knowledge of preventing rainstorm, lightning and flood, so as to plan ahead;
3. Check the surrounding environment of the school to prevent accidents in the school due to external reasons. Schools close to hillsides should pay close attention to mountain conditions to prevent landslides and other disasters;
4. Check the circuit equipment to prevent accidents caused by water spraying;
5. Units with the task of flood control in qu shui River should set up flood control commandos, implement personnel and responsibilities, and prepare enough sandbags, sand, shovels, raincoats, flashlights and other flood control equipment;
6, check my central school is responsible for flood control of the two gates and river embankment area, make flood control arrangements, prepare personnel and equipment;
7. Each school determines the evacuation route and resettlement site in case of emergency, and organizes teachers and students to carry out self-help, mutual rescue and escape drills.
Third, emergency measures.
1. Pay attention to the weather forecast. In case of bad weather or flood season, the school must arrange 24-hour duty, and all personnel should keep communication open for 24 hours, so as to deploy all kinds of personnel in time in case of emergency;
2. During the rainstorm, school personnel on duty and security personnel should often patrol all parts of the school. Schools with boarding students should focus on inspecting student dormitories. If any danger is found, report it to the supervisor on duty and the unit leader immediately and start the emergency procedure;
3, strong lightning weather, to do a good job of lightning protection of school personnel and electrification, distance education equipment;
4. Once the school building is in danger, quickly organize students to evacuate in an orderly manner and move to a safe area. Teachers should first ensure the personal safety of students;
5, timely through the campus radio, telephone, mobile phone and other media and communication tools to the relevant departments and personnel to transmit information, notification, get support from all sides;
6. Pay attention to the road conditions of students going to and from school. If the road is damaged or there are potential safety hazards, students cannot go home. Schools should properly arrange students and contact their parents in time.
7, according to the unified arrangement of the town government, organize personnel to do a good job of blocking the river bank flood discharge.
Fourth, job requirements
1. We should attach great importance to our thinking, overcome our lax thinking, and be prepared in the spirit of being responsible for the cause of the party and the people.
2, all the work should be implemented, clear division of responsibilities, material reserves in place;
3, organization and coordination, to ensure the smooth implementation of government decrees.
Flood control emergency plans and measures (preferably five) (5) 1. Purpose
In order to protect the life safety of employees, ensure the life and property safety of engineers when the rainy season comes, ensure the normal construction of the construction site, and control the losses to a minimum, according to the spirit of the relevant flood control documents of the state, province, city and county, the emergency plan for flood control in rainy season of the project department of Foxconn employee security room (Phase I) in Hang Jian, Sichuan Province is formulated.
Second, the organization
Emergency leading group for flood control in rainy season in the fourth bid section of Foxconn employee security room (Phase I) in Hang Jian, Sichuan:
Team leader: xxx
Deputy leader: xxx
Team member: xxx
The leading group for flood control and emergency rescue in rainy season in the fourth bid section of Foxconn employee housing (Phase I) in Hang Jian, Sichuan Province is located in the project office.
Contact information of third-party rescue:
Emergency phone number 120, alarm phone number 1 10 and fire phone number 1 19.
Third, the basic principles
The flood control work adheres to the principle of "safety first, constant vigilance, prevention first and all-out rescue", carefully formulates and implements flood control plans, and strengthens drainage measures, scaffolding reinforcement and electrical equipment management. Four, material preparation:
Prepare flood control equipment and materials according to the specific situation of the project department. Prepare pumps, water pipes, tarpaulins, shovels, etc. , and prepare enough rain-proof equipment, which must be kept in good condition.
Serial number: material name: unit: quantity: remarks
1 raincoat rain pants: number of sets: 50
2 pairs of rain boots: 50 pounds
3 water pumps: 5
4 cement bags: each 1000.
5 Shovel: handle: 100
Verb (abbreviation of verb) technical guarantee measures:
1, strengthen the inspection of temporary facilities and temporary power facilities on site, and promptly guide those that do not meet the standards. And take effective measures when reporting.
