Joke Collection Website - Bulletin headlines - Summary of the development of river length system

Summary of the development of river length system

summary of the development of the river length system

the summary of the development of the river length system is conducive to enhancing the awareness of ecological civilization in the whole society. The following summary of the development of the river length system is what I want to share with you. Welcome to browse.

the first part: summary of the development of the river length system

I. Main ideas

Thoroughly implement the spirit of the Fifth Plenary Session of the 18th CPC Central Committee, the 12th Plenary Session of the 13th Provincial Party Committee and the provincial and municipal river length meetings, and follow the "Tonggu County? River length system? Implementation plan ",to? Three strictness and three realities? Work style, closely around building ecological civilization? Bronze drum model? This theme, according to? Establish management and protection institutions, clarify management and protection responsibilities, unify management and protection standards, and strictly assess management and protection? Requirements, full implementation? River length system? Establish a comprehensive management system for rivers, lakes and reservoirs with clear responsibilities, sound systems and efficient operation, and comprehensively rectify indiscriminate occupation, construction, enclosure, excavation, dumping and dumping? Four chaos? Question, fully realize that there is no garbage on the river surface, no barrier in the river, no sedimentation at the river bottom, no turbidity in the river, no damage to the river bank, no direct discharge of sewage, no damage to greening, no violation of regulations along the river, etc. in the county? Eight nothing? Goal, comprehensive construction? Smooth river, clear water, green shore and beautiful scenery? Beautiful bronze drums with beautiful mountains and rivers.

Second, the main work

(1) Arrange the deployment in time and improve the organizational system

1. All townships and towns issued the "? River length system? Implementation plan ",established? River length system? Manage the work leading group and office, and implement full-time staff (2-3) and the required working funds. Clear all levels? River chief? And the river reservoir? Sheriff? , protect the river (lake), formulate "? River length system? Work evaluation method ",the introduction of" 2xx work points "and"? River length system? Work system ",and held a special meeting to arrange deployment, full implementation? River length system? . (responsible unit: villages and towns, time limit for completion: 2xx, April 1th)

2. Set up in a prominent position on the river bank and lakeshore? Chief of the river library? Public signs, indicating? Chief of the river library? Name, responsibilities, rectification objectives and supervision telephone number, etc., subject to public supervision. (responsible unit: villages and towns, time limit for completion: April 15th, 2xx)

3. Before April 1th, 2xx, all departments shall, according to the division of responsibilities, issue a departmental targeted "? River length system? Work plan ",clearly in charge of the leadership and specific cadres focus on? River length system? Work. (responsible unit: relevant departments, completion time: April 1th, 2xx)

(II) Make a comprehensive investigation and establish the archives of rivers and reservoirs

The relevant departments will take the lead, and each township will be responsible for the investigation and mapping, fully grasp the water quality status of rivers and lakes and the planning objectives for water quality improvement, grasp the composition and distribution of industrial point sources, agricultural non-point sources and domestic pollution sources of polluted water bodies, and comprehensively register and establish river information. One river and one gear? 、? A library and a file? . The summary table of investigation by the leading departments shall be submitted before April 22, 2xx? County river head office? County Water Affairs Bureau.

1. Make a comprehensive investigation on the information such as the process or area of rivers and lakes, the thickness of sediment, the number of dams and dams, and register them in the form of words, tables and pictures, and establish dynamic files. (lead unit: county water affairs bureau, responsible unit: villages and towns, completion time: 2xx, April 22nd)

2. Comprehensively investigate the water quality of rivers and lakes and the number of pollutant discharge enterprises along the line, register them in the form of words, tables and pictures, and establish dynamic files. (Lead unit: County Environmental Protection Bureau, participating unit: County Industry and Information Committee, County Industrial Park, responsible unit: villages and towns, completion time: 2xx April 22).

