Commitment letter of construction period quality

With the gradual development of society, the frequency of entrepreneurship appears in our field of vision more and more frequently. Whether the commitment is legally binding depends on specific issues. Before writing, you can refer to the model essay. The following are five quality commitment letters of the construction period I collected for reference only. Welcome to reading.

Letter of Commitment on Construction Period Quality of Xinhua District Animal Husbandry Bureau of Fiona Fang 1 to

If our unit is lucky enough to win the bid for Bid B of the 20xx standardized scale pig farm construction project of Xinhua Animal Husbandry Bureau, in the process of project implementation, in addition to responding to all the terms of the bidding documents and the contents of the performance contract, we will also make the following commitments to meet the construction period requirements:

First, ensure that the construction is carried out in strict accordance with the drawings and relevant specifications, and reach the qualified standards.

Second, formulate the time limit for a project management organization and safety management responsibility system, equip with enough safety production equipment and personnel, and earnestly implement the regulations on accelerating construction management.

Three, all engineering construction personnel ready to speed up the construction period in advance, and do a good job in ideological work.

Five, to ensure that within the time limit for a project, safe, high quality and efficient to complete the construction task. Six, after receiving the letter of acceptance, sign the project contract, after the construction equipment has the conditions to start, ensure that it is completed within the time limit required by the owner, and if it is postponed, it is willing to compensate 0.03%/ day of the total project cost.

Commitment: _ _ _

20__ _ _ _ _ _ _ _

Commitment letter to _ _ _ co., LTD. The second part:

Upon receipt of your tender documents, our company will immediately organize relevant personnel to make a careful study and prepare the tender according to the scope and requirements of the tender documents. Now, in combination with the actual situation of our company, we make the following commitments to the tenderee in terms of contract conditions, time limit, quality, safe and civilized construction, settlement data, wage payment for migrant workers, warranty and so on:

1. Commitment to contract conditions: acknowledge and accept the requirements of your tender documents and the constraints of contract conditions;

2. Time limit commitment: If our company wins the bid, our company promises to start construction within the specified time after receiving the notice of commencement, and complete all the project construction according to the contract time limit and node requirements;

3. Project quality commitment: ensure that the construction is carried out in accordance with the technical requirements and quality requirements of the bidding documents, and ensure that the project is qualified and meets the excellent engineering standards;

4. Commitment to safe and civilized construction: strictly abide by the People's Republic of China (PRC) Law on Safe Production, Regulations on Safety Production in Construction Projects, Regulations on Safety Production License and other laws and regulations to ensure that there are no major accidents and the construction site reaches the first-class safe and civilized site;

5. Commitment to submit settlement data: submit complete and effective settlement data at one time within the day after the formal handover of the project;

6. Commitment to pay migrant workers' wages: establish a roster of migrant workers, publicize the payment of migrant workers' wages on time every month, and accept the supervision and verification of the labor and social security department and your company to ensure that migrant workers' wages can be paid in full and on time;

7. Warranty commitment: Our company promises to be responsible for any quality defects and their consequences of this project within the warranty period stipulated in the contract, and fulfill the warranty obligations in time according to the contract.

Commitment: _ _ _

20__ _ _ _ _ _ _ _

Commitment letter of time limit for a project quality 3 In order to ensure the smooth progress of the _ _ _ project undertaken by this unit, the following commitments are made:

A, quality assurance:

1, strictly implement _ _ project requirements and relevant notices, and implement _ _ specifications and standards. Establish and improve the project organization and quality management system, clarify the responsibilities of each post, ensure the quality of project development, and ensure the smooth progress of project development.

2. Implement the post responsibility system for project managers. The project manager and the person in charge of resource package development are fully responsible for the project quality, responsible for establishing and improving the project guarantee system, regularly checking and coordinating, holding a project review summary meeting, and strictly implementing the reward and punishment system.

3, timely report to _ _ _, and accept the inspection, guidance and supervision of supervision experts and project management team.

Second, the construction period guarantee:

If we win the bid, our company will complete the development task on time in strict accordance with the requirements of the Project on the premise of ensuring the quality of the project.

1, organize reasonable measures:

1) is uniformly scheduled and managed by the project management team.

2) Implement the specific tasks of each development team in time and make preparations in advance.

2, the implementation schedule management:

1) Arrange plans every week, issue development progress indicators, and clarify responsibilities and tasks.

2) Hold a weekly coordination meeting to coordinate the work and development progress with the cooperative units, and solve the factors that delay the project development cycle in time.

In case of violation of the above terms, this unit is willing to bear all the consequences. If you break the law, you will be investigated for legal responsibility.