9. The mobile phone of flood control team members must be turned on 24 hours a day.
Six, production self-help recovery measures and procedures
1, after the emergency rescue, organize the construction personnel to save themselves in production immediately. First, check and eliminate dangers and hidden dangers.
2, continue to observe the danger, and get in touch with the local flood control and flood fighting units, to bring reliable basis for the resumption of work and production, and at the same time get the support and assistance of the local flood control and flood fighting units.
3. The damaged facilities should make a repair plan and measures to prevent damage again, and report to the relevant departments for approval. The rainy season is coming. In order to ensure the safe drainage of the residential area and underground garage, ensure the safety of the owner's vehicle parking, and ensure the owner's normal and orderly life order, according to the spirit of flood control work at all levels and the requirements of flood control work for many years, combined with the actual situation of xxxx residential area, the emergency plan for flood control work is formulated. We expect xxxx to manage the leadership potential, lead the employees of all departments and do its best to do all the work during the flood control period.
First, the establishment of emergency leading group for flood control work
Team leader: xxx
Team members: xxx, xxx
Rescue team: management 2. Responsibilities of flood control work
1, conscientiously implement the spirit of the instructions of the municipal and district property on flood control and drainage, and fully command the flood control work in xxxx community. According to the personnel arrangement of the emergency leading group, all kinds of sudden disasters and accidents occurred in the flood control work of xxxx residential area are dealt with quickly, timely and effectively. Take effective measures, based on the community, adhere to self-protection and self-help, and ensure community safety in flood season.
2, prepare enough flood control materials, according to the danger, put forward the danger and emergency plan. Responsible for inspecting and supervising the implementation of flood control measures; Responsible for inspecting and supervising the preparation of flood control materials; Ensure the owner's normal life order and property safety, and put an end to the problems such as poor drainage in the sinking area of the community and water accumulation in the basement.
Iii. Requirements and measures for flood control work
1, a leading group for flood control and a rescue team were established. Be specifically responsible for the flood control work of the residential area to ensure the flood control safety and the property of the owner from loss; Collect information such as rain and flood in time; Do a good job in flood prevention propaganda and improve the flood prevention awareness of all owners; Make sure no accidents happen. During the flood control period, it is necessary to ensure smooth communication, and flood control team members and duty personnel can make 24-hour telephone calls unblocked. The personnel on duty should stick to their posts, and it is forbidden to leave their posts or take off their posts. In case of rainstorm, the leaders will assign specific work in place, so that everyone in each area is directly responsible. The responsibility system shall be implemented for those who fail to arrive on time and are not seriously responsible for the losses, and those who cause heavy losses shall be investigated for responsibility.
3. Contact work. The safety department should provide safety tips to car owners regularly, and establish a good parking order in the basement. Customer service personnel should know the communication contact information of all underground garage owners, notify the owners when necessary, and cooperate with safe evacuation. In case of heavy rain, we should pay close attention to the rainwater situation and road unobstructed situation in the community and make preparations for contacting all owners.
4, material preparation and the specific responsibilities of each department. According to the actual situation of xxxx community, we should strengthen the inspection of key parts; Clear division of labor among departments; Before, during and after the rain, there are special personnel responsible for monitoring; And formulate corresponding measures to eliminate risks; The following is a clear division of labor and responsibilities of each department:
Finance Department: Make every effort to protect the life and property safety of the Finance Department. In case of special circumstances, report to the superior immediately. At the same time, assist other departments in disaster relief work.
Public Business Department: When the flood comes, the customer service center should do a good job of reminding all owners. For several floors with relatively serious disasters, we should focus on recording flood information and call the owner for details if necessary. If there is a distress call from the owner, the detailed address of the business owner (floor number, unit number, room number and contact information) should be recorded in detail, and it should be reported to the higher authorities immediately to apply for reinforcements.