3. Comprehensively investigate the number of sewage outlets in rivers and lakes, register them in the form of words, tables and pictures, and establish dynamic files. (lead unit: county urban management bureau, participating unit: county water affairs bureau, responsible unit: villages and towns, completion time: 2xx April 22nd)

4. comprehensively investigate the agricultural non-point source pollution, register and create dynamic files in the form of words, tables and pictures respectively. (lead unit: county agricultural bureau, responsible unit: each township farm, completion time: 2xx April 22nd)

5. Comprehensively investigate the livestock and poultry breeding situation along rivers and reservoirs, register them in the form of words, tables and pictures, and establish dynamic files. (Lead unit: County Animal Husbandry and Fisheries Bureau, responsible unit: each township farm, time limit for completion: 2xx April 22nd)

6. Comprehensively investigate the environmental sanitation of rivers and reservoirs, register in the form of words, tables and pictures, and establish dynamic files. (lead unit: agriculture and industry department of the county party Committee (rural area), participating units: county urban management bureau (county riverside), county water affairs bureau (county water area), responsible unit: each township, completion time: 2xx April 22)

7. Comprehensively investigate the illegal sand mining behavior of rivers and reservoirs, register and create dynamic files in the form of words, tables and pictures respectively. (lead unit: county water affairs bureau, participating units: county environmental protection bureau, county forestry bureau, county land and resources bureau, responsible unit: villages and towns, completion time: 2xx, April 22nd)

8. Comprehensively investigate the' illegal occupation and construction' behavior of rivers and reservoirs, register and create dynamic files in the form of words, forms and pictures respectively. (Lead unit: County Urban Construction Bureau, participating units: County Water Affairs Bureau, County Urban Management Bureau, County Land and Resources Bureau, responsible unit: each township farm, completion time: 2xx, April 22nd)

9. Comprehensively investigate the chaotic behavior of rivers, register and create dynamic files in the form of words, forms and pictures respectively. (lead unit: county water affairs bureau, responsible unit: villages and towns, time limit for completion: 2xx April 22nd)

1. Comprehensively investigate the greening and wetlands along rivers and reservoirs, register them in the form of words, forms and pictures, and establish dynamic files. (lead unit: county forestry bureau, responsible unit: villages and towns, completion time: 2xx April 22)

(iii) Carry out centralized remediation and optimize the ecological environment

Each lead department and each village and town will study and determine the specific measures and progress of comprehensive management of rivers and lakes according to the work requirements, so as to achieve? One river and one policy? 、? One library and one policy? . Focus on water quality standards testing, industrial enterprise management, sewage interception into pipes and direct drain plugging, agricultural pollution control, livestock and poultry breeding norms, water bank cleaning, illegal sand mining remediation, investigation and punishment of illegal occupation and construction, chaos around and blocking rectification, and river bank greening? Ten renovation projects? . The leading departments and towns and villages will report to? County river head office? (County Water Affairs Bureau) submit the "Special Renovation Work Plan" and submit the "Summary of Special Renovation Work" before May 31, 2xx.

1. The water quality of rivers and reservoirs shall meet the overall standards, and the test results shall be announced to the public regularly, and special rectification shall be carried out for rivers and reservoirs with substandard water quality. (lead unit: county environmental protection bureau, responsible unit: villages and towns, completion time: 2xx May 31)

2. Enterprises on both sides of the river and around the reservoir will meet the wastewater discharge standards, and special rectification will be carried out for enterprises that fail to meet the discharge standards. (lead unit: county environmental protection bureau, participating units: county industrial and information commission, county industrial park, responsible units: towns and villages, time limit for completion: 2xx May 31st)

3. All sewage along rivers and reservoirs will be intercepted, all sewage will be put into pipes, and special rectification will be carried out for sewage outlets. (Lead unit: County Urban Management Bureau, participating units: County Urban Construction Bureau, County Committee Ministry of Agriculture and Industry, County Environmental Protection Bureau, County Agriculture Bureau, County Animal Husbandry and Fisheries Bureau, County Public Security Bureau, responsible unit: villages and towns, completion time: May 31, 2xx)