Commitment: _ _ _

20__ _ _ _ _ _ _ _

Duration Quality Commitment Article 4 In order to ensure that the quality, duration and safety of the elevator installation project of this project meet the predetermined requirements, prevent the occurrence of production safety accidents, ensure the safety of personnel and property, safeguard the common interests of Party A and Party B, and maintain a good working order and sanitary environment on the construction site, in accordance with the Construction Law, the Safety Production Law, the Regulations on the Administration of Work Safety in Construction Projects, and relevant laws, regulations, rules and mandatory standards of engineering construction,

I. Overview of the Project

Project name:

Project location:

Building height:

Building area:

Building structure:

Second, the project objectives

Quality objective: First acceptance rate: 100% Time limit for a project objective: finish the project content according to the agreed time.

20xx to 20xx civilized construction objectives: standardization, civilized construction, no public security accidents;

1. Casualty accidents: 0;

2. Fire accidents: 0;

3. Equipment accident: No important elevator equipment, construction equipment and testing equipment were lost.

Three. duties and obligations

1. Before the installation time agreed in this agreement, Party B is responsible for sending personnel to the installation site for civil engineering investigation, confirming the installation conditions on site, providing consulting services to Party A and proposing rectification requirements, agreeing with Party A on the specific commencement date, and providing detailed installation and safe construction plans;

2. Party B shall obey the safety production management of Party A and the unified command of Party A's construction site, and have the right to refuse the instruction of Party A that violates the safety production regulations;

3. Party B shall be responsible for relevant equipment and materials, construction scheme and completion acceptance data. After the installation is completed, Party B shall be responsible for organizing relevant departments to conduct acceptance and obtain relevant operation certificates, and the expenses shall be borne by Party B.:

4. Before the construction, Party B shall complete the relevant construction procedures by itself. If there are procedural disputes, Party B shall solve them in time;

5. After Party B's equipment and related materials arrive at the site, it will count the equipment and related accessories and auxiliary materials together with the owner and supervision unit, and unload the goods to the place designated by Party A, and take fire prevention and anti-theft measures;

6. Party B shall be responsible for unpacking, counting, hoisting and unloading elevator equipment (Party A shall cooperate with unpacking, counting and hoisting, and the expenses shall be borne by Party B);

7. Party B shall prepare and keep the instruments and equipment for installation and construction, and Party B shall be responsible for the lighting in the elevator shaft;

8. Party B is responsible for installation, commissioning, operation and maintenance until it passes the acceptance of the elevator quality inspection department at the place where the equipment is installed and obtains the transportation license;

9. Party B shall, according to the requirements of Party A, give priority to the installation and construction of public equipment and provide working faces for other public equipment units. First, cooperate with public equipment to install elevator doors, etc. After installation, safety protection measures and warning signs should be taken to prevent safety accidents, and be responsible for the protection of finished or semi-finished products such as door frames. Responsible for the acceptance of the corresponding concealed works, and make a written handover of process, safety, quality and hygiene after installation;

10. The construction personnel of Party B shall not dismantle or change the scaffolding, various safety protection measures, safety signs and warning signs on the construction site without authorization. If it is really necessary to dismantle and modify, it must be approved by the person in charge of Party A and the safety management personnel, and necessary and reliable safety measures must be taken before dismantling and modifying. The consequences caused by the unauthorized transfer and change of Party B's personnel shall be borne by Party B itself;

1 1. Party B shall be solely responsible for the erection, dismantling, maintenance and transformation of safety protection facilities (such as scaffolding, holes, boundaries, etc.) within the construction jurisdiction. Must comply with relevant safety standards and Party A's requirements for overall safety protection on the construction site;

12. Party B needs scaffolding and needs to build and dismantle it by itself. Party A shall provide materials (relevant expenses shall be borne by Party B). If Party A needs to build and dismantle, the expenses shall be borne by Party B;

13. Party B shall be responsible for keeping its equipment and components, and pay attention to the protection and theft prevention of finished products and semi-finished products until the completion acceptance;

14. according to the national elevator installation specification and relevant elevator quality standards, complete the installation and debugging of the equipment. The installation and inspection of elevator equipment shall conform to the national standards of People's Republic of China (PRC) and be manufactured according to or higher than the current national standards. The quality standard after installation should also meet the above standards;

15. Party B shall assign full-time management personnel to be responsible for safety and technology, safety, technology and coordination during installation, participate in on-site construction coordination meeting, and cooperate with Party A's civil engineering and other units in construction;

16. Party B is responsible for the accommodation expenses, labor insurance and personal insurance of the construction personnel;

17. Party B shall be fully responsible for the management of construction electricity within the jurisdiction of construction. Party B shall provide its own distribution box and cable meeting safety standards to the construction site;

18, Party B's construction personnel must strictly abide by the rules and regulations of Party A's construction site to ensure safe and civilized construction and garbage disposal during installation;

19. When entering the construction site, Party B's construction personnel shall wear protective articles such as safety helmet and safety belt;

20, before the construction of hazard prediction education. Manage the safety of operators of special types of work, ensure that the operators of special types of work hold certificates, and be responsible for establishing the files of operators of special types of work and filing them with Party A;

2 1. Party B shall obey the civilized construction management of the construction site and be responsible for the civilized construction management of the construction area under its jurisdiction. Ensure the smooth flow of fire exits in the area under its jurisdiction;

22. When installing and maintaining elevators, Party B's construction personnel shall resolutely avoid drunken operation, illegal operation, risky operation and barbaric operation;

23. During the construction, Party B must strictly implement various fire and explosion prevention systems. Smoking and open flames are strictly prohibited in inflammable and explosive places, and fire-fighting equipment shall not be used for other purposes. Electric welding, gas welding and gas cutting operations shall go through the formalities for examination and approval of hot work according to regulations, strictly abide by the "Ten No Burning" regulations, and it is forbidden to use electric furnaces. Do a good job in fire emergency protection measures. If Party B's personnel fail to carry out the construction as required, causing fire, all losses and responsibilities shall be borne by Party B, and Party A will impose a fine of 5,000 yuan-.