Greening and cleaning department: do a good job in protecting green vegetation and cleaning residential areas in flood season. Take relevant measures to protect the growth of flowers and trees in bad weather. Do a good job in cleaning the community after the rain, so that every corner of the community can be kept clean at all times. Let the living owners feel the fresh and natural environment, and make the living environment of the community owners more perfect through our efforts. If there is water in the owner's house or warehouse, he should cooperate with the engineering department to help the owner do a good job of cleaning and drainage.
Engineering Department: Engineers should regularly check the hydropower equipment in the residential area, and appropriately increase the inspection frequency in flood season to ensure the normal use and safety of the equipment. Check the smoothness and emergency use of all drainage pipes. Relief materials in case of danger include:
1) Emergency lights should have enough power for use at night.
2) There are many sandbags. Placing sandbags at the entrance of low-lying areas can play a role in intercepting water and prevent upstream rainwater from gathering in low-lying areas. Several floors in the residential area are prone to water accumulation, such as A 1, A3, A5, C 1, etc. Everyone should pay close attention to the water accumulation situation. After the disaster, the sandbags should be moved to the hidden area immediately, and the protection work should be done to avoid affecting the next use.
3) Prepare five shovels and five hooked steel bars, dredge the sewer if necessary, or directly open the manhole cover, so as to speed up the rainwater flow into the sewer and prevent the rainwater from rushing into the garage or warehouse with low terrain. After the disaster, the manhole cover should be put back in place immediately to avoid danger.
4) Drainage equipment, drainage pump and drainage pipe should be placed in a place convenient for taking and placing, and the working condition of the equipment should be checked regularly. If some pipes are not well drained, the accumulated water in this area should be drained to other well-drained areas by a drainage pump. Clean it after use and store it.
Security department: do a good job of security in flood season. If there is a call for help or reinforcements, you should rush to the scene at the first time to do a good job in rescue and security. In case of special circumstances, it shall immediately report to the superior competent department to help the owner solve the problem at a critical moment.
Fourth, start the corresponding plan according to different situations.
The first plan:
When the Meteorological Observatory issued a rainstorm warning, all members of the leading group for flood control work were in place. Timely summarize flood control information and report local conditions, water conditions and rain conditions. Office personnel should be on duty in accordance with their respective responsibilities, further check and implement various flood control emergency measures, set up flood control teams, and implement emergency supplies.
② The second plan:
When the rainstorm strikes or the relevant departments issue an emergency alarm, the leading group for flood control will immediately hold an emergency meeting or make emergency arrangements. The property office should take flood control as the primary task.
(3) the third plan:
When there is a sudden rainstorm, the rescue team quickly organizes personnel to check and dredge the drainage pipeline in time to ensure smooth drainage; Monitor the water accumulation in the community and basement, report the disaster situation in time, and organize enough temporary drainage equipment for forced drainage when necessary. Ensure the owner's normal life order and property safety.
The above groups and departments should fulfill their duties and spend the flood season safely to ensure the safety of the owner's life and property and public property. The more critical it is, the more organized and disciplined we should be. Be brave in critical moments and fearless in times of crisis. Always put the interests of the owners first. It is our bounden duty to reassure the head office leaders and satisfy the owners.
Emergency plans and measures for flood control (preferably five) (6) In order to further improve the flood control work, implement the spirit of flood control work at the higher level and the requirements of the Party Committee of the company for early preparation and early inspection of flood control work, do a good job in flood control work effectively, improve the emergency ability of flood control, ensure the safe and stable operation of power grid and the safety of people's lives and property, ensure the power supply during flood control and emergency repair, and do a good job in accident emergency repair. This plan is specially formulated:
1 Starting conditions and workflow of the plan
1. 1 startup conditions
1. 1. 1 received the notice from the leading group of flood control emergency treatment of power supply company.
1. 1.2 received the flood forecast notice from the county government.
1. 1.3 received a notice from the leading group for emergency handling of production emergencies of the power supply company (hereinafter referred to as the leading group for emergency handling).