4. Strengthen agricultural non-point source pollution control, prohibit the use of high-toxic and high-residue pesticides such as methamidophos, actively promote high-efficiency and low-residue pesticides, and carry out (lead unit: county agricultural bureau, responsible unit: each township farm, completion time: 2xx May 31)

5. Livestock and poultry breeding on both sides of the river and around the reservoir will be standardized, and fishery resources protection and special rectification of livestock and poultry aquaculture pollution will be carried out. (Lead unit: County Animal Husbandry and Fisheries Bureau, responsible unit: each township farm, completion time: 2xx May 31)

6. There is no accumulated garbage on the water surface and banks of rivers and reservoirs, and special rectification of domestic garbage treatment in rural rivers and lakes will be carried out. (Lead unit: Ministry of Agriculture and Industry of the county party committee, responsible unit: each township, completion time: 2xx May 31st)

7. Illegal sand mining is prohibited in all rivers and reservoirs, and special rectification of illegal sand mining is carried out. (lead unit: county water affairs bureau, participating units: county environmental protection bureau, county forestry bureau, county land and resources bureau, county public security bureau, etc., responsible units: towns and villages, completion time: May 31, 2xx)

8. All rivers and reservoirs are prohibited from occupying and building indiscriminately, and special rectification is carried out. (lead unit: county urban construction bureau, participating units: county water affairs bureau, county urban management bureau, county land and resources bureau, county transportation bureau, county forestry bureau, county agricultural bureau, county local maritime bureau, county public security bureau, responsible unit: villages and towns, completion time: May 31, 2xx)

9. All rivers and reservoirs are forbidden to be surrounded and blocked, and special rectification is carried out. (Lead unit: County Water Affairs Bureau, responsible unit: each township, completion time: 2xx May 31st)

1. All rivers and reservoirs will promote coastal greening and wetland restoration and protection, and carry out special rectification of the ecological environment of rivers and lakes. Each township should build 1-2 high-level demonstration sites of water ecological civilization (including 2 towns and 1 township and field). (lead unit: county forestry bureau, participating unit: county water affairs bureau, responsible unit: villages and towns, completion time: 2xx May 31)

(4) Strengthen capacity building and lay a solid foundation for work

1. Carry out the construction of water quality, quantity and water environment monitoring network for rivers and reservoirs. Strengthen the monitoring of water quality, water quantity and water environment of river cross-border sections, main intersections, key waters and key reservoirs. (county environmental protection bureau, county water affairs bureau, county hydrological station, each township field)

2. Establish a mechanism for investigating the deterioration of water quality and tracing the source of pollution. (county environmental protection bureau, county water affairs bureau, etc., all villages and towns)

3. Dock the construction of provincial and municipal rivers and lakes management geographic information system platform, and gradually realize the informationization and digitization of basic data, river-related projects, water shoreline management, water quality monitoring, etc. Establish county and township levels? River chief? Instant communication platform, including daily inspection, complaint reporting, problem supervision, situation notification, responsibility implementation, problem handling, etc. into information and integrated management. (County Water Affairs Bureau, County Environmental Protection Bureau, County Industry and Information Committee, County Land and Resources Bureau, County Transportation Bureau, County Local Maritime Bureau, County Urban Construction Bureau, County Urban Management Bureau, County Agricultural Bureau, County Animal Husbandry and Fisheries Bureau, County Forestry Bureau, County Committee Agriculture and Industry Department, etc., all township farms)

4. Establish a joint law enforcement mechanism for river and reservoir protection and management led by the county party committee office and the county government office, with the participation of relevant departments. Centralized office, unified management and coordinated law enforcement? Mode, overall planning involves the administrative law enforcement function of river and reservoir protection management. (county office, county government office, county office, county water affairs bureau, county environmental protection bureau, county market supervision and management bureau, county forestry bureau, county land and resources bureau, county urban construction bureau, county agricultural bureau, county animal husbandry and fisheries bureau, county transportation bureau, county local maritime bureau, county urban management bureau, county public security bureau, county legal affairs bureau, county power supply company, etc., all townships and towns)