24. Party B shall ensure the construction safety. In case of personal safety accidents and other injuries and losses caused by improper safety measures or failure to carry out construction according to specifications, Party B shall bear all the accidents and economic responsibilities, and Party A will impose a fine of 5,000 yuan;

25. During the construction, Party B shall protect the finished products or semi-finished products of other construction units, and repair them in time if damaged, or contact relevant professional construction units for repair, and bear the expenses arising therefrom;

26. Party B is responsible for the self-inspection and acceptance of installation quality, and applies to the local special equipment safety supervision and management department for acceptance, and bears the acceptance expenses;

27. Party B shall be responsible for the rectification and acceptance expenses of the second inspection caused by installation quality problems;

28. Train Party A's system management, operation and simple maintenance personnel at the installation site at least 2 people. Can provide practical technical training according to Party A's needs. To enable Party A's personnel to independently manage, troubleshoot and maintain daily tests, so that the equipment provided by Party B can operate normally and safely;

29. If the project cannot be completed on time due to Party B's reasons, Party B shall pay a penalty of RMB 500-20xx/day to Party A for each day of delay (handover date or construction period). If the delay in completion causes losses to Party A, Party B shall also compensate Party A according to the facts;

30. On the premise of ensuring the quality, Party B shall complete the construction task as scheduled, deal with the problems in the construction in time, and negotiate with Party A to solve them in time;

3 1. If the installation project completed by Party B is unqualified, Party B shall immediately rework it until it is qualified, and shall compensate Party A for the losses according to the facts;

32. If Party B commits any of the following acts, it will be fined 50-500 yuan for each violation.

(1) Failing to lay and set protective railings as required for high-altitude operations;

(2) Don't wear a helmet to enter the site and don't wear a seat belt as required;

③ Working at heights without protective facilities or with incomplete protective facilities;

(4) Non-special operators are engaged in special operations, and special operators do not hold certificates; ⑤ Non-workers grope for mechanical and electrical equipment;

⑥ Failing to carry out the safety technical disclosure of this type of work, operating illegally and taking risks; All landowners don't take the formal safe passage, climbing railings, scaffolding and other illegal behaviors; (8) throwing objects down when working at heights;

Pet-name ruby mechanical and electrical equipment lack of protective devices, not according to the operating rules; Attending to destroy all kinds of protective devices, protective facilities and safety signs, without the approval of the project intends to, shall not be arbitrarily moved or removed;

33, after the completion of the elevator installation, acceptance, must be handed over to the owner, the construction unit to use in advance, after the operator's salary is properly charged, shall not increase the extra cost.

This agreement shall come into effect after being signed and sealed by the representatives of both parties: in duplicate, with each party holding one copy.

Party A:

On behalf of:

Date:

Party B: Representative: Date:

Time limit for a project quality commitment Article 5 In order to ensure the smooth progress of the XXX project undertaken by this unit, the following commitments are made:

A, quality assurance:

1, strictly implement the requirements of XX project and relevant notices, and implement XXX specifications and standards. Establish and improve the project organization and quality management system, clarify the responsibilities of each post, ensure the quality of project development, and ensure the smooth progress of project development.

2. Implement the post responsibility system for project managers. The project manager and the person in charge of resource package development are fully responsible for the project quality, responsible for establishing and improving the project guarantee system, regularly checking and coordinating, holding a project review summary meeting, and strictly implementing the reward and punishment system.

3, timely report to XXX, and accept the inspection, guidance and supervision of supervision experts and project management team.

Second, the construction period guarantee:

If we win the bid, our company will complete the development task on time in strict accordance with the requirements of the Project on the premise of ensuring the quality of the project.

1, organize reasonable measures:

1) is uniformly scheduled and managed by the project management team.

2) Implement the specific tasks of each development team in time and make preparations in advance.

2, the implementation schedule management:

1) Arrange plans every week, issue development progress indicators, and clarify responsibilities and tasks.

2) Hold a weekly coordination meeting to coordinate the work and development progress with the cooperative units, and solve the factors that delay the project development cycle in time.

In case of violation of the above terms, this unit is willing to bear all the consequences. If you break the law, you will be investigated for legal responsibility.

Commitment party: XXX

Signature of legal person:

Seal: 20XX year1October 30th.