1. 1.4 received a report that grass-roots units suffered disasters, resulting in loss of personnel and equipment.
1.2 Plan to start the workflow
After a major flood occurred in the jurisdiction of our hospital, the necessary disposal was carried out in advance according to the emergency response plan for flood control and emergency rescue in our hospital. At the same time, report the basic situation, influence scope and development trend of the flood to the leading group for earthquake relief, flood control and fire accident emergency treatment of the power supply company (hereinafter referred to as the leading group for emergency treatment) at the first time.
2 flood control and emergency handling responsibilities
2. 1 Be responsible for implementing the laws, regulations and provisions of the state and higher authorities on flood emergency rescue and treatment, and comprehensively coordinate the company's flood emergency work.
2.2 Responsible for implementing the tasks deployed by the emergency leading group of power supply station and the emergency instructions issued.
2.3 According to the actual situation of flood, ask the relevant superior departments to decide whether to lift the state of emergency.
2.4 Ensure smooth communication equipment, and coordinate and organize emergency disposal, emergency repair and recovery of power grid and equipment.
3. Response and treatment plans and specific measures
3. 1 set up a flood control working group.
Team leader:
Members:
Phone number of team leader:
On duty day and night:
3.2 After the flood, the flood control team should fully devote themselves to power self-help and recovery, and report to the relevant superiors in time.
3.3 The machinery, equipment and transport vehicles needed for emergency repair in our hospital should be in good emergency use condition;
3.4 Do emergency work for standby power supply of important users, notify all major users in advance to make emergency plans and self-protection measures for power outage accidents of the whole station, check whether there is standby power supply in advance, start standby power supply when necessary, and handle emergency accidents according to the principle of safe and rapid recovery first, important users first, urban residents later and agricultural load later;
3.5 Do a good job in the safety inspection of power equipment before the flood. Before the flood comes, the lines should be checked for wind resistance and flood resistance according to the requirements of flood control inspection outline of power supply enterprises, and the towers with reduced wind resistance and flood resistance should be treated, and the towers in low-lying areas and flood discharge areas should be reinforced by slope protection.
3.6 During the flood control period, emergency personnel in our hospital are on duty day and night, making records carefully and reporting the flood control situation to superiors in time;
4. The state of emergency is lifted.
When the following conditions are met at the same time, the flood control emergency rescue team can report the emergency state of lifting flood control to the company's emergency handling working group:
4. 1 Flood recedes;
4.2 the electricity consumption of important users and residents in the disaster area has basically recovered;
4.3 The wounded and transferred personnel are properly recovered.
5 Post-treatment
5. 1 After the task of quick repair and restoration of power supply (including temporary power supply) is basically completed, it will be gradually transferred to restoration and reconstruction as planned.
5.2 After the emergency treatment, the emergency facilities, equipment, instruments and other material reserves used for accident rescue shall be replenished in time.
5.3 After the flood control and emergency rescue work, we should summarize and analyze the experience and lessons of emergency treatment, formulate countermeasures and implement rectification.
5.4 In view of the power failure of important users caused by floods, it is necessary to keep abreast of the situation and do a good job in publicity and explanation.
- Previous article:A letter of condolence from the company to employees.
- Next article:Does the propaganda of drug knowledge in food packaging count as fraud?
- Related articles
- Class football slogan
- How is the effect of Tongrentang slimming tea? Are there any side effects of the price?
- The owner of the scenic spot is too involved! Is hanging a Dongsheng No Entry sign just to gain popularity?
- Games slogans and introductions with the theme of environmental protection and getting close to nature should be catchy and rhyming when used at the entrance of the games.
- Year-end self-examination report on epidemic prevention work
- What is the content of building a dream with ice and snow to welcome the Winter Olympics?
- What are the contents of Jinggangshan Red Training?
- What brand is Givenchy?
- What are the classic Cadillac quotes?
- What are the themed activities for kindergarten classes to celebrate the New Year?