Joke Collection Website - Bulletin headlines - What is "Eight Pictures and One Version" of architecture?

What is "Eight Pictures and One Version" of architecture?

"Eight pictures and one edition" may be called differently in different places.

For example: Some people call it "seven cards and one picture", which mainly include: project introduction and quality supervision report hotline card, project leader card, safety production system card, fire protection system card, and environmental protection system card. brand, engineering excellence brand, civilized construction brand and construction site layout plan. The single frame size is 1.2×0.64m, with a 25mm outer frame around it, with a thick line of 8mm and a thin line of 4mm. The panel is a steel plate with a blue background, the font is in bold, the title is in red with a white frame, the font height is 45mm, the content is in white with a blue background, the sign is fixed with angle steel around it, and is erected with steel pipes. The bottom of the sign is 1.3m above the ground. Generally, "seven signs and one picture" are placed in a prominent position near the entrance to the construction site. 1. Construction site project introduction and quality supervision reporting hotline: project name, project overview, main project quantities, construction scope, construction, design, construction, supervision, supervision unit name, start and completion date and quality supervision department reporting and supervision hotline: For example : Project Overview Project Name: Construction Unit: Project Responsible: Design Unit: Project Responsible: Surveying Unit: Project Responsible: Supervision Unit: Director: Construction Unit: Project Manager: Building Area: Structural Form: Construction Start Date: Number of Floors: Planned Completion Date : 2. Project Responsible Personnel Card: including the project manager, technical supervisor, safety officer, and quality supervisor of the construction unit. For example: List of organizational structure Project manager: Construction worker: Technician: Quality inspector: Safety officer: Tester: Materials officer: Documentation officer: Bricklayer class: Carpentry class: Steel bar class: Painting class: Electrician class: Plumbing class: Shelf class : Welding class: 3. Safety production system sign: mainly introduces the goals and requirements of safety production. For example: Ten measures for safe production 1. Use the "Three Treasures" in accordance with regulations 2. Mechanical equipment protection devices must be complete and effective 3. Machinery is not allowed to operate sick, overloaded or repaired and maintained during operation. 4. The installation of wires must meet the requirements, and all electrical equipment must be grounded. 5. On-site electric machinery and handheld power tools have leakage and tripping devices. 6. Scaffolding materials and placement must meet regulatory requirements. 7. Various cables and their devices must comply with regulatory requirements. 8. It is strictly forbidden to wear high heels, slippers, hard-soled and slippery shoes with spikes when working at heights. 9. The "four entrances" at the construction site must be protected with covers, and red lights should be set up to warn at night. 10. The roads at the construction site are smooth and materials and components are neatly stacked. 4. Fire protection system card: fire protection key points, key points and routine safety production fire protection work. Fill in the contents of Article 10 and Article 18 of the Fire Management Measures in the "Six-in-One" Management System Document. For example: 1. When preparing the construction organization design, there should be fire safety requirements. 2. The construction of work sheds at the construction site and between various areas must comply with fire prevention regulations. 3. All overhead wires are fixed with porcelain bottles, and the wall wires must pass through the tubes. 4. Open fire operations at the construction site must be approved by relevant departments before starting fire. 5. Fire prevention signs should be posted in warehouses, carpentry sheds and storage areas of flammable and explosive materials at the construction site. 6. The construction site must be equipped with a sufficient number of fire prevention and fire-extinguishing facilities and equipment. 7. It is necessary to establish a fire safety responsibility system and divide fire safety responsibility areas. 8. There must be a dedicated person on duty at the construction site to report any theft in a timely manner. 9. Non-construction personnel are not allowed to enter the construction site, and they must wear safety helmets when entering. 10. When going out with items, they can be released only after inspection. 5. Environmental protection system card: According to the special environmental protection requirements of the project location, a practical system that meets the requirements of national laws and local environmental protection regulations shall be formulated. For example: 1. Do not spit, litter, paper shells, paper scraps, or cigarette butts. 2. Do not run through red lights or walk freely. 3. Do not park indiscriminately or occupy the road. 4. Do not set up stalls randomly to affect traffic and sanitation. 5. Do not build randomly and damage the city appearance. 6. Do not dump garbage or litter. 7. Do not scribble or post advertisements or slogans randomly. 8. Do not damage or encroach on green space. 6. Engineering Excellence Brands For example: Ten Don’ts at Construction Sites 1. You are not allowed to enter the construction site without wearing a safety helmet.

2. No work at height is allowed without wearing a seat belt. 3. Workers who are not machinery operators are not allowed to operate machinery and equipment. 4. It is strictly forbidden to carry people on the hanging basket, and people are not allowed to get on or off. 5. It is not allowed to dismantle scaffolding materials and all protective facilities on the construction site without authorization. 6. No one is allowed to stand under the mixer hopper. 7. Workers working at heights are not allowed to throw debris from top to bottom. 8. It is not allowed to enter the construction site wearing slippers or bare feet. 9. Children are not allowed to enter the construction site. 10. It is not allowed to work while drunk. 7. Civilized construction signs, for example: Ten standards for civilized construction 1. Sign the "Three Guarantees" management contract in front of the door to identify the person responsible and put it on the sign. 2. Civilized construction should be included in the organizational design, and the site must have a general construction plan. 3. There should be brick walls around the construction site. 4. Construction machinery, building materials, and garbage should be stacked according to the layout plan. 5. Gates should be installed at the main entrances and exits of the construction site. 6. The construction site should ensure that the roads are smooth and there is no accumulation of water. Materials should be classified and stacked, and garbage should be removed in a timely manner. 7. Transportation of various building materials and garbage should be protected. 8. Water used at the construction site must be discharged in an organized manner after sedimentation. 9. After the project is completed, the work must be completed, the materials must be cleared, and the work shed must be dismantled in a timely manner. 10. Strengthen employee education and improve relations with surrounding people.