5. Developing leading cadres' waters and beaches. (County Audit Bureau)

6. Carry out? Six are the most beautiful? Selection activities? And commend and reward units and individuals who have made outstanding achievements and achieved remarkable results. (County Party Committee Organization Department, County Water Affairs Bureau, etc., all villages and towns)

(5) Intensify publicity and create a strong atmosphere

Give full play to the functions of mainstream media such as Tonggu TV station, Tonggu newspaper, Tonggu government network, mobile phone newspaper and WeChat platform, carry out multi-form, multi-faceted and continuous in-depth publicity activities, and actively create the concern, support and participation of all walks of life and the people. One is publicity? River length system? The new measures and new practices, publicity party committee and government to protect the ecological environment of rivers and reservoirs of major decisions and deployment. The second is to carry out follow-up publicity of special rectification actions to create momentum and promote the rectification effect. The third is to do well? River length system? Related information release. Fourth, based on raising the awareness of ecological civilization of the whole society, carry out the work of river chiefs? Into the countryside, enterprises, communities, campuses, and institutions? Activities, cohesion of ecological civilization construction * * * knowledge and resultant force. Fifth, increase the exposure of illegal cases, give full play to the role of news media and public opinion supervision, and strive to guide enterprises and individuals to consciously fulfill their social responsibilities, consciously prevent pollution and pollution, and vigorously develop a green circular economy. The sixth is to establish a water conservation mechanism in love the water, tap the advanced model of water conservation work in love the water, and hire? Obligatory supervisor? In other forms, fully mobilize the public to actively participate, and actively create a strong public opinion atmosphere in which the whole people care, support and supervise the management of rivers and lakes. Part ii: summary of the development of the river length system

1. strengthen leadership and improve institutions

in order to do a good job in the prevention and control of water pollution in major rivers in the whole region, the district government has set up a leading group for the prevention and control of water pollution in major rivers, with the district head as the leader, seven deputy heads involved in related work as the deputy heads, and the main leaders of 13 relevant departments at the district level as members, and established a contact meeting system for environmental protection work. At the same time, 19 relevant townships and 7 district-level departments are required to set up corresponding leading bodies, with clear leaders in charge and part-time environmental protection personnel, so as to strengthen the leadership over the prevention and control of water pollution in major rivers at all levels to ensure that all work is implemented. And issued a series of documents such as "Notice on Doing a Good Job in the Prevention and Control of Water Pollution in Major Rivers in 2xx", which clarified the objectives and responsibilities of all relevant towns and departments, and required to formulate specific work plans, refine tasks, and ensure that all work achieved practical results.

Second, the completion of the target tasks

Our district actively organized and implemented the prevention and control of water pollution in major rivers, and completed the domestic sewage treatment tasks in 12 towns, with a completion rate of 1%; 5 domestic waste treatment projects, with a completion rate of 1%; 2 livestock and poultry farm management projects, with a completion rate of 1%; 2 slaughterhouse management projects, with a completion rate of 1%; 1946 biogas digesters were built in rural areas, with a completion rate of 1%; Completed all the objectives and tasks in 2xx in full. * * * The total investment is 26.778 million yuan.

1. Domestic sewage treatment. This year, the city assigned the task of centralized treatment of domestic sewage in four towns and villages in our district. Our district has treated domestic sewage in five towns and villages, such as Gaoliang Town, Tai 'an Township, Tongfu Township, Sujia Township and Xindian Township, and adopted the treatment process combining anaerobic purification and constructed wetland to build centralized treatment facilities for domestic sewage in towns and villages. It is estimated that the total investment is about 16 million yuan, and the main body is now under construction.