Measures for the Administration of Bidding in supervision bidding for Waterway Engineering Construction (for Trial Implementation)
Bidding work is divided into bidding, pre-qualification, bidding, bid opening, bid evaluation, bid selection and contract signing.
Supervision bidding construction should be completed before the construction bidding. Article 3 supervision bidding bidding for waterway engineering construction shall adhere to the principles of legality, openness, fairness and impartiality, and compete with management level, technical level, service quality and social reputation.
The bidding work is protected and constrained by the national laws, and the traffic administrative departments at all levels shall supervise and manage the activities of supervision bidding in the construction of water transport projects according to law. No unit or individual may interfere with normal bidding activities under any pretext. Article 4 The project legal person shall be responsible for organizing and implementing the construction of supervision bidding for water transport projects.
The project legal person can organize the bidding by itself, or entrust a professional institution with legal person qualification to bid as an agent. Fifth waterway engineering construction in supervision bidding bidding work to implement industry management.
The bidding work of supervision bidding for waterway engineering construction shall be under unified leadership and classified management. The traffic administrative department of the State Council manages the bidding of supervision bidding for national water transport projects, and the local traffic administrative departments at all levels and the agencies dispatched by the Ministry of Communications manage the bidding of supervision bidding for local water transport projects.
Supervision bidding bidding for large and medium-sized water transport projects above designated size and other important water transport projects is managed by the Ministry of Communications.
Supervision bidding bidding for waterway engineering projects other than the above-mentioned projects shall be managed by the local traffic administrative department.
Supervision bidding bidding for Sino-foreign joint ventures, cooperation, wholly foreign-owned and foreign-funded water transport projects shall be subject to the management and supervision of the traffic administrative department according to the above principles. Sixth supervision bidding bidding for waterway engineering construction shall be submitted for examination and filing. The bidding documents and prequalification results shall be reported to the superior traffic administrative department for review, and the bid evaluation report and results shall be reported to the superior traffic administrative department for the record. Chapter II Tendering Article 7 There are three ways for the construction of waterway engineering in supervision bidding: open tender, invitation tender and negotiation.
Open tender. The project legal person issues the tender announcement through newspapers, radio and television.
Invite public bidding. For a few general construction projects, the project legal person may invite several supervision units to participate in the bidding by means of letters, telegrams and faxes. No less than 3 units are invited for each project subject to tender.
Negotiation. For a single waterway engineering construction project with strong professionalism, great technical difficulty and special requirements, with the approval of the traffic administrative department at the higher level of the project, the supervision unit that meets the corresponding qualifications of the project may be invited to negotiate and determine the winning bidder. Eighth construction projects in supervision bidding, the whole construction project can be a one-time tender, can also be based on different functions and professions in stages, block bidding. However, it is forbidden to dismember the main project or only carry out supervision bidding construction. Ninth waterway engineering project construction in supervision bidding should meet the following conditions:
1. Construction funds have been secured;
2. The preliminary design documents have been approved;
3. The supervision bidding document has been compiled and submitted to the superior traffic administrative department for examination and approval according to the principle of hierarchical management;
4 conditional declaration to the competent department of construction. Tenth supervision bidding waterway engineering construction should be carried out according to the following procedures:
1. The project legal person determines the bidding method;
2. Prepare the tender documents;
3. Issue a tender announcement or invitation to bid (bid negotiation);
4. Publish prequalification requirements;
5. Pre-qualification of bidders;
6. Sell the bidding documents to the bidders who have passed the prequalification;
7. Organize bidders to inspect the project site and answer questions;
8. Organize the formulation of bid evaluation methods;
9. Accept the bidder's tender and review its compliance;
10. Organize the establishment of a bid evaluation committee or a bid evaluation team to conduct bid evaluation and recommend the winning bidder;
1 1. Project legal person calibration;
12. The project legal person signs a construction supervision contract with the winning bidder. Article 11 A project legal person or an entrusted agency engaged in bidding shall meet the following conditions:
1. Have the ability to organize the preparation of supervision bidding documents for waterway engineering construction;
2. Have the ability to review the qualification of tendering units for construction supervision of waterway engineering;
3. Ability to organize bid opening, bid evaluation and calibration activities. Article 12 The main contents of supervision bidding Announcement (Invitation Letter) on Waterway Engineering Construction:
1. An overview of the project subject to tender, including the project name, location, supervision scope, construction period, investment situation and the types, structures, scale and quantity of major projects;
2. The bidding method, time and place, and the starting and ending time and place of submitting the bidding application;
3. Qualification requirements for the tendering units;
4. The content requirements of the bid application;
5. Other matters.
- Related articles
- What activities will be held during the 2022 Harbin Maple Leaf Hot Spring Town Dragon Boat Festival?
- Summer greetings are very short.
- How to draw a poster of Lei Feng's good example? Senior one learns Lei Feng's spiritual manuscript.
- On November 23rd, Chang 'an Road Street, beilin district, Xi 'an issued a home office proposal.
- Theme name of moon cake
- One word difference composition
- What's the birthday word?
- Some down-to-earth anti-fraud slogans at the entrance of the community (collection of 40 sentences)
- The slogan of Olympic torchbearers
- Where is the Sichuan Airlines counter at Guangzhou Baiyun Airport?